Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Advanced Control Systems for Wave Energy Converters

This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture efficiency at a reference site on an MHK device developed by Resolute Marine Energy, Inc. (RME). The submission also contains an LCOE model that estimates the performance and related energy cost improvements that each advanced control system might provide and recommendations for improving DOE's LCOE model. The two types of control systems are for wave energy converters which transform data into commands that, in the case of RME's OWSC wave energy converter, provide real-time adjustments to damping forces applied to the prime mover via the power take-off system (PTO). The control theories developed were: 1) Model Predictive Control (MPC) or so-called "non-causal" control whereby sensors deployed seaward of a wave energy converter measure incoming wave characteristics and transmit that information to a data processor which issues commands to the PTO to adjust the damping force to an optimal value; and 2) "Causal" control which utilizes local sensors on the wave energy converter itself to transmit information to a data processor which then issues appropriate commands to the PTO. The two advanced control policies developed by Scruggs and Re Vision were then compared to a simple control policy, Coulomb damping, which was utilized by RME during the two rounds of ocean trials it had conducted prior to the commencement of this project. The project work plan initially included a provision for RME to conduct hardware-in-the-loop (HIL) testing of the data processors and configurations of valves, sensors and rectifiers needed to implement the two advanced control systems developed by Scruggs and Re Vision Consulting but the funding for that aspect of the project was cut at the conclusion of Budget Period 1. Accordingly, more work needs to be done to determine: a) means and feasibility of implementing real-time control; and b) added costs associated with such implementation taking into account estimated effects on system availability in addition to component costs.

16 TIDAL AND WAVE POWER↗

Light Water Reactor Sustainability Program: Digital Technology Business Case Methodology Guide

The Department of Energy’s (DOE’s) Light Water Reactor Sustainability Program aims to develop and deploy technologies that will make the existing U.S. nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies Pathway is part of the DOE’s Light Water Reactor Sustainability (LWRS) Program. It conducts targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systems of the U.S. operating light water reactor (LWR) fleet. This work involves two major goals: (1) to ensure that legacy analog II&C systems are not life-limiting issues for the LWR fleet and (2) to implement digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Resolving long-term operational concerns with the II&C systems contributes to the long-term sustainability of the LWR fleet, which is vital to the nation’s energy and environmental security. The II&C Pathway is conducting a series of pilot projects that enable the development and deployment of new II&C technologies in existing nuclear plants. Through the LWRS program, individual utilities and plants are able to participate in these projects or otherwise leverage the results of projects conducted at demonstration plants. Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) addresses the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the "benefits" side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Automatic Complexity Reduction

This is the final report for LDRD project 12-ERD-038 titled Automatic Complexity Reduction. The original budget request was for $\$1.1$M for three years, the project was instead funded at $\$420$K for three years. The team consisted the PI Daniel White, post-doctoral researcher Kyle Lange, and staff member Mark Stowell. This work largely builds upon the research of Matt Stephanson, who was a summer scholar at LLNL. This report will provide a high level overview of the problem and the solution approach, as well as results, and future research directions.

42 ENGINEERING↗

Pilot Project Technology Business Case: Mobile Work Packages

Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are “harvestable,” meaning they result in an actual reduction in headcount and/or cost. The report describes the specific activities conducted with a partner utility to examine the various work activities associated with mobile work packages to determine what time savings and error rate reductions are available. The report summarizes these findings in the form of a business case for the technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Low Cost Glass-Ceramic Matrix Composite Heat Exchanger

As part of ARPA-E’s High Intensity Thermal Exchange through Materials and Manufacturing Processes (HITEMMP) program, this project sought to develop novel heat exchanger (HX) capabilities to enable efficient and power dense power generation cycles. This class of HX comes under the category of ceramic/composite materials with the higher temperature goal in the program of ≥1100 °C inlet temperature operation. The enabling capability of this effort is the use of glass-ceramic matrix composite (GCMC) material which provides the high temperature durability of a ceramic, the flaw tolerance of a composite, a significantly faster and lower cost manufacturing process than conventional matrix CMCs and very low porosity levels < 0.5%. For thin-walled HX structures and the need to minimize leakage, the low porosity differentiator is particularly important. RTRC has prior experience with this material system and in the current project advanced the component design and manufacturing methods into new territory to produce features required for effective heat exchange under high pressures. In this approach, silicon carbide fiber is fabricated into a fiber preform using various textile processes. Graphite tooling is used both during the build-up of the fiber preform (interior tooling) and after the fiber preform has been completed (exterior tooling). This tooling assembly is heated to high temperature in an environment that has been evacuated and backfilled with inert gas. A reservoir of specialty glass is present and once the desired temperature has been reached to achieve the desired glass viscosity, an actuator distributes the glass throughout the fiber preform using passageways which are part of the tooling design in a process known as glass transfer molding. After the tooling has been removed, the composite is heat treated to convert the amorphous glass to a crystalline ceramic, providing improved properties. The project was divided into three phases focusing on the following: 1) 10 kW HX design and coupon-level tube sheet fabrication, 2) 10 kW HX fabrication, 3) 50 kW HX fabrication. During Budget Period 1 (BP1), additional risks were encountered and the need for additional funds was agreed upon by ARPA-E program leadership. Due to a variety of factors, the contract modification required nominally 18 months to execute at which time the HITEMMP program was effectively concluding. Because of this and the time that would be required to perform BP2 tasks, it was decided to conclude the project at the end of BP1. During the design of the 10 kW HX, manufacturing constraints were learned and incorporated, leading to a revised configuration for the fiber preform and HX. Heat exchange and pressure drop predictions also played a role in modifying the original design concept to be a higher aspect ratio shell-and-tube HX, simplifying the manufacturing process and improving the heat exchanger performance. Good gravimetric and volumetric thermal power densities of 11.2 kW/kg and 10,200 kW/m3 for the entire HX were projected that involved thermo-structural Finite Element Analysis to determine the structural mass needed for the high operation pressures of 250 bar cold inlet and 80 bar hot inlet. Fiber preforms using textile processes were produced for multiple headered tube sheets. Additional challenges were encountered during the glass transfer molding step for which solutions were identified, but programmatics did not allow them to be implemented in BP1. While complete HX test articles were not fabricated, the benefits of this GCMC material for a variety of high temperature applications remain.

30 DIRECT ENERGY CONVERSION↗

The applicability of DOE solar cell and array technology to space power

An evaluation of the main terrestrial photovoltaic development projects was performed. Technologies that may have applicability to space power are identified. Where appropriate, recommendations are made for programs to capitalize on developed technology. It is concluded that while the funding expended by DOE is considerably greater than the space (NASA and DOD) budget for photovoltaics, the terrestrial goals and the means for satisfying them are sufficiently different from space needs that little direct benefit currently exists for space applications.

Scott-Monck, J. A.↗

Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew T.↗

Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew↗

Unbounded Learning Environments as an Approach to Preserving Design Flexibility Demonstrated With Nasa Stem Enhancement in Earth Science (SEES) Students

The Artemis Lunar program is providing opportunity for young scientists and engineers to contribute towards leading edge design concepts regarding early on-surface work areas that are aligned with major national initiatives. Therefore, it is imperative in any discovery process that those young scientists and engineers be provided the bandwidth or operating in a ‘greenfield’ technology environment that encourages new ideas, and perhaps the discovery of ideas that would not be realized within typical structured engineering constraints. To facilitate this concept, the use of unbounded teaching methods was utilized to provide a low-constraint environment from which students can design and discover the requirements that are bounded by the natural environment of the lunar surface, and then build up design requirements un-hindered by budgetary and/or logistics realizations of the moment funding capabilities. Specifically, this design exercise provided the students to operate with unlimited budgets, and unlimited up-mass lifts to the lunar surface to develop a preliminary feasible process for establishing a working lunar research based upon the near-area permanently shadowed regions within the lunar surface. In concept, working near PSRs will be advantageous as they receive near eternal shielding from solar radiation and may potentially host numerous volatile substances such as water ice, methane, hydrogen sulfide and helium-3 that will be the target of scientific investigation and in-situ resource utilization ISRU. The advantage of an upstream working area is that the quality of return materials could potentially be exponential when including an upstream analysis prior to earth-return missions. Furthermore, it’s well known within the scientific and engineering community that working with the base materials in front of human eyes elucidates new features and observations that may not survive when stored and shipped to Earth. Finally, it is theorized that these methods and techniques developing on the lunar surface would be applicable to other planets or cometary surfaces.

Education↗

INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate and transparent to the public. Specifically, officials changed the quality assurance plan based on initial data reviews. Department officials also informed us that they are in the process of updating their quality assurance process to meet new OMB requirements. For example, recent guidance directed agencies to focus on certain data elements, such as award number and recipient name, during their quality assurance reviews. In addition, subsequent to our review, the Department added two more data elements and comparisons to its quarterly assurance process, including an analysis of costs/expenditures and a comparison of the recipient reported project status to the Department's data contained in its financial system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Budget Period 2 Summary Report Part 1: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, Statoil funded NREL to perform tasks in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This summarizes the document reports on the design and analysis work package, which built a FAST [Jonkman & Buhl, 2005] computer model of the Hywind 6-MW floating wind turbine system and uses this tool to evaluate the performance of a set of design load cases (DLCs). The FAST model was also used in Work Package 2: Wake Modeling .

17 WIND ENERGY↗

Budget Period 2 Summary Report Part 3: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data on wind characteristics. The study is restricted to those locations that meet the depth criteria for Hywind technology—defined as water depths between 100 m to 1,000 m—and only considered sites with net capacity factors that exceed 30%.

99 GENERAL AND MISCELLANEOUS↗

Industry case studies: Finance

This article, the third in a series on the U.S. Department of Energy and IDEA collaboration, focuses on financial strategies used by institutions to support district energy system modernization and decarbonization. It highlights how effective funding models, long-term cost analysis, and leadership support are critical to implementing large-scale infrastructure upgrades. The case studies show different approaches to financing. Ball State University demonstrates how life-cycle cost analysis and phased funding—supported by state funding, bonds, and grants—enabled a transition to geothermal energy. Penn State’s Hershey Medical Center emphasizes the importance of financial leadership, shifting from reactive budgeting to data-driven, proactive investment in infrastructure. The University of Washington highlights how comprehensive data collection and analytics can justify investments and even create self-sustaining funding mechanisms like green revolving funds. Overall, the article shows that combining strong financial planning, data-driven decision-making, and innovative funding approaches is essential for advancing sustainable district energy systems while managing high upfront costs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Broad Scope Analysis of the MOX Fuel Fabrication Facility and Disposition of Plutonium

The Plutonium Management and Disposition Agreement (PMDA), signed into effect in 2000, between the United States and Russia, was made in a post-Cold War effort to dispose of military-useable material, a combined 68 metric tons of weapon-grade plutonium. The United States has been pursuing a disposition path through conversion to MOX fuel for use in current commercial nuclear reactors. The Savannah River Site’s (SRS) MOX Fuel Fabrication Facility (MFFF, the MOX facility) began construction in 2007 with intent to uphold the United States’ half of the agreement. In the FY2017 budget, the Obama administration proposed a termination of the MFFF after lack of sufficient funding to the project, which caused paralyzing delays and drastically inflated costs for completion. Prolonged construction, piled costs, and divergent policies between shifting administrations have resulted in turmoil between the United States and Russia, culminating with the proposed abandonment of the MOX disposition path and being used as a justification by Russia to withdraw from the agreement until the United States is able to identify a clear plan, fulfilling the requirements set forth by the PMDA. The leading expedient to replace MOX fuel is the dilute and dispose method, which leaves uncertainty for the SRS MFFF and places reliance on New Mexico’s Waste Isolation Pilot Plant (WIPP) to legally accommodate the additional and unaccounted waste. If the current capacity of WIPP proves insufficient, construction of a new repository for transuranic waste would only incur additional costs and regulatory burdens, along with extreme schedule delays. Future proposed adaptations of the SRS MFFF include pit production, which would require complex and costly alterations to be operational at the current site. Restrictions from Congress, such as mandating the proposed solution to abandoning MFFF must equal half of the costs required for completing the facility, have fueled severely underestimated quotations of these alternatives. The increasing pressure from both Russia and South Carolina government officials to make a decision could result in the pursuit of another doomed project, leaving the United States with even further sunk costs and strained international relations. This paper will summarize the involved history of the MFFF, explicate the recourses to salvage the facility for pit production, and provide postulation on the dilute and dispose method.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benefits of Government Incentives for Reusable Launch Vehicle Development

Many exciting new opportunities in space, both government missions and business ventures, could be realized by a reduction in launch prices. Reusable launch vehicle (RLV) designs have the potential to lower launch costs dramatically from those of today's expendable and partially-expendable vehicles. Unfortunately, governments must budget to support existing launch capability, and so lack the resources necessary to completely fund development of new reusable systems. In addition, the new commercial space markets are too immature and uncertain to motivate the launch industry to undertake a project of this magnitude and risk. Low-cost launch vehicles will not be developed without a mature market to service; however, launch prices must be reduced in order for a commercial launch market to mature. This paper estimates and discusses the various benefits that may be reaped from government incentives for a commercial reusable launch vehicle program.

Shaw, Eric J.↗

A Practical Approach to Starting Fission Surface Power Development

The Prometheus Power and Propulsion Program has been reformulated to address NASA needs relative to lunar and Mars exploration. Emphasis has switched from the Jupiter Icy Moons Orbiter (JIMO) flight system development to more generalized technology development addressing Fission Surface Power (FSP) and Nuclear Thermal Propulsion (NTP). Current NASA budget priorities and the deferred mission need date for nuclear systems prohibit a fully funded reactor Flight Development Program. However, a modestly funded Advanced Technology Program can and should be conducted to reduce the risk and cost of future flight systems. A potential roadmap for FSP technology development leading to possible flight applications could include three elements: 1) Conceptual Design Studies, 2) Advanced Component Technology, and 3) Non-Nuclear System Testing. The Conceptual Design Studies would expand on recent NASA and DOE analyses while increasing the depth of study in areas of greatest uncertainty such as reactor integration and human-rated shielding. The Advanced Component Technology element would address the major technology risks through development and testing of reactor fuels, structural materials, primary loop components, shielding, power conversion, heat rejection, and power management and distribution (PMAD). The Non-Nuclear System Testing would provide a modular, technology testbed to investigate and resolve system integration issues.

Mason, Lee S.↗

Ares Project Technology Assessment: Approach and Tools

Technology assessments provide a status of the development maturity of specific technologies. Along with benefit analysis, the risks the project assumes can be quantified. Normally due to budget constraints, the competing technologies are prioritized and decisions are made which ones to fund. A detailed technology development plan is produced for the selected technologies to provide a roadmap to reach the desired maturity by the project s critical design review. Technology assessments can be conducted for both technology only tasks or for product development programs. This paper is primarily biased toward the product development programs. The paper discusses the Ares Project s approach to technology assessment. System benefit analysis, risk assessment, technology prioritization, and technology readiness assessment are addressed. A description of the technology readiness level tool being used is provided.

Hueter, Uwe↗

Development of Risk Uncertainty Factors from Historical NASA Projects

NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

Amer, Tahani R.↗