Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Awards”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

NASA’s Progress Toward Commercial Space Communications—SATCOM Demonstrations and Wideband Multilingual Terminal Development

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program is continuing to forge a path toward programmatic and operational transformation enabling commercialization of communications and navigation services to the greatest extent possible for near Earth users. National Space Policy is driving government agencies to incorporate commercial offerings and services to the maximum extent possible. As such, NASA has no plans to build or deploy Tracking and Data Relay Satellites, but will seek to fill NASA mission space-relay capability needs using commercial satellite communications (SATCOM) providers and services. The goal is to support an approach that is both flexible to commercial service constructs and provides continuity of support with current assets as long as required. Progress toward commercialization is advancing in two key areas: (1) awards have been made for demonstrations of SATCOM services, and (2) development of wideband and multilingual user terminals has advanced to the flight demonstration phase. The Communications Services Project (CSP) at Glenn Research Center (GRC), has awarded Funded Space Act Agreements (FSAA) to six industry vendors. Inmarsat Government Inc., Kuiper Government Solutions (KGS) LLC, SES Government Solutions, Space Exploration Technologies, Telesat U.S. Services LLC, and Viasat Incorporated received a combined $278.5 million to complete technology development and in-space demonstrations over the next several years. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. In the current market, industry vendors operate at a range of different frequencies and use variable, sometime proprietary, coding and modulations schemes. As NASA strives for a network comprised of services provided by multiple distinct suppliers, interoperability is a fitting solution to unify the network. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. This paper provides a discussion of the progress toward NASA’s commercial space communications goals and consideration of key challenges and next steps.

space communications↗

NASA's Initial Artemis Human Landing System

In April 2020, NASA announced the selection of three companies to begin the initial phase of development of human landing systems to take the first woman and the first person of color to the lunar surface through NASA’s Artemis lunar exploration program. The selected companies were a Blue Origin-led team with Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. Contracts were awarded shortly after, kicking off a ten-month base period during which NASA worked closely with each company to finalize functional and performance requirements, confirm lander development standards, and establish baseline designs, schedules, and management plans for contract execution and human spaceflight certification. At the end of the base period, in the Spring of 2021, NASA awarded a single follow-on Option A contract to SpaceX to continue their work on Human Landing System (HLS) Starship development. Currently NASA and SpaceX are working collaboratively on Option A which will ultimately culminate in one uncrewed and one crewed mission to the lunar surface under Artemis III. This paper will provide a look at the Option A phase of development for the Human Landing System Program, including publicly available information on SpaceX’s HLS Starship design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

NASA's Progress Toward Commercial Space Communications — SATCOM Demonstrations and Wideband Multilingual Terminal Development

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program is continuing to forge a path toward programmatic and operational transformation enabling commercialization of communications and navigation services to the greatest extent possible for near Earth users. U.S. National Space Policy is driving government agencies to incorporate commercial offerings and services to the maximum extent possible. As such, NASA has no plans to build or deploy additional Tracking and Data Relay Satellites (TDRS), but will seek to fill NASA mission space-relay capability needs using commercial satellite communications (SATCOM) providers and services. The goal is to support an approach that is both flexible to commercial service constructs and provides continuity of support with current assets as long as required. Progress toward commercial services is advancing in two key areas: (1) awards have been made for demonstrations of SATCOM services, and (2) development of wideband and multilingual user terminals has advanced to the flight demonstration phase. The Communications Services Project (CSP) at Glenn Research Center (GRC), has awarded Funded Space Act Agreements (FSAA) to six industry vendors. Inmarsat Government Inc., Kuiper Government Solutions (KGS) LLC, SES Government Solutions, Space Exploration Technologies, Telesat U.S. Services LLC, and Viasat Incorporated will receive a combined $278.5 million to complete technology development and in-space demonstrations over the next several years. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. In the current market, industry vendors operate at a range of different frequencies and use variable, sometimes proprietary, coding and modulations schemes. As NASA strives for a network comprised of services provided by multiple distinct suppliers, interoperability is a fitting solution to unify the network. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. This paper provides a discussion of the progress toward NASA’s commercial space communications goals and consideration of key challenges and next steps.

commercialization↗

Processes and Methods used for NASA Communications Services Project Conceptualization and Formulation

The U.S. National Aeronautics and Space Administration (NASA) is partnering with the commercial SATCOM industry to demonstrate the industry’s capabilities to provide services to NASA’s near-Earth missions. Leveraging commercial capabilities will become increasingly necessary for NASA, as its incumbent Government-owned-and-operated near-Earth satellite network, the Tracking and Data Relay Satellite System (TDRSS), will approach retirement towards the end of the current decade. NASA is actively taking the first steps to making the vision of using commercial SATCOM a reality. For more than two years, NASA’s Communication Services Project (CSP) has been evaluating the feasibility of employing commercial satellite communication (SATCOM) networks for near-Earth operations. This past April, CSP awarded US$278.5 million in Funded Space Act Agreements to select commercial SATCOM providers, so they may begin developing and demonstrating their specific near-Earth space communication services that may support future agency missions. Each company will match or exceed agency contributions during the five-year development and demonstration period, totaling more than $1.5 billion of cost-share investment. The companies will complete technology development and in-space demonstrations by 2025, after which NASA intends to seek multiple long-term contracts to acquire these kinds of services. The six companies (Inmarsat Government Inc., Kuiper Government Solutions (KGS), SES Government Solutions, Space Exploration Technologies (SpaceX), Telesat U.S. Services and Viasat Inc.) will shortly begin developing and demonstrating their capabilities to provide services, ranging from launch to standard on-orbit operations. The demonstrations will be across multiple spectrum regimes from L-Band to optical, and will utilize Geostationary Orbit (GEO), Medium-Earth Orbit (MEO) and Low-Earth Orbit (LEO) constellations. This paper discusses methodologies and processes used over the past two years to reach the point of entering into these partnerships. It also includes CSP’s goals and objectives going forward, following the award of six Funded Space Act Agreements to commercial SATCOM providers to develop and demonstrate these capabilities.

Communications Services Project↗

Processes and Methods used for Nasa Communications Services Project Conceptualization and Formulation

The U.S. National Aeronautics and Space Administration (NASA) is partnering with the commercial SATCOM industry to demonstrate the industry’s capabilities to provide services to NASA’s near-Earth missions. Leveraging commercial capabilities will become increasingly necessary for NASA, as its incumbent Government-owned-and-operated near-Earth satellite network, the Tracking and Data Relay Satellite System (TDRSS), will approach retirement towards the end of the current decade. NASA is actively taking the first steps to making the vision of using commercial SATCOM a reality. For more than two years, NASA’s Communication Services Project (CSP) has been evaluating the feasibility of employing commercial satellite communication (SATCOM) networks for near-Earth operations. This past April, CSP awarded US$278.5 million in Funded Space Act Agreements to select commercial SATCOM providers, so they may begin developing and demonstrating their specific near-Earth space communication services that may support future agency missions. Each company will match or exceed agency contributions during the five-year development and demonstration period, totaling more than $1.5 billion of cost-share investment. The companies will complete technology development and in-space demonstrations by 2025, after which NASA intends to seek multiple long-term contracts to acquire these kinds of services. The six companies (Inmarsat Government Inc., Kuiper Government Solutions (KGS), SES Government Solutions, Space Exploration Technologies (SpaceX), Telesat U.S. Services and Viasat Inc.) will shortly begin developing and demonstrating their capabilities to provide services, ranging from launch to standard on-orbit operations. The demonstrations will be across multiple spectrum regimes from L-Band to optical, and will utilize Geostationary Orbit (GEO), Medium-Earth Orbit (MEO) and Low-Earth Orbit (LEO) constellations. This paper discusses methodologies and processes used over the past two years to reach the point of entering into these partnerships. It also includes CSP’s goals and objectives going forward, following the award of six Funded Space Act Agreements to commercial SATCOM providers to develop and demonstrate these capabilities.

Communications Services Project↗

Overview of Ablative TPS Modeling at NASA Ames

Over the past decade, NASA has invested in efforts to build predictive thermal protection system (TPS) material models from the micro-scale to the macro-scale. To complement the mission design cycle process and reduce the need for extensive testing, NASA is developing modeling and simulation tools that enable characterizing material properties and response to hot plasma experienced during atmospheric entry. Traditional material response and ablation modeling tools, such as the heritage code FIAT, and its multidimensional siblings, TITAN and 3dFIAT, are being complemented with newly developed software such as Icarus and PATO. Both of these programs are three-dimensional, finite-volume solvers that use unstructured meshes and 21st century programming paradigms to allow for efficient parallel simulations. FIAT and Icarus are also used for TPS sizing purposes. Today, these traditional tools are being supplemented with computational materials models at the atomistic level. The scales of interest range from computational chemistry (Density Functional Theory [DFT]), to atomistic simulations (Molecular Dynamics [MD]), to the microscale with the Porous Microstructure Analysis (PuMA) software that was recently awarded the 2022 NASA Software of the Year award. Finally, thermo-structural modeling is also of interest to the TPS Materials branch and done using commercial tools such as MSC MARC, MENTAT, NASTRAN and PATRAN. The present talk will also link the use of these computational tools to current NASA missions and projects associated with challenging and complex vehicles entries/reentries.

materials modeling↗

NASA’s Human Landing System: A Sustaining Presence on the Moon

For more than a decade, efforts have been ongoing at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, to land humans and cargo on planetary bodies like the Moon and Mars and today this work continues under the Center’s Lander Programs (LP) office. In August of 2019, NASA stood up the Human Landing System (HLS) program to be responsible for spacecrafts that will land astronauts on the Moon under Artemis. Work is well underway with the historic Artemis III mission to land the first Americans on the lunar surface in more than 50 years through the Appendix H Option A [1] contract with SpaceX. In November, NASA awarded SpaceX an Option B modification to its existing HLS Appendix H contract, which will further develop its Starship HLS to meet NASA’s sustaining lander requirements for lunar missions beyond Artemis III. In September of 2022, NASA issued an HLS Sustaining Lunar Development solicitation under the NextSTEP-2 Appendix P Broad Agency Announcement [2] asking a second provider, in addition to SpaceX, to develop and demonstrate a lander that meets the program’s extended set of requirements for missions beyond Artemis III. Under the umbrella of Sustaining Lunar Development [3], these requirements will meet NASA’s needs for recurring, long-term access to the lunar surface. Proposals were received from industry late last year and NASA is planning to award an Appendix P contract in the summer of 2023. This paper will provide an update of the Lander Program office’s progress and will discuss how the program is bridging from the initial demonstration phase of development for the Human Landing System program to the Sustaining Lunar Development phase. The paper will include publicly available information on SpaceX’s Starship HLS design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

NASA's Heliophysics Flight Opportunities in Research and Technology Program

The Heliophysics Flight Opportunities in Research and Technology (H-FORT) program performs space and science and science-enabling investigations that use platforms including Small Satellites, CubeSats, Hosted Rideshare Payloads, and International Space Station (ISS) attached payloads. The H-FORT program encourages the development of technologies that will enable investigation of heliophysics science questions. The program also encourages the use of innovation, commercially available spaceflight hardware, rideshare launch opportunities, and high risk to drive the cost of achieving science to a fraction of what was previously possible. H-FORT missions also provide an opportunity for preparing future leaders of NASA spaceflight missions and most missions are supported by academic institutions and involve both graduate and under-graduate students. Since starting the program in 2013, 27 missions have been awarded, twelve missions and seventeen spacecraft have flown, three missions are waiting for launch, eleven missions are in development, and one mission was not completed as planned. This paper will provide an overview of the Heliophysics Flight Opportunities in Research and Technology (H-FORT) program and will provide a summary of the missions that have been awarded. This will include mission successes, challenges, failures, and lessons learned.

Thomas E. Johnson↗

From Blood Platelets Classification to Earth System Digital Twins: A Career in Computer Vision

IEEE SIgnal Processing Society (SPS) and Women in Signal Processing (WiSP) Webinar (https://signalprocessingsociety.org/blog/webinar-wisp-blood-platelets-classification-earth-system-digital-twins-career-computer-vision): Join us for an interactive session with Dr. Jacqueline Le Moigne, Manager of the NASA Science Mission Directorate Earth Science Technology Office’s Advanced Information Systems Technology Program. In this webinar, Dr. Le Moigne will share her journey through academia, the private sector, and her pivotal roles at NASA, emphasizing her work in signal processing, computer vision, and related technologies. The webinar will conclude with an interactive Q&A session, providing attendees the opportunity to engage directly with Dr. Le Moigne about her experiences and insights. Dr. Jacqueline Le Moigne manages NASA's Advanced Information Systems Technology Program, focusing on novel technologies that support Earth Science missions. She previously held roles at NASA Goddard, including Assistant Chief for Technology, and has worked on NASA's Space Technology Research Grants Program and Technology Roadmaps. Before NASA, she was a Research Scientist at the University of Maryland's Computer Vision Laboratory and also gained experience in the private sector. Jacqueline earned her Ph.D. in Computer Science from the University Pierre and Marie Curie in Paris. Her research interests include Image Registration, Computer Vision, Artificial Intelligence, Autonomous Systems, Distributed Spacecraft Missions (DSM), and Earth System Digital Twins (ESDT), as well as high-performance and onboard computing. She has authored over 180 publications, including books and patents, and has received multiple awards, including the NASA Exceptional Service Medal and the Goddard Information Science and Technology Award in 2012.

Computer Vision; Image Processing; Earth Science R↗

NASA Hybrid Thermally Efficient Core (HyTEC) Project Overview

The HyTEC Project goal is to mature compact core aircraft engine technologies as part of the NASA-led Sustainable Flight National Partnership (SFNP) that contributes to the United States Aviation Climate Action Plan goal for aviation net zero carbon emissions by 2050. Individual technologies were proposed and defined by industry partners, and then selected technology maturation activities are cost shared. Phase 1 contracts were awarded in 2021, and since then, the project has matured numerous technologies to TRL 4-5. Some of the Phase 1 efforts have been completed with successful results. An initial systems analysis study has been completed to estimate the impact of Phase 1 technologies against project performance metrics, with results indicating significant progress is being made toward meeting those metrics. HyTEC will culminate with an engine core demonstration that will integrate many of the Phase 1 technologies into a large-scale integrated ground demonstration that will achieve TRL 6 to enable industry to transition the technologies into the next single-aisle engine architecture. The goal of the demonstration is to fully meet the project performance metrics that define a compact engine core with substantial improvements in efficiency, durability, performance, hybridization, and sustainability over the baseline established in the year 2020. HyTEC will also incorporate hybrid electric technology into the engine core with the intention to bring the first electrified turbofan engines into production. The core demonstration has been awarded with a cost-share partnership and is planned to occur by the end of 2028.

Anthony L Nerone↗

Effects of prolonged exposure to pure oxygen on human performance

In view of the pure oxygen atmosphere selected for Project Mercury, and in anticipation of subsequent manned space missions of increasing duration, it was apparent that there was a need to obtain more extensive physiological data on the prolonged effects of pure oxygen environments on the crews. This study, conducted by Republic Aviation Corporation under Contract NASR-92, was initiated in collaboration with General Charles Roadman, USAF (MC), Director of Aerospace Medicine (formerly the Office of Life Sciences, NASA Headquarters), and his staff in an effort to provide a greater breadth of scientific data on the prolonged effects of such an environment on human performance. Although the 5 psi environment of Project Mercury was the focal point of the study, a broader appraisal of the effects of pure oxygen in the absence of nitrogen was attempted by including studies at 7.4 psi and 3.8 psi in addition to a control group at sea level atmospheric conditions. After award of the contract, the technical monitoring of the study was provided by the Manned Spacecraft Center, Houston, Texas, where Mr. Edward Michel served as monitor and coordinator for these and related studies subsequently established in laboratories of the U.S. Navy and U. S. Air Force.

PSYCHOLOGICAL EFFECT↗

Body-fixed, Three-Axis Reference System Study: Phase II Final Report

This Phase II Body-Fixed, Three-Axis Reference System Study Final Report is the result of a follow-on contract awarded by NASAIMSFC to TRW Systems in April 1966, under Contract No, NASS-20209. of the Phase I1 Study was to refine and supplement the strapdown inertial ’ reference assembly (SIRA), software, airborne computer, and alignment analyses performed during Phase I of the same contract. The purpose Specifically, the Phase I results in many areas were those which could be achieved using simplifying assumptions (linearization) and hand analyses. It was the purpose of the Phase I1 studies to investigate the validity of the Phase I results by means of more sophisticated computer simulations, in which no simplifying assumptions were made, for each of the areas analyzed. The Phase 11 analyses were directed, therefore, at confirming the analytical feasibility asserted by the Phase I results.

Source record↗

Space Shuttle orbiter and subsystems.

Considerable progress has been made in designing the Space Shuttle orbiter and defining its subsystems since the development contract was awarded by NASA to Rockwell International in August 1972. This paper describes the orbiter's current design characteristics and its major assemblies. The aerothermodynamic and other considerations involved in defining the configuration are discussed, and the orbiter flight characteristics are summarized. Arrangement of the crew cabin, crew provisions, accommodations for payloads, and descriptions of the major subsystems are presented, providing design highlights of interest to space mission planners and to the aerospace technical community.

Smith, E. P.↗

Modernization of the 60-inch telescope at the Mount Wilson Observatory

A contract for modernization of the Mount Wilson 60-inch telescope was awarded. Under this contract, the original hour angle and declination drives were replaced, digital coordinate readouts were added, a Cassegrain/ coude flip cage was built and installed, the telescope was completely rewired, a new control console was installed, and a coude spectrograph was completed. Extensive building modifications also were made to provide a working floor at mezzanine level for a computer and a coude observing room. These modifications and additions were completed by February 1970, and the telescope returned to regular and continuous use for stellar and planetary astronomy.

Source record↗

Space station interior design: Results of the NASA/AIA space station interior national design competition

The results of the NASA/AIA space station interior national design competition held during 1971 are presented in order to make available to those who work in the architectural, engineering, and interior design fields the results of this design activity in which the interiors of several space shuttle size modules were designed for optimal habitability. Each design entry also includes a final configuration of all modules into a complete space station. A brief history of the competition is presented with the competition guidelines and constraints. The first place award entry is presented in detail, and specific features from other selected designs are discussed. This is followed by a discussion of how some of these design features might be applied to terrestrial as well as space situations.

Haines, R. F.↗

The Commercial Application of Missile/Space Technology, Parts 1 and 2

This report is concerned with the transfer of technology from missile and space programs to non-missile/space applications in the United States. It presents the findings of a University of Denver Research Institute study sponsored by a National Aeronautics and Space Administration (NASA) grant awarded in November 1961. Initial stimulation for the unsolicited proposal leading to this study came from a 1960 Brookings Institution report to NASA, Proposed Studies on the Implications of Peaceful Space Activities for Human Affairs.

Welles, John G.↗