Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AsS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

188 records · Page 11

The 14 MeV Neutron Irradiation Facility in MARIA Reactor

The MARIA reactor with thermal neutron flux density up to 3x10{sup 14} cm{sup -2} s{sup -1} and a number of vertical channels is well suited to material testing by thermal neutron treatment. Beside of that some fast neutron irradiation facilities are operated in MARIA reactor as well. One of them is thermal to 14 MeV neutron converter launched in 2014. It is especially devoted to fusion devices material testing irradiation. The ITER and DEMO research thermonuclear facilities are to be run using the deuterium - tritium fusion reaction. Fast neutrons (of energy approximately 14 MeV) resulting from the reaction are essential to carry away the released thermonuclear energy and to breed tritium. However, constructional materials of which thermonuclear reactors are to be built must be specially selected to survive intense fluxes of fast neutrons. Strong sources of 14 MeV neutrons are needed if research on resistance of candidate materials to such fluxes is to be carried out effectively. Nuclear reactor-based converter capable to convert thermal neutrons into 14 MeV fast neutrons may be used to that purpose. The converter based on two stage nuclear reaction on lithium-6 and deuterium compounds leading to 14 MeV neutron production. The reaction chain is begun by thermal neutron capture by lithium-6 nucleus resulted in triton release. The neutron and triton transport calculations have been therefore carried-out to estimate the thermal to 14 MeV neutron conversion efficiency and optimize converter construction. The usable irradiation space of ca. 60 cm{sup 3} has been obtained. The released energy have been calculated. Heat transport has been asses to ensure proper device cooling. A set of thermocouples has been installed in converter to monitor its temperature distribution on-line. Influence of converter on reactor operation has been studied. Safety analyses of steady states and transients have been done. Performed calculations and analyses allow designing the converter and formulate its operation limits and conditions. During first tested operation of the converter the 14 MeV neutron flux density was estimated to 10{sup 9} cm{sup -2} s{sup -1}, whereas fast fission neutrons inside converter achieved 10{sup 12} cm{sup -2} s{sup -1}, and thermal neutrons were reduced down to 109 cm-2 s-1. Taking into account the feasibility of almost incessant converter operation for a number of months, its arisen as one of the most powerful (in terms of fluence), currently available 14 MeV neutron source. Such a converter currently under operation in the MARIA reactor core will be presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Legacy Waste Containers for Low and Intermediate Level Radioactive Waste in Germany - Actual Situation and Challenges - 17070

Low and intermediate level radioactive waste has been produced in Germany for several decades. While a part of the waste had been deposited in the Morleben repository and the Asse mine which have been operated for just a limited period of time, the major amount is conditioned and packaged in temporarily stored waste containers. Those containers are designated for final disposal in the KONRAD repository being currently under construction and expected to start operation in 2022. As a consequence, an assessment of the waste container documentation and safety is strongly needed to receive an approval for the Konrad repository. This requalification is challenging because those old containers have to meet the same safety requirements as new containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of the Safety Analyses of the Konrad Repository - 20530

The Bundesgesellschaft fuer Endlagerung (BGE) is the license holder of all geological repository sites in Germany since 2017. Besides the construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository, BGE is responsible to carry out the operative tasks of selecting a site for a high-level waste (HLW) repository. The Konrad repository is Germany's first repository for radioactive waste with negligible heat generation, which was fully licensed under atomic law within the scope of a plan approval procedure from the original application in 1982 until the license was granted in 2002 and finally confirmed by the Federal Administrative Court in 2007. The emplacement of LILW was licensed up to a volume of 303,000 m{sup 3} with a total β/γ-activity of 5 x 10{sup 18} Bq and a total α-activity of 1.5 x 10{sup 17} Bq. Currently, the former iron ore mine Konrad is being converted to a repository and is expected to come into operation in 2027. But what if there is no safety case in place nor a regulatory framework tailored for a change of documents in order to ensure the safety according to the state-of-the-art of science and technology during the evolution of a long-term project such as a geological repository? In this presentation, a review procedure of the safety analyses, that have been the basis of the plan approval decision for the Konrad repository at that time, will be described. Furthermore, the first results of this graduated review procedure for updating the safety analyses will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beam-Based Alignment, Tuning and Beam Dynamics Studies for the ATF2 Extraction Line and Final Focus System

Using a new extraction line currently under construction, the ATF2 experiment plans to test the novel compact final focus optics design with local chromaticity correction intended for use in future linear colliders. With a 1.3 GeV design beam of 30nm normalized vertical emittance extracted from the ATF damping ring, the primary goal is to achieve a vertical spot-size at the IP waist of 37nm. We discuss our planned strategy for tuning the ATF2 beam to meet the primary goal. Simulation studies have been performed to asses the effectiveness of the strategy, including 'static' (installation) errors and dynamical effects (ground-motion, mechanical vibration, ring extraction jitter etc.). We have simulated all steps in the tuning procedure, from initial orbit establishment to final IP spot-size tuning. Through a Monte Carlo study of 100's of simulation seeds we find we can achieve a spot-size within {approx}10% of the design optics value in at least 75% of cases. We also ran a simulation to study the long-term performance with the use of beam-based feedbacks.

43 PARTICLE ACCELERATORS↗

EE&RE; Session: CIGS (Presentation)

This project supports the Solar America Initiative by carrying out work on target topics identified for Photovoltaic Systems: (1) Improving cell and module efficiency of thin film Cu(In,Ga)Se2 materials; (2) Implementing the Science and Technology Facility (S&TF) and the Process Development and Integration Laboratory (PDIL) to facilitate laboratory/industry interaction in developing PV manufacturing technologies; (3) Addressing industrial issues in materials and manufacturing processes with the objective to lower the cost of PV power; (4) Providing technology transfer efforts to accelerate transition of thin film PV technology to market and deployment; (5) Assisting R&D efforts to asses and improve reliability and stability of thin film PV products; and (6) Assist the SAI TPPs in technical matters related to CIGS PV technology.

14 SOLAR ENERGY↗

Role of Surgical Versus Clinical Staging in Chemoradiated FIGO Stage IIB-IVA Cervical Cancer Patients—Acute Toxicity and Treatment Quality of the Uterus-11 Multicenter Phase III Intergroup Trial of the German Radiation Oncology Group and the Gynecologic Cancer Group

Purpose: The Uterus-11 trial was designed to evaluate the role of surgical staging in patients with cervical cancer before primary chemoradiation therapy (CRT). The present report provides the toxicity data stratified by the treatment arm and technique. Methods and Materials: A total of 255 patients with carcinoma of the uterine cervix (International Federation of Gynecology and Obstetrics stage IIB-IVA) were randomized to either surgical staging followed by CRT (arm A) or clinical staging followed by CRT (arm B). Patients with para-aortic metastases underwent extended field radiation therapy (RT). Brachytherapy was mandatory. The present report presents the acute therapy-related toxicities stratified by treatment arm and radiation technique. Results: A total of 240 patients were eligible (n=121 in arm A; n=119 in arm B). Of the 240 patients, 236 (98.3%) underwent external beam RT with a median total dose of 50.4 Gy. The mean treatment duration was 53 days. Of the patients, 60% underwent intensity modulated RT (IMRT). A total of 234 patients (97.5%) underwent chemotherapy, and 231 (96.3%) underwent brachytherapy, with a median single dose of 6 Gy covering the tumor to a median nominal total dose of 28 Gy. Treatment was well tolerated, with 0% grade ≥3 genitourinary and gastrointestinal toxicity, 6% grade 3 nausea, 3% grade 3 vomiting, and <2% grade 3 diarrhea. More patients after surgical staging experienced grade 2 anemia (54.3% in arm A vs 45.3% in arm B; P=.074) and grade 2 leukocytopenia (41.4% vs 31.6%; P=.56). Of the patients who received IMRT versus a 3-dimensional technique, 65.3% versus 33.7% presented with grade 2 anemia. Grade 3 gastrointestinal and grade 2 bladder toxicity were significantly reduced with the use of IMRT. Conclusions: The incidence and severity of acute therapy-related toxicity compared favorably with those from other randomized trials. Excellent adherence to treatment and treatment quality was achieved compared with patterns of care analyses. Surgical staging led to a doubled number of patients treated with extended field RT. The question of whether surgical staging is beneficial in the context of primary CRT requires further study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Modeling Coupled THM Processes and Brine Migration in Salt at High Temperatures

In this report, we present FY2015 progress by Lawrence Berkeley National Laboratory (LBNL) related to modeling of coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This is a combined milestone report related to milestone Salt R&D Milestone “Modeling Coupled THM Processes and Brine Migration in Salt at High Temperatures” (M3FT-15LB0818012) and the Salt Field Testing Milestone (M3FT-15LB0819022) to support the overall objectives of the salt field test planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗