Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing tank”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, J. J.↗

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, Jessica J.↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A thermal active restrained shrinkage ring test to study the early age concrete behaviour of massive structures

In massive concrete structures, cracking may occur during hardening, especially if autogenous and thermal strains are restrained. The concrete permeability due to this cracking may rise significantly and thus increase leakage (in tank, nuclear containment...) and reduce the durability. The restrained shrinkage ring test is used to study the early age concrete behaviour (delayed strains evolution and cracking). This test shows, at 20 {sup o}C and without drying, for a concrete mix which is representative of a French nuclear power plant containment vessel (w/c ratio equal to 0.57), that the amplitude of autogenous shrinkage (about 40 {mu}m/m for the studied concrete mix) is not high enough to cause cracking. Indeed, in this configuration, thermal shrinkage is not significant, whereas this is a major concern for massive structures. Therefore, an active test has been developed to study cracking due to restrained thermal shrinkage. This test is an evolution of the classical restrained shrinkage ring test. It allows to take into account both autogenous and thermal shrinkages. Its principle is to create the thermal strain effects by increasing the temperature of the brass ring (by a fluid circulation) in order to expand it. With this test, the early age cracking due to restrained shrinkage, the influence of reinforcement and construction joints have been experimentally studied. It shows that, as expected, reinforcement leads to an increase of the number of cracks but a decrease of crack widths. Moreover, cracking occurs preferentially at the construction joint.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Mixing Study for the Modification of H-Canyon Tank 31 and 32 Recirculation Lines Via M-Star®

As a part of the Accelerated Basin De-Inventory (ABD) program Tanks 31 or 32 will be re-purposed to support increasing the number of annual Material Test Reactor (MTR) and High Flux Isotope Reactor (HFIR) dissolutions. The proposed plan will allow Tanks 31 or 32 to be used as the dissolver cold chemical solution makeup tank and storage tank. The dissolver cold chemicals are 50% nitric acid, process water, mercuric nitrate, and gadolinium nitrate. Tanks 31 and 32 are 9 ft. (outer diameter) x 36 ft, horizontal, and can hold approximately 56,000 liters (15,000 gallons) each. One full volume of Tanks 31 or 32 can support 4 HFIR 6.4D equivalent batches. Both tanks are equipped with liquid level instrumentation. Tank 31 is equipped with 1 pump used for transfer and recirculation while Tank 32 is equipped with two pumps, one for transfer and the other for recirculation. Each of the pumps is equipped with sample taps. The tanks do not have specific gravity instrumentation, an agitator, or a sampler. Piping modifications will also be performed to supply the tank with cold chemicals. The current dissolver chemical composition is 5.0 -8.5M HNO3 and ~0.2 g Gd/L. The recirculating pump connected to Tank 31 is rated for a flowrate 175 gpm while the pump connected to Tank 32 is rated for a flowrate 50 gpm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of experimental investigations to determine external tank protuberance loads using a 0.03-scale model of the Space Shuttle launch configuration (model 47-OTS) in the NASA/ARC unitary plan wind tunnel, volume 1

Data were obtained on a 3-percent model of the Space Shuttle launch vehicle in the NASA/Ames Research Center 11x11-foot and 9x7-foot Unitary Plan Wind Tunnels. This test series has been identified as IA190A/B and was conducted from 7 Feb. 1980 to 19 Feb. 1980 (IA190A) and from 17 March 1980 to 19 March 1980 and from 8 May 1980 to 30 May 1980 (IA190B). The primary test objective was to obtain structural loads on the following external tank protuberances: (1) LO2 feedline, (2) GO2 pressure line, (3) LO2 antigeyser line, (4) GH2 pressure line, (5) LH2 tank cable tray, (6) LO2 tank cable tray, (7) Bipod, (8) ET/SRB cable tray, and (9) Crossbeam/Orbiter cable tray. To fulfill these objectives the following steps were taken: (1) Eight 3-component balances were used to measure forces on various sections of 1 thru 6 above. (2) 315 pressure orifices were distributed over all 9 above items. The LO2 feedline was instrumented with 96 pressure taps and was rotated to four positions to yield 384 pressure measurements. The LO2 antigeyser line was instrumented with 64 pressure taps and was rotated to two positions to yield 128 pressure measurements. (3) Three Chrysler miniature flow direction probes were mounted on a traversing mechanism on the tank upper surface centerline to obtain flow field data between the forward and aft attach structures. (4) Schlieren photographs and ultraviolet flow photographs were taken at all test conditions. Data from each of the four test phases are presented.

Houlihan, S. R.↗

Results of Experimental Investigations to Determine External Tank Protuberance Loads Using a 0.03-Scale Model of the Space Shuttle Launch Configuration (Model 47-OTS) in the NASA/ARC Unitary Plan Wind Tunnel, Volume 2

Data were obtained on a 3-percent model of the Space Shuttle launch vehicle in the NASA/Ames Research Center 11x11-foot and 9x7-foot Unitary Plan Wind Tunnels. This test series has been identified as IA19OA/B and was conducted from 7 Feb. 1980 to 19 Feb. 1980 (IA19OA) and from 17 March 1980 to 19 March 1980 and from 8 May 1980 to 30 May 1980 (IA19OB). The primary test objective was to obtain structural loads on the following external tank protuberances: (1) LO2 feedline; (2) GO2 pressure line; (3) LO2 antigeyser line; (4) GH2 pressure line; (5) LH2 tank cable tray; (6) LO2 tank cable tray; (7) Bipod; (8) ET/SRB cable tray; and (9) Crossbeam/Orbiter cable tray. To fulfill these objectives the following steps were taken: Eight 3-component balances were used to measure forces on various sections of 1 thru 6 above; 315 pressure orifices were distributed over all 9 above items. The LO2 feedline was instrumented with 96 pressure taps and was rotated to four positions to yield 384 pressure measurements. The LO2 antigeyser line was instrumented with 64 pressure taps and was rotated to two positions to yield 128 pressure measurements; Three Chrysler miniature flow direction probes were mounted on a traversing mechanism on the tank upper surface centerline to obtain flow field data between the forward and aft attach structures; and Schlieren photographs and ultraviolet flow photographs were taken at all test conditions. Data from each of the four test phases are presented.

Houlihan, S. R.↗

Cryogenic glass-filament-wound tank evaluation

High-pressure glass-filament-wound fluid storage vessels with thin aluminum liners were designed, fabricated, and tested at ambient and cryogenic temperatures which demonstrated the feasibility of producing such vessels as well as high performance and light weight. Significant developments and advancements were made in solving problems associated with the thin metal liners in the tanks, including liner bonding to the overwrap and high strain magnification at the vessel polar bosses. The vessels had very high burst strengths, and failed in cyclic fatigue tests by local liner fracture and leakage without structural failure of the composite tank wall. The weight of the tanks was only 40 to 55% of comparable 2219-T87 aluminum and Inconel 718 tanks.

Morris, E. E.↗

Physics-guided neural networks with engineering domain knowledge for hybrid process modeling

As neural networks are more frequently used to solve problems in science and engineering, the methods used to incorporate scientific knowledge into these networks are becoming increasingly complex. Here, this work breaks down these complicated techniques into a set of basic strategies which can easily be applied to diverse situations. Several novel neural networks are built using the categories laid out in this work. These networks are tested on simulated data from a continuous stirred tank reactor (CSTR) model to evaluate the advantages provided by each network. The three points demonstrated in this work are: (1) architectural hybrid models can speed up convergence and reduce the amount of data necessary to train a model; (2) adding a physics-guided loss function can improve model generalization and make models more physically consistent; (3) using physics-guided initialization and transfer learning improves accuracy and speeds up convergence, but can harm generalizability if used incorrectly.

42 ENGINEERING↗

Direct Drive Wave Energy Buoy

This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) and lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).

16 TIDAL AND WAVE POWER↗

Validation of HyRAM+ Version 5.1 Physics Models

The Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) software has seen various improvements and additional physics capabilities since validation against experimental data was last published for HyRAM v3.1. Notably, HyRAM+ now includes four models allowing for the calculation of overpressure resulting from vapor cloud explosions from unconfined jet releases. As with the previous HyRAM validation report, validation data was gathered from available published literature and tested against HyRAM+ capabilities. The validation comparisons include tank blowdown, unignited dispersion jet plume, ignited jet flame, and enclosed accumulation and overpressure. The unconfined overpressure calculations in HyRAM+ v5.1.1 generally show good agreement with many of the experimental data sets for all four unconfined overpressure models, though HyRAM+ overpredicts the experimental data for small and cryogenic hydrogen releases. The comparisons for the other HyRAM+ physics models are largely unchanged from the previously published validation report.

08 HYDROGEN↗

Cold Spray Field Deployment Evaluation for Double-Shell Tank 241-AN-105

This report highlights the documentation that supported Cold Spray field deployment in double-shell tank (DST) 241-AN-105 (AN-105) in July of 2025. This work was a collaborative effort between VRC Metal Systems (VRC), Robotic Technologies of Tennessee (RTT), the Hanford Tank Waste Operation and Closure (H2C) Chief Technology Office, H2C Tank Farm Projects Engineering, H2C Tank and Pipeline Integrity (TAPI) and H2C Ultrasonic Testing (UT) Operations & Support. Since 2019, the Chief Technology Office has been developing Cold Spray technology for refurbishing Hanford’s DSTs (RPP-RPT-65015). This technology is particularly relevant for addressing localized corrosion within the annulus of the DSTs by propelling metal powder particles at supersonic speeds to targeted areas. This process results in high-quality coatings characterized by high bond strength and low porosity result.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Feed Solids Content on LAW Melt Processing

The primary objective of this work was to collect data to support processing of Hanford LAW over a range of feed solids contents, extending both higher and lower than the present WTP baseline. Processing LAW at higher solids content has the potential to increase throughput and reduce the time required to process the inventory of LAW waste. Processing some LAW streams at lower than the WTP baseline solids contents may be a required condition for the direct feed approach due to the more limited pretreatment functionality and evaporation capability. A high waste loading glass formulation developed in earlier work for an LAW composition specified by ORP was used for this work. The glass composition selected for testing is ORPLA20, which is based on LAW tank AN-105; the glass has a waste loading of 31.4 wt% and an Na2O content of 24.0 wt%.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Riser Difference Evaluation from Ultrasonic Wall Thickness Inspection of Thirteen Double-Shell Tanks

PNNL has performed an analysis of ultrasonic thickness measurements taken on Hanford's double-shell tanks (DSTs) approximately eight years apart. The analysis was performed to determine whether significant differences exist between ultrasonic thickness measurements made in two opposite risers in Hanford DSTs that have been examined twice.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental performance analysis of a dual source heat pump integrated with thermal energy storage

To mitigate disturbances to the electric grid resulting from the growing penetration of intermittent and decentralized renewable generation, a dual-source (air source and ground source) heat pump (DSHP) integrated with thermal energy storage (TES) was developed. The DSHP can use either ambient air or the shallow subsurface of the ground to provide space heating or space cooling to the building as the conventional heat pump and produce hot/cold water for charging TES. Using dual sources (air and ground) can reduce the required size of the expensive ground heat exchangers while retaining high energy efficiency. During the off-peak period, the DSHP cools/heats the TES with low-cost electricity or overproduced renewable power. The stored cooling/heating energy in the TES is released during peak hours of the electric grid to meet the thermal demands of the building without consuming electricity to run the DSHP. A 2-ton (7 kW) prototype DSHP was developed and integrated with a 50-gallon (189 L) TES tank filled with a phase change material. Field tests were conducted to characterize the performance of the integrated system operating in various operation modes.

Wang, Lingshi↗

Mass quantity gauging by RF mode analysis

Work done to date is reported concerning Radio Frequency Mass Quantity Gauging. Experimental apparatus has been designed and tested which measures the resonant frequencies of a tank in the time domain. These frequencies correspond to the total mass of fluid within the tank. Experimental results are discussed for nitrogen and hydrogen in normal gravity both in the supercritical state and also in the two phase (liquid-gas) region. Theoretical discussions for more general cases are given.

Collier, R. S.↗

A multiple thruster array for 30-cm thrusters

The 3.0-m diameter chamber of the 7.6-m diameter by 21.4-m long vacuum tank at NASA LeRC was modified to permit testing of an array of up to six 30-cm thrusters with a variety of laboratory and thermal vacuum bread-board power systems. A primary objective of the Multiple Thruster Array (MTA) program is to assess the impact of multiple thruster operation on individual thruster and power processor requirements. The areas of thruster startup, steady-state operation, throttling, high voltage recycle, thrust vectoring, and shutdown are of special concern. The results of initial tests are reported.

Rawlin, V. K.↗

Refine your search to explore more results.