Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Overview of high-temperature materials for high-energy space power systems

The current state of technology and some of the more pressing research needs and challenges associated with the possible use of high temperature materials in future high energy space power systems are discussed. Particularly, emphasis is on the need to improve and quantify the fundamental understanding of the effects of the following: (1) fast neutron radiation on the properties and behavior of nuclear reactor fuels and claddings; and (2) long term, high temperature, space (vacuum) exposure on the properties of refractory metals considered for use as structural materials in various power conversion systems.

Saunders, N. T.↗

An Accelerated Development, Reduced Cost Approach to Lunar/Mars Exploration Using a Modular NTR-Based Space Transportation System

The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.

Borowski, S.↗

Enabling Science and Deep Space Exploration through Space Launch System (LSL) Secondary Payload Opportunities

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). By reaching this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. NASA is making investments to expand science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1), currently planned for launch no earlier than July 2018, will be the first mission to carry such payloads on the SLS. The EM-1 launch will include thirteen 6U Cubesat small satellites that will be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Advanced space information systems

Onboard computers for pre-transmission data processing, automation of data acquisition centers, and real time data relay to control centers for advanced space information systems

REAL TIME↗

Megawatt Class Nuclear Space Power Systems (MCNSPS) conceptual design and evaluation report. Volume 3, technologies 2: Power conversion

The major power conversion concepts considered for the Megawatt Class Nuclear Space Power System (MCNSPS) are discussed. These concepts include: (1) Rankine alkali-metal-vapor turbine alternators; (2) in-core thermionic conversion; (3) Brayton gas turbine alternators; and (4) free piston Stirling engine linear alternators. Considerations important to the coupling of these four conversion alternatives to an appropriate nuclear reactor heat source are examined along with the comparative performance characteristics of the combined systems meeting MCNSPS requirements.

Wetch, J. R.↗

Development of a Human Systems Integration Plan

NASA defines Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The HSI Plan defines how HSI activities will be implemented across the lifecycle of the mission, as required by NPR 7123.1C, NASA Systems Engineering Processes and Requirements, and NPR 8705.2C Human-Rating Requirements for Space Systems. The goal of this presentation is to share with government and industry how an HSI Plan can be implemented. The presentation will cover HSI implementation for flight systems, vehicle processing, and interfaces. These are divided into six NASA HSI Domains: human factors engineering, operations resources, safety, training, maintainability and supportability, habitability and environment. HSI activities go across the mission’s lifecycle from pre-formulation and acquisition through design, development, operations, maintenance, and decommissioning. The HSI Plan includes a description of the HSI activities and products that are essential for human rating, operability, maintainability, supportability, and affordability of the mission systems. It also describes the role of the HSI Team required as part of the Human Rating process. The HSI Plan utilizes the operational expertise within NASA to ensure designs and testing are successful, leading to acceptable human spaceflight vehicles.

Jackelynne Silva-Martinez↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

NASA's advanced space transportation system launch vehicles

Some insight is provided into the advanced transportation planning and systems that will evolve to support long term mission requirements. The general requirements include: launch and lift capacity to low earth orbit (LEO); space based transfer systems for orbital operations between LEO and geosynchronous equatorial orbit (GEO), the Moon, and Mars; and Transfer vehicle systems for long duration deep space probes. These mission requirements are incorporated in the NASA Civil Needs Data Base. To accomplish these mission goals, adequate lift capacity to LEO must be available: to support science and application missions; to provide for construction of the Space Station Freedom; and to support resupply of personnel and supplies for its operations. Growth in lift capacity must be time phased to support an expanding mission model that includes Freedom Station, the Mission to Planet Earth, and an expanded robotic planetary program. The near term increase in cargo lift capacity associated with development of the Shuttle-C is addressed. The joint DOD/NASA Advanced Launch System studies are focused on a longer term new cargo capability that will significantly reduce costs of placing payloads in space.

Branscome, Darrell R.↗

The 1991 Marshall Space Flight Center research and technology

A compilation of 194 articles addressing research and technology activities at the Marshall Space Flight Center (MSFC) is given. Activities are divided into three major areas: advanced studies addressing transportation systems, space systems, and space science activities conducted primarily in the Program Development Directorate; research tasks carried out in the Space Science Laboratory; and technology programs hosted by a wide array of organizations at the Center. The theme for this year's report is 'Building for the Future'.

Source record↗

Constellation Space Suit System Development Status

The Constellation Program has initiated the first new flight suit development project since the Extravehicular Mobility Unit (EMU) was developed for the Space Shuttle Program in the 1970s. The Constellation suit system represents a significant challenge to designers in that the system is required to address all space suit functions needed through all missions and mission phases. This is in marked contrast to the EMU, which was designed specifically for micro-gravity space walks. The Constellation suit system must serve in all of the following scenarios: launch, entry and abort crew survival; micro-gravity extravehicular activity (EVA); and lunar (1/6th-gravity) surface EVA. This paper discusses technical efforts performed from May 2006 through February 2007 for the Constellation space suit system pressure garment.

Ross, Amy↗

Space Launch System Launch Windows and Day of Launch Processes

Lunar missions benefit from varying the launch azimuth as a function of launch time to allow longer launch windows with minimum performance impacts. This variable azimuth approach allows the vehicle to track the Moon’s apparent motion due to Earth’s rotation. The Space Launch System (SLS) Block 1 vehicle design requires the mission to launch into an elliptical parking orbit to provide sufficient energy to insert Orion into a Trans-Lunar Injection (TLI) orbit. The primary benefit of varying the launch azimuth, and as a result the achieved orbit inclination, allows the SLS Interim Cryogenic Propulsion Stage (ICPS) to perform its TLI burn closer to perigee and take advantage of performing a burn in a location where the burn will optimally raise apogee.

launch window↗

Preparing a health care delivery system for Space Station

NASA's Space Station is viewed as the beginning of man's permanent presence in space. This paper presents the guidelines being developed by NASA's medical community in preparing a quality, permanent health care delivery system for Space Station. The guidelines will be driven by unique Space Station requirements such as mission duration, crew size, orbit altitude and inclination, EVA frequency and rescue capability. The approach will emphasize developing a health care system that is modular and flexible. It will also incorporate NASA's requirements for growth capability, commonality, maintainability, and advanced technology development. Goals include preventing unnecessary rescue attempts, as well as maintaining the health and safety of the crew. Proper planning will determine the levels of prevention, diagnosis, and treatment necessary to achieve these goals.

Logan, J. S.↗

Design of a three-phase, 15-kilovolt-ampere static inverter for motor-starting a Brayton space power system

The design of a three-phase, 400-Hz, 15-kVA static inverter for motor-starting the 2- to 15-kWe Brayton electrical space power system is described. The inverter operates from a nominal 56-V dc source to provide a 28-V, rms, quasi-square-wave output. The inverter is capable of supplying a 200-A peak current. Integrated circuitry is used to generate the three-phase, 400-Hz reference signals. Performance data for a drive stage that improves switching speed and provides efficient operation over a range of output current and drive supply voltage are presented. A transformerless, transistor output stage is used.

Frye, R. J.↗

Combustion experimentation aboard the space transportation system

A description is presented of the preliminary concept, specifications, and general requirements of a proposed Combustion Facility (CF) for the Spacelab payload of the Space Transportation System. The CF will permit an experimenter to use suitably contained liquid, gas, or solid fuels. He can specify and establish the composition and pressure level of the atmosphere in which the combustion will take place. It will be possible to characterize the experiment with common types of instrumentation as well as selected specialized equipment, to study the combustion process visually by direct observation and by motion picture coverage, and to obtain time histories of pertinent experimental parameters. During an experimental period, the CF will depend on Spacelab resources for power, heat rejection, and vacuum. Activating the CF and preparing it for the various experiments, performing the experiments, and shutting down the facility will be largely manual operations performed by flight personnel.

Dewitt, R. L.↗

Convective Heat Transfer in the Reusable Solid Rocket Motor of the Space Transportation System

This simulation involved a two-dimensional axisymmetric model of a full motor initial grain of the Reusable Solid Rocket Motor (RSRM) of the Space Transportation System (STS). It was conducted with CFD (computational fluid dynamics) commercial code FLUENT. This analysis was performed to: a) maintain continuity with most related previous analyses, b) serve as a non-vectored baseline for any three-dimensional vectored nozzles, c) provide a relatively simple application and checkout for various CFD solution schemes, grid sensitivity studies, turbulence modeling and heat transfer, and d) calculate nozzle convective heat transfer coefficients. The accuracy of the present results and the selection of the numerical schemes and turbulence models were based on matching the rocket ballistic predictions of mass flow rate, head end pressure, vacuum thrust and specific impulse, and measured chamber pressure drop. Matching these ballistic predictions was found to be good. This study was limited to convective heat transfer and the results compared favorably with existing theory. On the other hand, qualitative comparison with backed-out data of the ratio of the convective heat transfer coefficient to the specific heat at constant pressure was made in a relative manner. This backed-out data was devised to match nozzle erosion that was a result of heat transfer (convective, radiative and conductive), chemical (transpirating), and mechanical (shear and particle impingement forces) effects combined.

Ahmad, Rashid A.↗

Refine your search to explore more results.