Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Distributed Generation Cost-Benefit and Ratemaking Considerations for Idaho

This memo was completed through the Grid Modernization Laboratory Consortium (GMLC), a strategic partnership between the U.S. Department of Energy (DOE) and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The GMLC was established as part of the DOE Grid Modernization Initiative to accelerate the development of technology, modeling analysis, tools, and frameworks to help enable grid modernization. Special thanks to DOE project leads, Larry Mansueti and Elaine Ulrich, and the laboratory project lead for this effort, Peter Cappers from Lawrence Berkeley National Laboratory (LBNL). The Idaho Public Utility Commission (IPUC) Staff requested this technical assistance to improve their understanding of the emerging, complex, and consequential issues around distributed energy resource (DER) rate design to help the staff achieve its goal of making a fair, just, and reasonable rate design recommendation with respect to Order 34147 under Case No. IPC-E-17-13. 2 PNNL-28285 In Case No. IPC-E-17-13, Idaho Power requested authorization from the IPUC to establish new rate schedules for residential and small general service customers with on-site generation. The IPUC’s Order No. 34046 of May 9, 2018 authorized Idaho Power to (IPUC 2018a): Close Schedule 84 and create Schedule 6 for residential on-site generators and Schedule 8 for small general service on-site generators; Acknowledge smart inverter technology; Make proposed revisions to interconnection Schedule 72; Open an Idaho Power-specific docket to “to comprehensively study the costs and benefits of on-site generation on Idaho Power’s system, as well as proper rates and rate design, transitional rates, and related issues of compensation for net excess energy provided as a resource” to Idaho Power; File a study with the IPUC “exploring fixed-cost recovery in basic charges and other rate design options prior to its next general rate case.”

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Space shuttle maintenance program planning document

A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

Brown, D. V.↗

Characterization, performance, and prediction of a lead-acid battery under simulated electric vehicle driving requirements

A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule.

Ewashinka, J. G.↗

Application of precomputed control laws in a reconfigurable aircraft flight control system

A self-repairing flight control system concept in which the control law is reconfigured after actuator and/or control surface damage to preserve stability and pilot command tracking is described. A key feature of the controller is reconfigurable multivariable feedback. The feedback gains are designed off-line and scheduled as a function of the aircraft control impairment status so that reconfiguration is performed simply by updating the gain schedule after detection of an impairment. A novel aspect of the gain schedule design procedure is that the schedule is calculated using a linear quadratic optimization-based simultaneous stabilization algorithm in which the scheduled gain is constrained to stabilize a collection of plant models representing the aircraft in various control failure modes. A description and numerical evaluation of a controller design for a model of a statically unstable high-performance aircraft are given.

Moerder, Daniel D.↗

System control of an autonomous planetary mobile spacecraft

The goal is to suggest the scheduling and control functions necessary for accomplishing mission objectives of a fairly autonomous interplanetary mobile spacecraft, while maximizing reliability. Goals are to provide an extensible, reliable system conservative in its use of on-board resources, while getting full value from subsystem autonomy, and avoiding the lure of ground micromanagement. A functional layout consisting of four basic elements is proposed: GROUND and SYSTEM EXECUTIVE system functions and RESOURCE CONTROL and ACTIVITY MANAGER subsystem functions. The system executive includes six subfunctions: SYSTEM MANAGER, SYSTEM FAULT PROTECTION, PLANNER, SCHEDULE ADAPTER, EVENT MONITOR and RESOURCE MONITOR. The full configuration is needed for autonomous operation on Moon or Mars, whereas a reduced version without the planning, schedule adaption and event monitoring functions could be appropriate for lower-autonomy use on the Moon. An implementation concept is suggested which is conservative in use of system resources and consists of modules combined with a network communications fabric. A language concept termed a scheduling calculus for rapidly performing essential on-board schedule adaption functions is introduced.

Dias, William C.↗

The Traffic Management Advisor

The traffic management advisor (TMA) is comprised of algorithms, a graphical interface, and interactive tools for controlling the flow of air traffic into the terminal area. The primary algorithm incorporated in it is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 n.m. from touchdown. A unique feature of the TMA is its graphical interface that allows the traffic manager to modify the computer-generated schedules for specific aircraft while allowing the automatic scheduler to continue generating schedules for all other aircraft. The graphical interface also provides convenient methods for monitoring the traffic flow and changing scheduling parameters during real-time operation.

Nedell, William↗

Verifying command sequences for satellite systems

We present a formal basis for the design of a Checker used in validating safe schedules and in selecting error recovery schedules for satellite control systems. This design includes a high-level specification of Checker behavior and properties (called flight rules) of safe schedules. Specifications are written in Timed Linear Logic (TLL). Validation of schedules is performed in terms of real-time telemetry and deduction system proof rules. Telemetry (state information for satellite subsystems) serves as input to the Checker. Detection of violation of a flight rule by the Checker results in the selection of a contingency plan (error recovery schedule). The Checker is illustrated in terms of the TOPEX/Poseidon Oceanographic Satellite System.

Peters, James F., III↗

A criterion autoscheduler for long range planning

A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubble Space Telescope. A meta-level scheduler called the Criterion Autoscheduler for Long range planning (CASL) was created to guide SPIKE's schedule generation according to the agenda of the planning scientists. It is proposed that sufficient flexibility exists in a schedule to allow high level planning heuristics to be applied without adversely affected crucial constraints such as spacecraft efficiency. This hypothesis is supported by test data which is described.

Sponsler, Jeffrey L.↗

CATLAC - Calibration and Validation Analysis Tool of Local Area Coverage for the SeaWiFS Mission

Calibration and validation Analysis Tool of Local Area Coverage (CATLAC) is an analysis package for selecting and graphically displaying Earth and space targets for calibration and validation activities on a polar orbiting satellite. The package is written in the Interactive Data Language (IDL) and includes a graphical user interface. Although it is designed specifically for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) mission, the package can be used for analysis on other Earth-viewing missions. An individual can use text or graphical methods in CATLAC to select Earth targets to be scanned by a satellite. Additional onboard calibration activities (such as observations of the moon, or solar irradiance from a solar diffuser), which use data recorder time, can also be specified. All information pertinent to the creation of a command schedule can be written to a file which is read by a command scheduler. The scheduler can be invoked and the Local Area Coverage (LAC) recording periods can be visually verified using CATLAC. The schedule can also be verified by examining record and error files written by the scheduler.

Woodward, Robert H.↗

A mission planning concept and mission planning system for future manned space missions

The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

Wickler, Martin↗

Performance and policy dimensions in internet routing

The Internet Routing Project, referred to in this report as the 'Highball Project', has been investigating architectures suitable for networks spanning large geographic areas and capable of very high data rates. The Highball network architecture is based on a high speed crossbar switch and an adaptive, distributed, TDMA scheduling algorithm. The scheduling algorithm controls the instantaneous configuration and swell time of the switch, one of which is attached to each node. In order to send a single burst or a multi-burst packet, a reservation request is sent to all nodes. The scheduling algorithm then configures the switches immediately prior to the arrival of each burst, so it can be relayed immediately without requiring local storage. Reservations and housekeeping information are sent using a special broadcast-spanning-tree schedule. Progress to date in the Highball Project includes the design and testing of a suite of scheduling algorithms, construction of software reservation/scheduling simulators, and construction of a strawman hardware and software implementation. A prototype switch controller and timestamp generator have been completed and are in test. Detailed documentation on the algorithms, protocols and experiments conducted are given in various reports and papers published. Abstracts of this literature are included in the bibliography at the end of this report, which serves as an extended executive summary.

Mills, David L.↗

A sustainable genetic algorithm for satellite resource allocation

A hybrid genetic algorithm is used to schedule tasks for 8 satellites, which can be modelled as a robot whose task is to retrieve objects from a two dimensional field. The objective is to find a schedule that maximizes the value of objects retrieved. Typical of the real-world tasks to which this corresponds is the scheduling of ground contacts for a communications satellite. An important feature of our application is that the amount of time available for running the scheduler is not necessarily known in advance. This requires that the scheduler produce reasonably good results after a short period but that it also continue to improve its results if allowed to run for a longer period. We satisfy this requirement by developing what we call a sustainable genetic algorithm.

Abbott, R. J.↗

Application of Hybrid Optimization-Expert System for Optimal Power Management on Board Space Power Station

The space power system has two sources of energy: photo-voltaic blankets and batteries. The optimal power management problem on-board has two broad operations: off-line power scheduling to determine the load allocation schedule of the next several hours based on the forecast of load and solar power availability. The nature of this study puts less emphasis on speed requirement for computation and more importance on the optimality of the solution. The second category problem, on-line power rescheduling, is needed in the event of occurrence of a contingency to optimally reschedule the loads to minimize the 'unused' or 'wasted' energy while keeping the priority on certain type of load and minimum disturbance of the original optimal schedule determined in the first-stage off-line study. The computational performance of the on-line 'rescheduler' is an important criterion and plays a critical role in the selection of the appropriate tool. The Howard University Center for Energy Systems and Control has developed a hybrid optimization-expert systems based power management program. The pre-scheduler has been developed using a non-linear multi-objective optimization technique called the Outer Approximation method and implemented using the General Algebraic Modeling System (GAMS). The optimization model has the capability of dealing with multiple conflicting objectives viz. maximizing energy utilization, minimizing the variation of load over a day, etc. and incorporates several complex interaction between the loads in a space system. The rescheduling is performed using an expert system developed in PROLOG which utilizes a rule-base for reallocation of the loads in an emergency condition viz. shortage of power due to solar array failure, increase of base load, addition of new activity, repetition of old activity etc. Both the modules handle decision making on battery charging and discharging and allocation of loads over a time-horizon of a day divided into intervals of 10 minutes. The models have been extensively tested using a case study for the Space Station Freedom and the results for the case study will be presented. Several future enhancements of the pre-scheduler and the 'rescheduler' have been outlined which include graphic analyzer for the on-line module, incorporating probabilistic considerations, including spatial location of the loads and the connectivity using a direct current (DC) load flow model.

Momoh, James↗

Market-Based Approaches to Managing Science Return from Planetary Missions

A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.

Wessen, Randii R.↗

Technology Demonstrator for Direct Polishing of a 50cm C/SiC Ultra Light Mirror

The NRSU portion of the contract was completed on schedule and within acceptable limits of the estimated cost. The lapping of the substrate started on schedule, and completed ahead of schedule. The polishing of the substrate was begun ahead of schedule, and was completed approximately one month ahead of schedule. It is our opinion that the substrate meets the requirements of "diffraction limited performance at 2 microns" over the measured 16 in. area. The final photos suggest that there may be edge roll-off beyond the 16 in. diameter. However, we cannot quantify this. It is our opinion that this material is suitable for use in lightweight optics as long as cladding of some type is used (Silicon, SiC, Sol-Gel, etc), as the bare material itself is too "porous" to obtain a high quality finish. We feel that this part was at the low limit of structural integrity required to mechanically polish to this level of figure requirement. Any lesser structural integrity would require some form of "non contact" figuring.

Scribner, Ken↗

The Associate Principal Astronomer for AI Management of Automatic Telescopes

This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.

Henry, Gregory W.↗

Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

Greenberg, Ed↗

Refine your search to explore more results.