Report from the Fermilab Proton Intensity Upgrade Central Design Group
This document is the primary output of the Proton Intensity Upgrade Central Design Group (PIU CDG) which was convened in the summer of 2022. The Group was asked to study options and provide recommendations for upgrading the Fermilab Accelerator Complex including increased reliability and capability and a focus on increasing the proton intensity to the LBNF beamline. Several approaches and combinations of approaches were examined for capability, cost, schedule, risks, and necessary R&D