Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program benefits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Regulators’ Financial Toolbox: Designing Low- and Moderate- Income (LMI) Community Solar Compensation Programs

On February 9, 2022, as part of the NARUC Winter Policy Summit, five NARUC Staff Subcommittees (Energy Resources and the Environment, Rate Design, Electricity, Electric Reliability and Resilience, and Consumers and the Public Interest) co-hosted two sessions on community solar. The first panel was Community Solar I: Benefits for Low- and Moderate-Income Consumers, featuring opening remarks from moderator Hon. Eric Blank, Chairman of the Colorado Public Utilities Commission, and presentations from Richard Caperton, Vice President, Policy and Market Development, Arcadia, on behalf of the Coalition for Community Solar Access (CCSA); Chris Nichols, Senior Program Director, Groundswell; and Ted Trabue, Managing Director, DC Sustainable Energy Utility. See presentations and recordings. The second panel, titled What is Community Solar 2: Cost Impacts to Participants and Non-Participants, featured opening remarks from moderator Jamie Barber, Director of the Energy Efficiency and Renewable Energy Unit at the Georgia Public Service Commission, and presentations from Dr. Gabriel Chan, Associate Professor, Humphrey School of Public Affairs, University of Minnesota; Matthew McDonnell, Managing Director, Strategen Consulting; and Katie Chiles Ottenweller, Southeast Director, Vote Solar. See presentations and recordings.

14 SOLAR ENERGY↗

Business Models for Scaling Demand Flexibility Volume II – Customer relationship management strategies, challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility program customer relationship management strategies, which provide information on value creation and focus on ensuring customers can navigate programs smoothly. This report discusses the role of customer relationship management strategies in demand flexibility programs, characterizes customer relationship management strategies that can be considered during program design and implementation, identifies existing challenges to customer relationship management strategies, and describes lessons learned. This report is part of a series that includes reports on value propositions, stakeholder ecosystem management, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Business Models for Scaling Demand Flexibility Volume IV – Program life cycle challenges and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on the life cycle of demand flexibility programs, which provides information on value creation and describes the various deployment phases program implementers navigate from initial program conceptualization through to program expansion and replication to new customer segments and regions. This report characterizes the key phases of the demand flexibility program life cycle, identifies existing challenges across the program deployment phases, and describes lessons learned. This report is part of a series that includes reports on customer relationship management strategies, stakeholder ecosystem management, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020 by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage (EDS). This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo era experts to derive other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, WIlliam↗

Integrating Existing Simulation Components into a Cohesive Simulation System

A tradition of leveraging the re-use of components to help manage costs has evolved in the development of complex system. This tradition continues on in the Joint Polar Satellite System (JPSS) Program with the cloning of the Suomi National Polar-orbiting Partnership (NPP) satellite for the JPSS-1 mission, including the instrument complement. One benefit of re-use on a mission is the availability of existing simulation assets from the systems that were previously built. An issue arises in the continual shift of technology over a long mission, or multi-mission, lifecycle. As the missions mature, the requirements for the observatory simulations evolve. The challenge in this environment becomes re-using the existing components in that ever-changing landscape. To meet this challenge, the system must: establish an operational architecture that minimizes impacts on the implementation of individual components, consolidate the satisfaction of new high-impact requirements into system-level infrastructure, and build in a long-term view of system adaptation that spans the full lifecycle of the simulation system. The Flight Vehicle Test Suite (FVTS) within the JPSS Program is defining and executing this approach to ensure a robust simulation capability for the JPSS multi-mission environment

McLaughlin, Brian J.↗

Building America Case Study: Quantifying the Financial Benefits of Multifamily Retrofits, Chicago, Illinois

Increasing the adoption of energy efficient building practices will require the energy sector to increase their understanding of the way that retrofits affect multifamily financial performance as well as how those indicators are interpreted by the lending and appraisal industries. This project analyzed building, energy, and financial program data as well as other public and private data to examine the relationship between energy efficiency retrofits and financial performance on three levels: building, city, and community. The project goals were to increase the data and analysis in the growing body of multifamily financial benefits work as well provide a framework for other geographies to produce similar characterization. The goals are accomplished through three tasks: Task one: A pre- and post-retrofit analysis of thirteen Chicago multifamily buildings. Task two: A comparison of Chicago income and expenses to two national datasets. Task three: An in-depth look at multifamily market sales data and the subsequent impact of buildings that undergo retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Systems engineering and integration: Advanced avionics laboratories

In order to develop the new generation of avionics which will be necessary for upcoming programs such as the Lunar/Mars Initiative, Advanced Launch System, and the National Aerospace Plane, new Advanced Avionics Laboratories are required. To minimize costs and maximize benefits, these laboratories should be capable of supporting multiple avionics development efforts at a single location, and should be of a common design to support and encourage data sharing. Recent technological advances provide the capability of letting the designer or analyst perform simulations and testing in an environment similar to his engineering environment and these features should be incorporated into the new laboratories. Existing and emerging hardware and software standards must be incorporated wherever possible to provide additional cost savings and compatibility. Special care must be taken to design the laboratories such that real-time hardware-in-the-loop performance is not sacrificed in the pursuit of these goals. A special program-independent funding source should be identified for the development of Advanced Avionics Laboratories as resources supporting a wide range of upcoming NASA programs.

Source record↗

Experiences with High-Level Programming Directives for Porting Applications to GPUs

HPC systems now exploit GPUs within their compute nodes to accelerate program performance. As a result, high-end application development has become extremely complex at the node level. In addition to restructuring the node code to exploit the cores and specialized devices, the programmer may need to choose a programming model such as OpenMP or CPU threads in conjunction with an accelerator programming model to share and manage the difference node resources. This comes at a time when programmer productivity and the ability to produce portable code has been recognized as a major concern. In order to offset the high development cost of creating CUDA or OpenCL kernels, directives have been proposed for programming accelerator devices, but their implications are not well known. In this paper, we evaluate the state of the art accelerator directives to program several applications kernels, explore transformations to achieve good performance, and examine the expressiveness and performance penalty of using high-level directives versus CUDA. We also compare our results to OpenMP implementations to understand the benefits of running the kernels in the accelerator versus CPU cores.

43 PARTICLE ACCELERATORS↗

Heavy Lift for Exploration: Options and Utilization

Every study of exploration capabilities since the Apollo Program has recommended the renewal of a heavy lift launch capability for the United States. NASA is aggressively pursuing that capability. This paper will discuss several aspects of that effort and the potential uses for that heavy lift capability. The need for heavy lift was cited most recent in the findings of the Review of U.S. Human Space Flight Plans Committee. Combined with considerations of launch availability and on-orbit operations, the Committee finds that exploration will benefit from the availability of a heavy-lift vehicle, the report said. In addition, heavy lift would enable the launching of large scientific observatories and more capable deep-space missions. It may also provide benefit in national security applications. The most recent focus of NASA s heavy lift effort is the Ares V cargo launch vehicle, which is part of the Constellation Program architecture for human exploration beyond low Earth orbit (LEO). The most recent point-of-departure configuration of the Ares V was approved during the Lunar Capabilities concept Review (LCCR) in 2008. The Ares V first stage propulsion system consists of a core stage powered by six commercial liquid hydrogen/liquid oxygen (LH2/LOX) RS-68 engines, flanked by two 5.5-segment solid rocket boosters (SRBs) based on the 5-segment Ares I first stage. The boosters use the same Polybutadiene Acrylonitrile (PBAN) propellant as the Space Shuttle. Atop the core stage is the Earth departure stage (EDS), powered by a single J-2X upper stage engine based on the Ares I upper stage engine. The 33-foot-diameter payload shroud can enclose a lunar lander, scientific instruments, or other payloads. Since LCCR, NASA has continued to refine the design through several successive internal design cycles. In addition, NASA has worked to quantify the broad national consensus for heavy lift in ways that, to the extent possible, meet the needs of the user community.

Creech, Steve↗

The Astro Edge solar array for the NASA SSTI Clark Spacecraft

The Astro Edge solar array is a new and innovative reflective low concentrator power generating system which has been selected for the CTA Incorporate/Lockheed Martin Clark spacecraft under the NASA Small Spacecraft Technology Initiative (SSTI) program. In support of this program, Astro Aerospace Corporation has produced one qualification and two flight solar array wings to support a July 1996 launch. The Astro Edge solar array was selected as a new technology to benefit future NASA, military and commercial missions by providing high specific power, high deployed stiffness, low stowed volume, low risk, and cost reduction features which meet the agency's 'better, faster, cheaper' goals. This novel array accounts for five of the thirty-six advanced technologies which the Clark spacecraft will demonstrate. A brief SSTI Astro Edge solar array program overview is presented. Completed qualification and acceptance testing is discussed. Finally, the major discriminators which make the Astro Edge solar array 'better, faster, cheaper' technology are provided.

Spence, B. R.↗

A Scalable Online Monitoring System Based on Elasticsearch for Distributed Data Acquisition in Cms

The part of the CMS Data Acquisition (DAQ) system responsible for data readout and event building is a complex network of interdependent distributed applications. To ensure successful data taking, these programs have to be constantly monitored in order to facilitate the timeliness of necessary corrections in case of any deviation from specified behaviour. A large number of diverse monitoring data samples are periodically collected from multiple sources across the network. Monitoring data are kept in memory for online operations and optionally stored on disk for post-mortem analysis. We present a generic, reusable solution based on an open source NoSQL database, Elasticsearch, which is fully compatible and non-intrusive with respect to the existing system. The motivation is to benefit from an off the-shelf software to facilitate the development, maintenance and support efforts. Elasticsearch provides failover and data redundancy capabilities as well as a programming language independent JSON-over-HTTP interface. The possibility of horizontal scaling matches the requirements of a DAQ monitoring system. The data load from all sources is balanced by redistribution over an Elasticsearch cluster that can be hosted on a computer cloud. In order to achieve the necessary robustness and to validate the scalability of the approach the above monitoring solution currently runs in parallel with an existing in-house developed DAQ monitoring system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

XTCE and XML Database Evolution and Lessons from JWST, LandSat, and Constellation

The database organizations within three different NASA projects have advanced current practices by creating database synergy between the various spacecraft life cycle stakeholders and educating users in the benefits of the Consultative Committee for Space Data Systems (CCSDS) XML Telemetry and Command Exchange (XTCE) format. The combination of XML for managing program data and CCSDS XTCE for exchange is a robust approach that will meet all user requirements using Standards and Non proprietary tools. COTS tools for XTCEKML are very wide and varied. To combine together various low cost and free tools can be more expensive in the long run than choosing a more expensive COTS tool that meets all the needs. This was especially important when deploying in 32 remote sites with no need for licenses. A common mission XTCEKML format between dissimilar systems is possible and is not difficult. Command XMLKTCE is more complex than telemetry and the use of XTCEKML metadata to describe pages and scripts is needed due to the proprietary nature of most current ground systems. Other mission and science products such as spacecraft loads, science image catalogs, and mission operation procedures can all be described with XML as well to increase there flexibility as systems evolve and change. Figure 10 is an example of a spacecraft table load. The word is out and the XTCE community is growing, The f ~ sXt TCE user group was held in October and in addition to ESAESOC, SC02000, and CNES identified several systems based on XTCE. The second XTCE user group is scheduled for March 10, 2008 with LDMC and others joining. As the experience with XTCE grows and the user community receives the promised benefits of using XTCE and XML the interest is growing fast.

Gal-Edd, Jonathan↗

Northwest Combined Heat and Power Technical Assistance Partnership: Final Scientific/Technical Report

During the years of 2018 through 2023, The Washington State University Energy Program (WSU EP) operated the Northwest Combined Heat and Power Technical Assistance Partnership under contract to the US Department of Energy’s Advanced Manufacturing Office (AMO), a part of DOE’s larger Office of Energy Efficiency and Renewable Energy. This contract provided direction and funding for providing technical outreach, information and technical/economic analysis services in support of expanding development of Combined Heat and Power (CHP) over a four state region in the Pacific Northwest. The states served included Alaska, Idaho, Oregon and Washington. During the duration of this contract, the WSU EP delivered performed specific assigned tasks and provided services of various generally prescribed types, with the overall goal of increasing adoption of CHP as an efficient heat and power supply in the region. Indications – though not formally evaluated to our knowledge – are that this goal was achieved. Over many years, the WSU team has provided support for CHP developments in these states under similar previous Department of Energy contracts, and many such projects have been built. While the early-phase outreach, education and techno-economic assessments that the NW CHP TAP provides rarely immediately result in project construction, there is no doubt that the WSU EP team has had substantial influence in the construction of a number of important CHP projects in the region. Examples of projects implemented directly under the current team’s guidance and services during this contract cycle include an 875 kilowatt biomass fueled CHP system installed at the University of Idaho, and 5 megawatt natural gas fueled CHP system at the University of Montana ( UM Breaks Ground on New Power Facility, Slashes Emissions 30% (umt.edu) ). Many other CHP systems recently installed are also either directly or at least partially the result of information and technical services provided by the team. Finally, though much more difficult to quantify and less glamorous, the team has helped countless organizations to understand CHP and determine whether and how CHP may be a fit for them, before they consider paying for engineering services. Whether the ultimate outcome has been to include CHP or not, the expert skills provided by the NW CHP TAP team have provided real value to these organizations considering this relatively complex technology. Over the duration of the contract our team provided 71 Initial Technical Assessments and 17 Advanced Technical Assessments; 53 End-User Engagements and 33 Stakeholder Engagements of various types; 42 Technical Profiles (Project Profiles, Program Profiles and Policy Profiles), and produced 14 technical articles for the Department of Energy. Unfortunately, these quantities provide no measure of the value that the team has provided. Only our clients can judge that, and we are confident that they are pleased with the benefits we have offered them.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Integrated Status and Effectiveness Monitoring Program : Expansion of Existing Smolt Trapping Program and Steelhead Spawner Surveys : March 1st, 2008 - February 28th, 2009.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and; (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g., Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring, and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Variation (Status and Trend) of Fine Sediment in Spawning Gravel within the Entiat River Subbasin : July 2008 - October 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance; and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The integrated Status and Effectiveness Monitoring Program : U.S. Forest Service Fish Abundance and Steelhead Redd Surveys Annual Report : January 1 - December 31, 2008.

This contract report is one of a series of reports that document implementation components of the Bonneville Power Administration's (BPA) funded project: Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00, Chris Jordan, NOAA-NWFSC project sponsor). Other components of the project are separately reported, as explained below. The ISEMP project has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical data management, communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring, and Evaluation (RME) program to assess the status of anadromous salmonids populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods requires the testing of multiple approaches. Thus, ISEMP has adopted an approach to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot areas, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall ISEMP, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

Wasatch Solar Project Final Report

The Wasatch Solar Project was a collaborative effort to conduct stakeholder engagement and provide technical assistance and analysis to support solar market development in Utah. The Wasatch Solar Project addressed four topic areas: 1) technical analysis to inform an assessment of the net benefits and costs of solar in Utah; 2) development of a 10-Year Solar Deployment Plan to create a clear path for continued solar deployment in Utah; 3) demonstration of the costs and resiliency benefits of solar and storage for resiliency at emergency response facilities or public facilities; and 4) technical assistance to create a replicable Commercial Property Assessed Clean Energy (C-PACE) financing program in Utah. The Wasatch Solar Project identified that new technical new technical challenges arise as nascent markets grow to higher penetrations of solar, requiring more detailed interconnection standards and improved efficiency in the interconnection process; that it is difficult for entities served by utilities that do not collect hourly usage data to assess the economic value of solar and storage; that despite significant resiliency benefits, the high cost of battery storage limits its adoption at healthcare and emergency response facilities in states like Utah that have low electricity rates; that administration of C-PACE financing at a local jurisdictional level can be complex, cumbersome, and a barrier to widespread utilization; and that investments in distributed generation can result in long-term savings for utility customers.

14 SOLAR ENERGY↗

Refine your search to explore more results.