Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

A framework for benchmarking land models

Land models, which have been developed by the modeling community in the past few decades to predict future states of ecosystems and climate, have to be critically evaluated for their performance skills of simulating ecosystem responses and feedback to climate change. Benchmarking is an emerging procedure to measure performance of models against a set of defined standards. This paper proposes a benchmarking framework for evaluation of land model performances and, meanwhile, highlights major challenges at this infant stage of benchmark analysis. The framework includes (1) targeted aspects of model performance to be evaluated, (2) a set of benchmarks as defined references to test model performance, (3) metrics to measure and compare performance skills among models so as to identify model strengths and deficiencies, and (4) model improvement. Land models are required to simulate exchange of water, energy, carbon and sometimes other trace gases between the atmosphere and land surface, and should be evaluated for their simulations of biophysical processes, biogeochemical cycles, and vegetation dynamics in response to climate change across broad temporal and spatial scales. Thus, one major challenge is to select and define a limited number of benchmarks to effectively evaluate land model performance. The second challenge is to develop metrics of measuring mismatches between models and benchmarks. The metrics may include (1) a priori thresholds of acceptable model performance and (2) a scoring system to combine data–model mismatches for various processes at different temporal and spatial scales. The benchmark analyses should identify clues of weak model performance to guide future development, thus enabling improved predictions of future states of ecosystems and climate. The near-future research effort should be on development of a set of widely acceptable benchmarks that can be used to objectively, effectively, and reliably evaluate fundamental properties of land models to improve their prediction performance skills.

Biophysical Processes↗

Evaluation of Material Balance Approaches for Hanford Direct-Feed Low Activity Waste Processing - 20022

The Hanford Site has accumulated millions of gallons of tank waste from reprocessing spent fuel to recover plutonium, uranium, cesium, and strontium. The supernatant from the accumulated tank waste will be treated using a Direct Feed Low-Activity Waste approach. The supernatant will be treated to remove solids and cesium in the Tank-Side Cesium Removal process in the Hanford tank farm, then vitrified in a semi-batch process in the Hanford Waste Treatment and Immobilization Plant (WTP). Currently, each batch of feed is sampled at three locations prior to being fed to the melter: the feed qualification tank in the Hanford tank farm as well as the concentrate receipt vessel (CRV) and melter feed preparation vessel (MFPV) in the WTP. The feed qualification sample is taken from a large batch of accumulated feed, only two to three samples are expected each year. Approximately 275 samples from the CRVs and 1100 samples from the MFPV are expected each year. An evaluation was performed to determine if a material balance based on the feed qualification sample could replace most of the sampling in the CRVs and MFPVs. The evaluation consisted of three elements: (1) determination of the practicality of using a material balance to estimate the stream composition of the CRV and MFPV contents, (2) evaluation of whether the material balance could be automated using the existing process control system, and (3) determination of the uncertainty in glass composition using the material balance approach. It is assumed that periodic sampling at the CRV and MFPV would be performed periodically to re-baseline the material balance, evaluations are in progress to determine the frequency of this periodic sampling. Process sample locations downstream of the melter were reviewed as well, but the partitioning of semi-volatile species in the melter was determined to preclude extending the material balance approach past the melter. It was determined that replacement of the CRV sample location was feasible and did not increase process uncertainty or significantly impact waste loading. Replacement of the MFPV sample was also determined to be feasible, but that measurement of the glass former chemical addition may be needed prior to addition of these chemicals to the MFPV. This measurement could be performed by an in situ laser-induced breakdown spectroscopy (LIBS) system. Limited tests were performed to evaluate LIBS for direct measurements of the low-activity waste melter feed. The use of a material balance would eliminate over 1200 samples each year if only 10% of the CRV and MFPV batches are sampled and could likely allow the WTP laboratory to operate on days only versus 24/7 operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Chemical Cleaning Methods for High Level Waste Tanks: Actual Waste Testing with SRS Tank 5F Sludge

Solubility testing with actual High Level Waste tank sludge has been conducted in order to evaluate several alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge sluicing efforts. Tests were conducted with archived Savannah River Site (SRS) radioactive sludge solids that had been retrieved from Tank 5F in order to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent toward dissolving the bulk non-radioactive waste components. Solubility tests were performed by direct sludge contact with the oxalic/nitric acid reagent and with sludge that had been pretreated and acidified with dilute nitric acid. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid following current baseline tank chemical cleaning methods. One goal of testing with the optimized reagent was to compare the total amounts of oxalic acid and water required for sludge dissolution using the baseline and optimized cleaning methods. A second objective was to compare the two methods with regard to the dissolution of actinide species known to be drivers for SRS tank closure Performance Assessments (PA). Additionally, solubility tests were conducted with Tank 5 sludge using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-459: ArcCHECK Machine QA : Highly Efficient Quality Assurance Tool for VMAT, SRS & SBRT Linear Accelerator Delivery

Purpose: Quality assurance (QA) of complex linear accelerators is critical and highly time consuming. ArcCHECK Machine QA tool is used to test geometric and delivery aspects of linear accelerator. In this study we evaluated the performance of this tool. Methods: Machine QA feature allows user to perform quality assurance tests using ArcCHECK phantom. Following tests were performed 1) Gantry Speed 2) Gantry Rotation 3) Gantry Angle 4)MLC/Collimator QA 5)Beam Profile Flatness & Symmetry. Data was collected on trueBEAM stX machine for 6 MV for a period of one year. The Gantry QA test allows to view errors in gantry angle, rotation & assess how accurately the gantry moves around the isocentre. The MLC/Collimator QA tool is used to analyze & locate the differences between leaf bank & jaw position of linac. The flatness & Symmetry test quantifies beam flatness & symmetry in IEC-y & x direction. The Gantry & Flatness/Symmetry test can be performed for static & dynamic delivery. Results: The Gantry speed was 3.9 deg/sec with speed maximum deviation around 0.3 deg/sec. The Gantry Isocentre for arc delivery was 0.9mm & static delivery was 0.4mm. The maximum percent positive & negative difference was found to be 1.9 % & – 0.25 % & maximum distance positive & negative diff was 0.4mm & – 0.3 mm for MLC/Collimator QA. The Flatness for Arc delivery was 1.8 % & Symmetry for Y was 0.8 % & X was 1.8 %. The Flatness for gantry 0°,270°,90° & 180° was 1.75,1.9,1.8 & 1.6% respectively & Symmetry for X & Y was 0.8,0.6% for 0°, 0.6,0.7% for 270°, 0.6,1% for 90° & 0.6,0.7% for 180°. Conclusion: ArcCHECK Machine QA is an useful tool for QA of Modern linear accelerators as it tests both geometric & delivery aspects. This is very important for VMAT, SRS & SBRT treatments.

43 PARTICLE ACCELERATORS↗

Renovation of Thermal Vacuum Chambers at Idaho National Laboratory (INL) for Testing of Radioisotope Power Systems (RPS)

The Radioisotope Power Systems (RPS) program at Idaho National Laboratory (INL) fuels and performs environmental testing of RPS in support of National Aeronautics and Space Administration (NASA) missions. Recently the programs’ thermal vacuum chambers, housed within INL’s Space and Security Power Systems Facility (SSPSF), underwent successful renovations to improve functional capabilities and system control in support of customer missions. Thermal vacuum system renovations focused primarily on three core functions. The first focus area was integration of semi-automated Programmable Logic Controllers (PLC) to enhance operational feedback and process control. This included the use of numerically controlled vacuum valves and integration of real time feedback from process pressure transducers. Improvements to the system high vacuum pumping technology was the second priority focus. Legacy diffusion pumps were replaced with turbo-molecular and cryogenic pumps to help mitigate the possibility of back streaming diffusion pump oil onto the surface of the test article or radiative cooling surfaces located within the chambers. The third and final core function involved meeting emergent customer thermal requirements. This led to retro-fitting one of the vacuum chambers with a cryogenically cooled Thermal Conditioning Unit (TCU) and thermal shrouds. The TCU utilizes gaseous nitrogen to heat or cool a cylindrical shroud to maintain a set temperature with a programmable range of -I85 °C to I00 °C. With the successful completion of RPS acceptance testing, the newly renovated thermal vacuum chamber systems are operational and better equipped to support testing of Radioisotope Power Systems for space exploration missions.

42 ENGINEERING↗

Renovation of Thermal Vacuum Chambers at Idaho National Laboratory (INL) for Testing of Radioisotope Power Systems (RPS)

The Radioisotope Power Systems (RPS) program at Idaho National Laboratory (INL) fuels and performs environmental testing of RPS in support of National Aeronautics and Space Administration (NASA) missions. Recently the programs’ thermal vacuum chambers, housed within INL’s Space and Security Power Systems Facility (SSPSF), underwent successful renovations to improve functional capabilities and system control in support of customer missions. Thermal vacuum system renovations focused primarily on three core functions. The first focus area was integration of semi-automated Programmable Logic Controllers (PLC) to enhance operational feedback and process control. This included the use of numerically controlled vacuum valves and integration of real time feedback from process pressure transducers. Improvements to the system high vacuum pumping technology was the second priority focus. Legacy diffusion pumps were replaced with turbo-molecular and cryogenic pumps to help mitigate the possibility of back streaming diffusion pump oil onto the surface of the test article or radiative cooling surfaces located within the chambers. The third and final core function involved meeting emergent customer thermal requirements. This led to retro-fitting one of the vacuum chambers with a cryogenically cooled Thermal Conditioning Unit (TCU) and thermal shrouds. The TCU utilizes gaseous nitrogen to heat or cool a cylindrical shroud to maintain a set temperature with a programmable range of -I85 °C to I00 °C. With the successful completion of RPS acceptance testing, the newly renovated thermal vacuum chamber systems are operational and better equipped to support testing of Radioisotope Power Systems for space exploration missions.

42 ENGINEERING↗

Assessment of the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility Hydraulic Performance

This document provides a summary of the expected hydraulic performance of the vault drainage system installed at Idaho National Laboratory’s Remote Handled Low-Level Waste disposal facility. Hydraulic performance was assessed through analysis of the mechanical properties of the drainage system and backfill materials, including material gradation and proctor data; laboratory data, including bulk density, porosity, unsaturated hydraulic conductivity, moisture-retention data, and van Genuchten parameters; and field-data collected using in-situ instrumentation with data collected during a vault-scale infiltration characterization test. Hydraulic performance of the vault drainage system was designed to promote a greater than 500-year vault concrete longevity. The predicted hydraulic performance is, in part, a function of the materials used in construction, sequencing of the hydraulic drainage materials, and the as-built condition of the materials following compaction necessary to ensure vault stability. Specifying specific as-built hydraulic properties is exceedingly difficult at the facility specification/design phase. Instead, material mechanical properties were specified and confirmed early during the construction process. As the drainage materials were installed, samples were sent to a laboratory for hydraulic property testing and, after drainage system installation was complete around the performance assessment vaults, a field-scale infiltration test was conducted with data collection to verify the as-built hydraulic performance. This report provides summary data for the measured mechanical properties, laboratory data, and field infiltration characterization test data. Mechanical data have relatively little variability because of the sieve system used when the materials were crushed onsite. Laboratory data were obtained for a relatively small number of material samples, but the data obtained for each sample are extensive. However, laboratory data provide the moisture retention relationships and relative hydraulic conductivity-moisture content relationships for uninstalled materials. Conducting field-scale infiltration tests with collection of moisture retention data and wetting front propagation data allows extension of laboratory data to the as-installed conditions of the vault drainage system. These combined data types are integrated using a numerical simulation of the infiltration characterization test to refine model parameters. The infiltration characterization model will be used to support the hydraulic and concrete performance of the vault system provided in the facility performance assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R and DE Robotic Sensor Intern Team: Sensor Suite Mock Up Testing

Assess sensor suite performance: - Mounted on crawler typical to what would be used in tunnel; - In test bed simulating the tunnel environment. The SuperDroid fiber tethered LT-F crawler is a general-purpose surveillance robot that our team has refurbished as a testing platform for the sensor suite. This crawler was selected because its dimensions are similar to the actual crawler that will be deployed in the field. Crawler preparation included: - Communicating with vendor to resolve software and platform issues; - Configuring a laptop with the crawler control software; - Reconfiguration of communication protocol between computer and crawler; - Resolution of control board checksum errors; - Installation of a mounting fixture on the base; - In progress: addition of lighting needed for total darkness. A solution for hosting the selected sensors onto a single unit that could function standalone or be mounted on the crawler was needed. Sensor mount requirements included: - Host Lidar, panospheric cameras and IMU sensors; - Cable management for rotating Lidar; - House on-board crawler computer; - Method for affixing to crawler; - Robust and vibration proof. The Lidar sensor required a sturdy mount that ensured the axis of rotation be centered with the LiDAR's desired laser path and included a slender profile in order to not block the scanning FOV. The mounting plate holds two 180-degree cameras on either side and the servo on the center. The servo mount is located so the axis of rotation is in the center of the plate. The mount features a set of guides that hold the wires and ensure they wrap around the spool area properly. The sensor box design features thick walls for added strength, holes for mounting the sensor suite to the crawler, notches on the bottom for the different components and holes for cable routing and management. The sensor mounts were designed using CREO and printed in the R and DE Additive Manufacturing Lab. To test the performance of the sensor suite for our application it was desired to design and build a test bed simulating the H-Canyon tunnel environment. Requirements included: - Dimensions similar to the tunnel; - Wall surfaces simulating the eroded tunnel walls; - Complete darkness; - Even and uneven crawler path; - Ability to change the tunnel width to simulate erosion. The HCAEX tunnel changes in height and includes several bends ranging from approximately 30 to 80 degrees, for that reason a test bed capable of easily being changed was needed. The final design includes two sections that can be connected to provide a 16' tunnel or placed at an angle to create a tunnel bend. The test bed features caster wheels for easy movement and has a sliding inner wall that enables tunnel width to be controlled. In order to simulate the tunnel walls without adding a lot of weight to the test bed, sheets of faux stone are to be used on the inner walls. To create a completely dark tunnel, 100% black-out film will be draped over the tunnel structure. Carpet remnants in the lab will enable folds to be introduced in the floor to generate uneven surface data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International challenge to model the long-range transport of radioxenon released from medical isotope production to six Comprehensive Nuclear-Test-Ban Treaty monitoring stations

After performing a first multi-model exercise in 2015 a comprehensive and technically more demanding atmospheric transport modelling challenge was organized in 2016. Release data were provided by the Australian Nuclear Science and Technology Organization radiopharmaceutical facility in Sydney (Australia) for a one month period. Measured samples for the same time frame were gathered from six International Monitoring System stations in the Southern Hemisphere with distances to the source ranging between 680 (Melbourne) and about 17,000 km (Tristan da Cunha). Participants were prompted to work with unit emissions in pre-defined emission intervals (daily, half-daily, 3-hourly and hourly emission segment lengths) and in order to perform a blind test actual emission values were not provided to them. Despite the quite different settings of the two atmospheric transport modelling challenges there is common evidence that for long-range atmospheric transport using temporally highly resolved emissions and highly space-resolved meteorological input fields has no significant advantage compared to using lower resolved ones. As well an uncertainty of up to 20% in the daily stack emission data turns out to be acceptable for the purpose of a study like this. Model performance at individual stations is quite diverse depending largely on successfully capturing boundary layer processes. No single model-meteorology combination performs best for all stations. Moreover, the stations statistics do not depend on the distance between the source and the individual stations. Finally, it became more evident how future exercises need to be designed. Set-up parameters like the meteorological driver or the output grid resolution should be pre-scribed in order to enhance diversity as well as comparability among model runs.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Improving the space surveillance telescope's performance using multi-hypothesis testing

The Space Surveillance Telescope (SST) is a Defense Advanced Research Projects Agency program designed to detect objects in space like near Earth asteroids and space debris in the geosynchronous Earth orbit (GEO) belt. Binary hypothesis test (BHT) methods have historically been used to facilitate the detection of new objects in space. In this paper a multi-hypothesis detection strategy is introduced to improve the detection performance of SST. In this context, the multi-hypothesis testing (MHT) determines if an unresolvable point source is in either the center, a corner, or a side of a pixel in contrast to BHT, which only tests whether an object is in the pixel or not. The images recorded by SST are undersampled such as to cause aliasing, which degrades the performance of traditional detection schemes. The equations for the MHT are derived in terms of signal-to-noise ratio (S/N), which is computed by subtracting the background light level around the pixel being tested and dividing by the standard deviation of the noise. A new method for determining the local noise statistics that rejects outliers is introduced in combination with the MHT. An experiment using observations of a known GEO satellite are used to demonstrate the improved detection performance of the new algorithm over algorithms previously reported in the literature. The results show a significant improvement in the probability of detection by as much as 50% over existing algorithms. In addition to detection, the S/N results prove to be linearly related to the least-squares estimates of point source irradiance, thus improving photometric accuracy.

79 ASTRONOMY AND ASTROPHYSICS↗

The Need for Precise and Well-documented Experimental Data on Prompt Fission Neutron Spectra from Neutron-induced Fission of {sup 239}Pu

The spectrum of neutrons emitted promptly after {sup 239}Pu(n,f)—a so-called prompt fission neutron spectrum (PFNS)—is a quantity of high interest, for instance, for reactor physics and global security. However, there are only few experimental data sets available that are suitable for evaluations. In addition, some of those data sets differ by more than their 1-σ uncertainty boundaries. We present the results of MCNP studies indicating that these differences are partly caused by underestimated multiple scattering contributions, over-corrected background, and inconsistent deconvolution methods. A detailed uncertainty quantification for suitable experimental data was undertaken including these effects, and test-evaluations were performed with the improved uncertainty information. The test-evaluations illustrate that the inadequately estimated effects and detailed uncertainty quantification have an impact on the evaluated PFNS and associated uncertainties as well as the neutron multiplicity of selected critical assemblies. A summary of data and documentation needs to improve the quality of the experimental database is provided based on the results of simulations and test-evaluations. Given the possibly substantial distortion of the PFNS by multiple scattering and background effects, special care should be taken to reduce these effects in future measurements, e.g., by measuring the {sup 239}Pu PFNS as a ratio to either the {sup 235}U or {sup 252}Cf PFNS.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Experimental setup for the determination of the correction factors of the neutron doseratemeters in fast neutron fields

The use of the U-120 Cyclotron of the IFIN-HH allowed to perform a testing bench with fast neutrons in order to determine the correction factors of the doseratemeters dedicated to neutron measurement. This paper deals with researchers performed in order to develop the irradiation facility testing the fast neutrons flux generated at the Cyclotron. This facility is presented, together with the results obtain in determining the correction factor for a doseratemeter dedicated to the neutron dose equivalent rate measurement.

07 ISOTOPE AND RADIATION SOURCES↗

On-line monitoring for static and dynamic performance verification of I and C systems at Sizewell B nuclear power station - 329

Plant operations and maintenance (O and M) activities account for nearly 75% of the generation cost of a modern nuclear power plant (NPP). This is largely due to time-based maintenance strategies that are expensive, time-consuming, prone to error, and sometimes detrimental to plant equipment. In contrast, condition-based maintenance via on-line monitoring (OLM) can reduce costs, increase equipment availability, and improve safety. OLM uses signals from existing plant sensors to verify the performance of plant instrumentation and equipment while the plant is operating. The Sizewell B nuclear power station in the United Kingdom, a four-loop pressurized water reactor (PWR), uses OLM techniques for several condition-based performance verification activities including pressure, level, and flow transmitter calibration monitoring, resistance temperature detector (RTD) cross calibration, and dynamic performance monitoring of pressure, level, and flow sensing systems. The implementation of OLM has enabled the plant to extend the calibration intervals of its pressure, level, and flow transmitters from 18 to 54 months and has significantly reduced the amount of critical path time needed to perform RTD cross calibration testing (up to 36 hours). Dynamic performance monitoring of its pressure, level, and flow transmitters with OLM has enabled the plant to monitor transmitter and sensing line response degradation while the plant is operating at 100% power and has dramatically reduced testing time versus the traditional hydraulic ramp testing method. The Sizewell B OLM implementation provides valuable insights into on how to overcome the technical and regulatory challenges for widespread OLM adoption by the nuclear industry. This paper describes the technical and regulatory aspects of this implementation and includes detailed examples of static and dynamic performance testing results to demonstrate the types of capabilities of OLM. Analyzing existing signals with OLM technologies can provide significant cost and safety benefits for the existing fleet of nuclear power plants. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SR19021 Tritium Aging of Regenerated LANA.75 (Final Project Report)

The Savannah River Tritium Enterprise (SRTE) has used the metal hydride LaNi 4.25 Al 0.75 (LANA.75) in the Tritium Facilities for over two decades. LANA.75 beds store significant quantities of tritium but have a limited service life due to the radiolytic decay of tritium to He-3 within the metal matrix. It has been shown that heating tritium-aged LANA.75 under vacuum can reverse tritium aging effects, eliminating the heel of trapped hydrogen, and restoring the reversible capacity. Additional investigation is needed to ensure there are no unexpected changes to the hydride before this restoration technique is employed in full scale beds in the Tritium Facilities. This project was to be comprised of three distinct scopes: obtain tritium aging data on the sample regenerated in 2018, regenerate a tritium-aged sample at 600 °C, and perform thermal stability testing on a non-tritiated sample. Isotherms were collected on the previously regenerated sample after approximately two years of tritium aging. Isotherms were collected at 80, 100, and 120 °C. As expected, there was a decrease in the plateau pressure, an increase in plateau slope, and a portion of the “heel” of tritium trapped in the metal had been reestablished. Unexpectedly, it appeared that the plateau had shortened at the higher tritium to metal ratios as well. This is typically seen in older samples. The second scope, to regenerate a second tritium-aged LANA.75 sample, was not completed. A Task Technical and Quality Assurance Plan was written and approved, a high temperature test cell was fabricated, several pre-job briefs were held, and the hydride sample was passivated with air. Despite these successes, the hydride sample was not recovered from the legacy test cell. The third scope was to perform thermal stability testing on a “cold” LANA.75 sample. A non-tritiated sample of LANA.75 was held at 750 °C under vacuum for 200 hours to simulate exposure to multiple regeneration evolutions. Hydride isotherm performance, chemical composition, crystallinity, particle size, and morphology are compared between the pre- and post-regeneration samples. No significant changes were observed in composition, crystallinity, or particle size. Comparison of before and after isotherms showed that performance improved rather than deteriorated during the evolution. Scanning Electron Microscopy (SEM) analysis showed small growths on the particle surface after exposure to regeneration conditions. Additional testing will be required to determine the cause of these growths.

07 ISOTOPE AND RADIATION SOURCES↗

Using in-situ strain measurements to evaluate the accuracy of stress estimation procedures from fracture injection/shut-in tests

Fracture injection/shut-in tests are commonly used to measure the state of stress. Injection creates a hydraulic fracture (or in some cases, opens a preexisting fracture), and then the pressure after shut-in is monitored to identify fracture closure. Different interpretation procedures have been proposed for estimating closure, and the procedures sometimes yield significantly different results. In this study, direct, in-situ strain measurements are used to observe fracture reopening and closure. The tests were performed as part of the EGS Collab project, a mesoscale project performed at 1.25 and 1.5 km depth at the Sanford Underground Research Facility. The tests were instrumented with the SIMFIP tool, a double-packer probe with a high-resolution three-dimensional borehole displacement sensor. The measurements provide a direct observation of the fracture closure signature, enabling a high-fidelity estimate of the fracture closure stress (ie, the normal stress on the fracture). In two of the four tests, injection created an opening mode fracture, and so the closure stress can be interpreted as the minimum principal stress. In the other two tests, injection probably opened preexisting natural fractures, and so the closure stress can be interpreted as the normal stress on the fractures. The strain measurements are compared against different proposed methods for estimating closure stress from pressure transients. The shut-in transients are analyzed with two techniques that are widely used in the field of petroleum engineering – the ‘tangent’ method and the ‘compliance’ method. In three of the four tests, the tangent method significantly underestimates the closure stress. The compliance method is reasonably accurate in all four tests. Closure stress is also interpreted using two other commonly-used methods – ‘first deviation from linearity’ and the method of Hayashi and Haimson. In comparison with the SIMFIP data, these methods tend to overestimate the closure stress, evidently because they identify closure from early-time transient effects, such as near-wellbore tortuosity. In two of the tests, microseismic imaging provides an independent estimate of the size of the fracture created by injection. When combined with a simple mass balance calculation, the SIMFIP stress measurements yield predictions of fracture size that are reasonably consistent with the estimates from microseismic. In conclusion, the calculations imply an apparent fracture toughness 2-3x higher than typical laboratory-derived values.

58 GEOSCIENCES↗

The effect of aging treatment on the fracture toughness and impact strength of injection molded Ni-625 superalloy parts

In this study, the effect of aging heat treatment on fracture toughness and impact strength of Ni-625 superalloy fabricated by using powder injection molding (PIM) method was examined. After a feedstock was prepared by mixing the prealloyed Ni-625 superalloy powder, which was fabricated by gas atomisation, with a polymeric binder system and then it was granulated, it was shaped through the use of injection. The molded specimens were sintered at 1300 °C for 3 h after a two-stage debinding process. Once the sintered specimens were treated in the solution at 1150 °C for 2 h, they were quenched. Aging treatment was performed by keeping specimens at 745 °C for 22 h. Fracture toughness and impact tests were performed on sintered and aged specimens. Microstructure examinations were performed by using optical microscope, scanning electron microscope, and transmission electron microscope. The results revealed that aging heat treatment led to the formation of some carbides and intermetallic phases in the microstructure. While the hardness of the aged specimens increased due to these phases, their fracture toughness and impact strength values decreased. - Highlights: • Ni-625 superalloy components were produced by means of powder injection molding. • The produced components were subjected to aging treatment. • Aging process provided approximately 50% increase in the hardness of components. • Intermetallic precipitates, carbides and TCP phases occurred within the aged parts. • Fracture toughness and impact strength values decreased due to the hard phases.

36 MATERIALS SCIENCE↗

A multi-layer SEU mitigation strategy to improve FPGA design robustness for the ATLAS muon spectrometer upgrade

We present a multi-layer single-event upset mitigation strategy implemented in a low-cost Xilinx Artix-7 FPGA. The implementation is targeted for a trigger data router for the ATLAS muon spectrometer upgrade. The mitigation strategy employs three layers of protection to improve overall FPGA design robustness: use of triple-modular redundancy for FPGA fabric logic and embedded soft-error mitigation in the first layer; further enhancement with multi-boot FPGA reconfiguration across multiple copies of configuration memory in the second layer; and FPGA power cycling and configuration memory re-initialization in the third layer. Here, the effectiveness of this scheme has been evaluated at two different neutron facilities, LANSCE and NCSR ‘‘Demokritos’’, with 800 MeV and 25 MeV beam energies, respectively. Testing was performed with a similar configuration to that planned for final operation. We discuss the testing strategy and summarize the test results to estimate the expected data loss over 10 years of operation in the ATLAS experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Refine your search to explore more results.