Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Unreviewed Disposal Question Evaluation: Disposal of the Idaho National Laboratory Repackaged Uranium Metal and Oxide with Polychlorinated Biphenyls at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the Idaho National Laboratory (INL) Repackaged Uranium Metal and Oxide with polychlorinated biphenyls (PCBs) is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the INL Repackaged Uranium Metal and Oxide with PCBs waste stream meets all the performance objectives contained in DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P. The INL Repackaged Uranium Metal and Oxide with PCBs waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigations on optimization of accident management measures following a station blackout accident in a VVER-1000 pressurized water reactor

The reactor safety issues are of primary importance for preserving the health of the population and ensuring no release of radioactivity and fission products into the environment. A part of the nuclear research focuses on improvement of the safety of existing nuclear power plants. Studies, research and efforts are a continuing process at improving the safety and reliability of existing and newly developed nuclear power plants at prevention of a core melt accident. Station blackout (loss of AC power supply) is one of the dominant accidents taken into consideration at performing accident analysis. In case of multiple failures of safety systems it leads to a severe accident. To prevent an accident to turn into a severe one or to mitigate the consequences, accident management measures must be performed. The present paper outlines possibilities for application and optimization of accident management measures following a station blackout accident. Assessed is the behaviour of the nuclear power plant during a station blackout accident without accident management measures and with application of primary/secondary side oriented accident management measures. Discussed are the possibilities for operators ' intervention and the influence of the performed accident management measures on the course of the accident. Special attention has been paid to the effectiveness of the passive feeding and physical phenomena having an influence on the system behaviour. The performed simulations show that the effectiveness of the secondary side feeding procedure can be limited due to an early evaporation or flashing effects in the feed water system. The analyzed cases show that the effectiveness of the accident management measures strongly depends on the initiation criteria applied for depressurization of the reactor coolant system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Idaho National Laboratory Cultural Resource Management Office FY 2011 Activity Report

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report is intended as a stand-alone document that summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2011. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders, serve as a planning tool for future INL cultural resource management work, and meet an agreed upon legal requirement.

99 GENERAL AND MISCELLANEOUS↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Idaho National Laboratory Radioactive Waste Management Complex Low-Level Waste at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Idaho National Laboratory (INL) Radioactive Waste Management Complex (RWMC) Low-Level Waste (INEL11006367N, Revision 4 [INL 2017]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the INL RWMC Low-Level Waste meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P performance objectives (DOE 1999). The INL RWMC Low-Level Waste is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the TRU Waste Processing Center Mixed Low Level Waste at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) Transuranic (TRU) Waste Processing Center Mixed Low Level Waste (MLLW), FWORCHMLLW103, Revision 13 [TWPC 2021]), is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the TRU Waste Processing Center MLLW meets all performance objectives of DOE Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The TRU Waste Processing Center MLLW waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Princeton Plasma Physics Laboratory Torus Cleanup System Molecular Sieve Dryer Bed at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Princeton Plasma Physics Laboratory (PPPL) Torus Cleanup System Molecular Sieve Dryer Bed (MSDB), PERM000000043, Revision 0 (Perma-Fix [PERM] 2021), is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the PPPL Torus Cleanup System MSDB meets all performance objectives of DOE Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The PPPL Torus Cleanup System MSDB waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNL Chronic Beryllium Disease Prevention Program (CBDPP): Implementation of 10 CFR 850, Revision 7

This document describes how Lawrence Livermore National Laboratory (LLNL) meets the requirements and management practices of federal regulation 10 CFR 850, 'Chronic Beryllium Disease Prevention Program (CBDPP).' This revision of the LLNL CBDPP incorporates clarification and editorial changes based on lessons learned from employee discussions, observations and reviews of Department of Energy (DOE) Complex and commercial industry beryllium (Be) safety programs. The information is used to strengthen beryllium safety practices at LLNL, particularly in the areas of: (1) Management of small parts and components; and (2) Communication of program status to employees. Future changes to LLNL beryllium activities and on-going operating experience will be incorporated into the program as described in Section S, 'Performance Feedback.'

99 GENERAL AND MISCELLANEOUS↗

2012 Emergency Response Capability BNA Compliance Assessment

This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2009 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document.

99 GENERAL AND MISCELLANEOUS↗

Emergency Response Capability Baseline Needs Assessment - Compliance Assessment

This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis on Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2016 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2016 BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. The 2013 BNA was approved by NNSA’s Livermore Field Office on January 22, 2014.

99 GENERAL AND MISCELLANEOUS↗

Sci-Fri AM: Quality, Safety, and Professional Issues 05: QC Program Management and the Benefits of QATrack+

Purpose: Treatment unit uptime statistics are typically used to monitor radiation equipment performance. The Ottawa Hospital Cancer Centre has introduced the use of Quality Control (QC) test success as a quality indicator for equipment performance and overall health of the equipment QC program. Methods: Implemented in 2012, QATrack+ is used to record and monitor over 1100 routine machine QC tests each month for 20 treatment and imaging units ( http://qatrackplus.com/ ). Using an SQL (structured query language) script, automated queries of the QATrack+ database are used to generate program metrics such as the number of QC tests executed and the percentage of tests passing, at tolerance or at action. These metrics are compared against machine uptime statistics already reported within the program. Results: Program metrics for 2015 show good correlation between pass rate of QC tests and uptime for a given machine. For the nine conventional linacs, the QC test success rate was consistently greater than 97%. The corresponding uptimes for these units are better than 98%. Machines that consistently show higher failure or tolerance rates in the QC tests have lower uptimes. This points to either poor machine performance requiring corrective action or to problems with the QC program. Conclusions: QATrack+ significantly improves the organization of QC data but can also aid in overall equipment management. Complimenting machine uptime statistics with QC test metrics provides a more complete picture of overall machine performance and can be used to identify areas of improvement in the machine service and QC programs.

60 APPLIED LIFE SCIENCES↗

Prediction and uncertainty quantification of shale well performance using multifidelity Monte Carlo

Uncertainty quantification is an integral component of reservoir management, especially considering the inherent uncertainty in subsurface systems. While a standard practice to estimate the uncertainty, Monte Carlo (MC) simulation is computationally intense when the sampling population comprises high-fidelity simulations. Alternatively, the Multi-fidelity Monte Carlo (MFMC) simulation overcomes this computational intensity by integrating low- and high-fidelity simulations. Our goal is to minimize the number of expensive high-fidelity simulations while maintaining accuracy and using numerous fast and cheap low-fidelity simulations to efficiently sample to input parameter space of interest. We selected gas production from unconventional wells to demonstrate the potential speedups and accuracy of the MFMC approach. The model fidelity usually determines the trade-off between accuracy and efficiency. While the high-fidelity model is more accurate, the low-fidelity model is more efficient. Our high-fidelity simulation includes reservoir simulations of a hydraulically fractured well. On the other hand, our low-fidelity model comprises the parallel-plate flow model. We used differential programming to efficiently solve the 1D flow model, where automatic differentiation is used to efficiently compute the gradients. We matched the production profile of high-fidelity simulations with our low-fidelity simulations. Then, we used a support vector regression to map the high- and low-fidelity input parameters. The mapping function is essential to tune the low-dimensional parameter space of the low-fidelity model to the high-dimensional parameter space of the high-fidelity model. We found that we can use a combination of 9 high fidelity and 10,000 low fidelity simulations to efficiently and accurately simulate pressure management. This method is at least two orders of magnitude faster than only using high-fidelity simulations. Finally, from a broader perspective, MFMC could efficiently estimate the uncertainty of various systems and models, integrating low- and high-fidelity models.

04 OIL SHALES AND TAR SANDS↗

Evaluating Behaviorally Oriented Aviation Maintenance Resource Management (MRM) Training and Programs: Methods, Results, and Conclusions

Assessment of the impact of Aviation Resource Management Programs on aviation culture and performance has compelled a considerable body of research (Taylor & Robertson, 1995; Taylor, 1998; Taylor & Patankar, 2001). In recent years new methods have been applied to the problem of maintenance error precipitated by factors such as the need for self-assessment of communication and trust. The present study - 2002 -- is an extension of that past work. This research project was designed as the conclusion of a larger effort to help understand, evaluate and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2002, three issues were addressed. First, the evaluation of two (independent & different) MRM programs for changing behaviors was undertaken. In one case we were able to further apply the approach to measuring written communication developed during 2001 (Taylor, 2002; Taylor & Thomas, 2003). Second, the MRM/TOQ surveys were made available for completion on the internet. The responses from these on-line surveys were automatically linked to a results calculator (like the one developed and described in Taylor, 2002) to aid industry users in analyzing and evaluating their local survey data on the internet. Third, the main trends and themes from our research about MRM programs over the past dozen years were reviewed.

Taylor, James C.↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Different Perspectives on Asthenia in Astronauts and Cosmonauts: International Research Literature

The Behavioral Health and Performance (BHP) Element is one of the six elements within the NASA Human Research Program (HRP) and is responsible for managing four risks: a) The Risk of Performance Decrements due to inadequate Cooperation, Coordination, Communication and Psychological Adaptation within a Team (Team), b) the Risk of Performance Errors due to Sleep Loss, Circadian De-synchronization, Fatigue and Work Overload (Sleep), c) Risk of Behavioral Conditions (BMed), and d) the Risk of Psychiatric Disorders (BMed). The aim of this report is to address some of the recommendations made by the recent NASA HRP Standing Review Panel for the Behavioral Medicine Risk of Psychiatric Disorders. Such recommendations included: a) the inclusion of important national and international literature in English and non-English language materials; including journals, books, magazines, conference reports and b) an extensive literature review of certain types of psychological states to predict, detect, and assess adverse mental states that may negatively affect the psychological well being of the astronauts, specifically asthenia. This report was a collaborative international work effort focused on the evaluation and determination of the importance of continuing research on asthenia as a possible psychological problem that might affect the optimal psychological functioning among crewmembers during long-duration space flight missions. Russian medical personnel (flight surgeons and psychologist) have observed symptoms of asthenia (weakness, increased fatigue, irritability, and attention and memory disorders) in cosmonauts after four months in space (Myasnikov& Zamaleddinov1996; Grigorieve, 1996 ) and believe that asthenia is one of the greater risks that will affect crews? optimal psychological functioning.

Sandoval, Luis↗

Behavior-Based Budget Management Using Predictive Analytics

Historically, the mechanisms to perform forecasting have primarily used two common factors as a basis for future predictions: time and money. While time and money are very important aspects of determining future budgetary spend patterns, organizations represent a complex system of unique individuals with a myriad of associated behaviors and all of these behaviors have bearing on how budget is utilized. When looking to forecasted budgets, it becomes a guessing game about how budget managers will behave under a given set of conditions. This becomes relatively messy when human nature is introduced, as different managers will react very differently under similar circumstances. While one manager becomes ultra conservative during periods of financial austerity, another might be un-phased and continue to spend as they have in the past. Both might revert into a state of budgetary protectionism masking what is truly happening at a budget holder level, in order to keep as much budget and influence as possible while at the same time sacrificing the greater good of the organization. To more accurately predict future outcomes, the models should consider both time and money and other behavioral patterns that have been observed across the organization. The field of predictive analytics is poised to provide the tools and methodologies needed for organizations to do just this: capture and leverage behaviors of the past to predict the future.

99 GENERAL AND MISCELLANEOUS↗

An Exploration of Mercury Soils Treatment Technologies for the Y-12 Plant - 13217

There are a number of areas at the Y-12 National Security Complex (Y-12) that have been contaminated with mercury due to historical mercury use and storage. Remediation of these areas is expected to generate large volumes of waste that are Resource Conservation and Recovery Act (RCRA) characteristically hazardous. These soils will require treatment to meet RCRA Land Disposal Restrictions (LDR) prior to disposal. URS - CH2M Oak Ridge LLC (UCOR) performed a feasibility assessment to evaluate on-site and off-site options for the treatment and disposal of mercury-contaminated soil from the Y-12 Site. The focus of the feasibility assessment was on treatment for disposal at the Environmental Management Waste Management Facility (EMWMF) located on the Oak Ridge Reservation. A two-phase approach was used in the evaluation process of treatment technologies. Phase 1 involved the selection of three vendors to perform treatability studies using their stabilization treatment technology on actual Y-12 soil. Phase II involved a team of waste management specialists performing an in-depth literature review of all available treatment technologies for treating mercury contaminated soil using the following evaluation criteria: effectiveness, feasibility of implementation, and cost. The result of the treatability study and the literature review revealed several viable on-site and off-site treatment options. This paper presents the methodology used by the team in the evaluation of technologies especially as related to EMWMF waste acceptance criteria, the results of the physical treatability studies, and a regulatory analysis for obtaining regulator approval for the treatment/disposal at the EMWMF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory Resources and Techniques to Evaluate Smart Home Technology: Preprint

Smart home technologies promise to make residential buildings more comfortable, less costly to operate, more energy efficient, and more integrated with the grid, but these systems are difficult to evaluate in traditional laboratory spaces. To aid in the development and evaluation of new home energy management systems (HEMS), NREL built the Systems Performance Laboratory (SPL) within the Energy Systems Integration Facility. SPL has electrical infrastructure for three residential buildings, complete with smart meters, breaker panels and a full complement of major and minor appliances in each 'home.' Cord and plug power connections mean that appliances can easily be swapped for different models. Distributed energy resources (DER), such as residential photovoltaic (PV) inverters and home batteries, are also available for integration. Sensors monitor the power consumption of all loads and controllers can simulate occupancy to drive the appliances in realistic ways. A novel hardware-in-the-loop application was developed to ensure air conditioner cycling by combining a building simulation with a physical air conditioner and a thermostat, which allows us to simulate performance in any climate with any building construction. Another application of the hardware-in-the-loop technique uses a grid simulation to model the grid impact for different control strategies related to smart home technologies. This laboratory is a powerful, flexible tool that can be employed to evaluate the effect that home energy management and other smart home technologies will have at the appliance, whole-home, and distribution feeder levels - all of which are important perspectives for different stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Tuner Selection for Kalman-Filter-Based Aircraft Engine Performance Estimation

An emerging approach in the field of aircraft engine controls and system health management is the inclusion of real-time, onboard models for the inflight estimation of engine performance variations. This technology, typically based on Kalman-filter concepts, enables the estimation of unmeasured engine performance parameters that can be directly utilized by controls, prognostics, and health-management applications. A challenge that complicates this practice is the fact that an aircraft engine s performance is affected by its level of degradation, generally described in terms of unmeasurable health parameters such as efficiencies and flow capacities related to each major engine module. Through Kalman-filter-based estimation techniques, the level of engine performance degradation can be estimated, given that there are at least as many sensors as health parameters to be estimated. However, in an aircraft engine, the number of sensors available is typically less than the number of health parameters, presenting an under-determined estimation problem. A common approach to address this shortcoming is to estimate a subset of the health parameters, referred to as model tuning parameters. The problem/objective is to optimally select the model tuning parameters to minimize Kalman-filterbased estimation error. A tuner selection technique has been developed that specifically addresses the under-determined estimation problem, where there are more unknown parameters than available sensor measurements. A systematic approach is applied to produce a model tuning parameter vector of appropriate dimension to enable estimation by a Kalman filter, while minimizing the estimation error in the parameters of interest. Tuning parameter selection is performed using a multi-variable iterative search routine that seeks to minimize the theoretical mean-squared estimation error of the Kalman filter. This approach can significantly reduce the error in onboard aircraft engine parameter estimation applications such as model-based diagnostic, controls, and life usage calculations. The advantage of the innovation is the significant reduction in estimation errors that it can provide relative to the conventional approach of selecting a subset of health parameters to serve as the model tuning parameter vector. Because this technique needs only to be performed during the system design process, it places no additional computation burden on the onboard Kalman filter implementation. The technique has been developed for aircraft engine onboard estimation applications, as this application typically presents an under-determined estimation problem. However, this generic technique could be applied to other industries using gas turbine engine technology.

Simon, Donald L.↗

Refine your search to explore more results.