Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “minimum”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Tank 49H Solids Disturbance Analysis

Tank 49H will serve as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1,200 mg/L from the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls into Tank 49H through a downcomer and passes through the supernate could potentially disturb the solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. A previous analysis and report evaluated the potential to disturb solids when transferring into Tank 49H through the B4 riser and recommended a minimum tank level of 120 inches to prevent disturbing any solids in the bottom of the tank. The scope of this task is to perform additional fluid flow analysis to determine the impact of a “plunging jet” through the C3 downcomer on solids in Tank 49H and to determine a minimum liquid level to be maintained in Tank 49H prior to transfers that will minimize disturbing the solids and exceeding the SWPF WAC limits for insoluble solids carryover to SWPF since the C3 riser downcomer is at a lower elevation and farther away from the B5 transfer pump than the B4 downcomer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose Rate Analysis of the WCS Consolidated Interim Storage Facility

This report describes a confirmatory calculation for a proposed consolidated interim storage facility (CISF) to support the US Nuclear Regulatory Commission’s review of the license application submitted by the Interim Storage Partners. The scope of this report is limited to an assessment of the annual dose from direct radiation associated with Phase 1 of the Waste Control Specialists (WCS) CISF and the determination of the minimum controlled area boundary based on the 10 CFR 72.104 limit of 25 mrem annual dose to the whole body. The confirmatory dose rate calculations used the source term and shielding calculation capabilities of the SCALE 6.2.3 computer code system. The calculation method employed in the confirmatory calculations uses a detailed Monte Carlo radiation transport simulation from source to dose rate. This method differs from the two-step method used in the safety analysis report (SAR), which requires determination of the photon and neutron energy and angular distributions on the cask external surface and then the use of this surface source in a new radiation transport calculation to determine dose rate as a function of distance from the storage facility. A simulation was made using the complete site geometry (all casks present) but with only one cask containing source, and a total of 467 independent calculations were performed to obtain the dose rate maps produced by each storage cask. Basic input data and assumptions used in the SAR (e.g., cask design parameters and design basis assembly characteristics) were used in this confirmatory calculation for consistency with the SAR. Local atmospheric conditions for skyshine calculations were simulated using US standard atmosphere data, which describe average air temperature, pressure, and density as a function of altitude. The determined minimum required distances from the WCS Phase 1 CISF to a contour defined by the 25 mrem annual dose limit were approximately 623 m (0.387 miles) in the N-NE direction, 594 m (0.369 miles) in the SSW direction, and 533 m (0.331 miles) in the E-SE direction and the W-NW direction. The annual dose results of the confirmatory calculation are in relatively good agreement with the annual dose values presented in the WCS SAR. The annual dose produced by the Phase 1 CISF at the nearest site boundary, 0.75 miles away from the CISF, was estimated by this study to be approximately 6.02E-02 ± 2.0E-04 mrem, which is significantly smaller than the 25 mrem annual dose limit provided in 10 CFR 72.104. The SAR annual dose rate value for the nearest site boundary was 7.52E-2 mrem, which included 7.73E-03 mrem due to postulated leakage of the FO-, FC-, and FF-canisters. A comparison with the dose rate values reported in the SAR for 16 detector locations, D1 through D16, on the protected area boundary is also included in this report. This comparison shows that the SAR determined higher annual dose values for detectors D1 through D14 by 12% to 45% and lower annual dose values for detectors D15 and D16 by 18% and 8%, respectively, as compared with this ORNL confirmatory calculation. Sensitivity studies have been performed to support a comprehensive review of the application. In these studies, the effects on dose rate of the modeled air volume, density, and humidity were analyzed. The sensitivity calculations showed that the air volume used in the Monte Carlo simulations was adequate and that a larger air volume would not further increase the dose rate due to skyshine contributions. The sensitivity analysis showed that simulation of local atmospheric conditions is important for the accuracy of dose rate estimates at large distances from the facility. Air humidity was demonstrated to have negligible effects on dose rate values for the simulated local atmospheric conditions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Welding of Haynes 282 to Steels to Enable Modular Rotors for Advanced Ultra Super-Critical Steam Turbines

Steam turbines for an Advanced Ultra Super Critical (AUSC) fossil fired power plant will operate at temperatures well above those of current commercial steam cycles with inlet temperatures more than 760 C , which is beyond the capabilities of alloy steels presently used for steam turbine applications and requires advanced materials. Large components such as steam turbine rotors may be made of nickel based super alloys such as Haynes 282 (H282). However, monolithic forgings of superalloys in the sizes required for large steam turbines rotors can be prohibitively expensive besides many technical challenges. To minimize cost and alleviate the related technical challenges, superalloy use needs to be limited to locations on the steam turbine rotor where strength and temperature requirements cannot be met by conventional steels. This is possible if nickel-based superalloys can be successfully welded to steels and the related technical challenges - machining parts made of dissimilar welded materials, non-destructive examination of such welds for flaw detection; and, material properties of such hybrid components – are sufficiently addressed. In this technology development project, we successfully welded H282 to plates up to ~ 75 mm (~ 3 inches) to a 3.5NiCrMoV steel of similar thickness. Advanced ultrasonic inspection technique called Phased Array Ultrasonic Testing (PAUT) was employed to examine the dissimilar H282-Steel welds, into which flat bottomed side drilled holes (SDH) of various diameters were introduced, to determine the minimum detectable feature sizes; it was shown that with PAUT SDH of dia. down to 0.5 mm could be detected in the base alloys and SDH with dia. down to 2.4 mm could be detected in the weld metal under multiple orientations successfully. An autonomous machining process monitoring system was developed and demonstrated whereby the forces acting on the cutting tool could be actively monitored as the cutting tool transitioned from H282 to Steel across the weld using which the machining parameters can be potentially altered without interruption to extend tool life. This project successfully achieved its objectives of - i. Developing a welding methodology and viable welding geometries, to successfully join H282 to steel 3.5CrMoNiV steel to enable manufacture of modular steam turbine rotors for AUSC applications (conditions of at least 760 °Celsius and 3,100 psia (pounds per square inch absolute pressure) and evaluate the material properties of the welded specimen. ii. Employ the advanced ultrasonic inspection technique to the dissimilar weld metal joint and determine the minimum detectable feature sizes. iii. Develop effective machining techniques to machine such hybrid structures with online tool force monitoring and effect machine state metrics for optimal results.

20 FOSSIL-FUELED POWER PLANTS↗

Earth Source Heat: A Cascaded Systems Approach to DDU of Geothermal Energy on the Cornell Campus

This report documents the completion of the DOE study DE-EE0008103: Earth Source Heat: A Cascaded Systems Approach to DDU of Geothermal Energy on the Cornell Campus. This study involved a comprehensive evaluation of the potential for Earth Source Heat (ESH), Cornell’s specific application of Deep Direct Use (DDU) geothermal energy, to create a viable renewable source of thermal energy for its Ithaca, NY campus district heating system. The study included stochastic modeling that married each of two potential subsurface resources (two specific geological reservoirs) to documented campus heating operations based on hourly campus heating profiles and proposed integrated equipment controls (variable speed pumps and heat pumps). The outputs of the subsurface modeling were used as inputs for a Cornell-developed surface heat use Excel-based modeling program (the program was named “Modeled ENergy Use”, or “MEnU”). This allowed Cornell to compute realistic annual totals of extractable and useable heat for the campus, including details like heat losses, minimum summer demand, and controllable building temperature settings. The Cornell team then evaluated the costs and benefits of each modeled scenario. The primary evaluation was a standard “single bottom line” economic calculation for the Levelized Cost of Heat (LCOH). This represents the annualized cost (per unit heat) for Cornell. Additional valuations were also computed based on the benefit to the environment and to the regional economy (i.e., economic benefits external to campus). The results of this study demonstrate that if suitable reservoir flow can be attained, Earth Source Heat would be a viable technology to supply Cornell’s district heating system. This viability is based on the following criteria: (1) The modeled system produced a total useable heat output that exceeded the minimum annual campus heat load determined at the onset of the project (i.e., offsetting at least 20% of the annual campus thermal load). The output range is substantial depending on both the subsurface resource and the surface applications; at the high end, our modeled solutions produced up to ~70% of existing campus heat load with a single well pair producing 70 kg/s with integrated high-temperature heat pumps, and (2) Modeling demonstrated that multiple geothermal reservoirs could provide economically viable results when heat pumps were strategically integrated, a design that has been proven in at least one European installation already. In this context, “economically viable” means that the LCOH for the project is less than the regional commercial price of heat that would be generated using natural gas (the most common and cheapest fossil alternative in our area). Based on a single-bottom-line (LCOH) valuation, our results show that economic success is likely for any reservoir deeper than about 2.25 km where a sufficient permeability exists (or can be created with stimulation or similar engineering enhancement) and reasonable production temperatures sustained over time. The LCOH values of $\$ 4.77$ to $\$ 6.46$ per MMBtu are all lower than the comparable cost of providing heat energy with a natural gas boiler for a facility in the Northeast U.S. that obtains natural gas at commercial rates (Commercial heat costs would include at least $\$ 9.41$ in fuel costs, representing total boiler/transfer efficiency of 85% using gas at $\$ 8.00$ per MMBtu; LCOH would be higher if capital equipment and other operating costs were included). In addition to LCOH, Cornell’s scope also included evaluation of the Environmental value and Regional Economic value of each scenario. When considering the environmental and regional economic value of such a project, the overall “triple bottom line” cost (i.e., the LCOH less the LCOH ENV and LCOH REG values) is even lower and in some cases negative; i.e., in some cases a project achieving the listed performance would have higher value to the environment and to the regional economy than the total project costs over the 30-year project timeframe.

15 GEOTHERMAL ENERGY↗

Tank 49H solids disturbance analysis

Tank 49H serves as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb any solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1,200 mg/L of the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls into Tank 49H through a downcomer could potentially disturb any solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. A previous analysis and report evaluated the potential to disturb solids when transferring into Tank 49H through the B4 riser and recommended a minimum tank level of 120 inches to prevent disturbing any solids in the bottom of the tank. The scope of this task is to perform additional fluid flow analysis to determine whether accounting for disturbed particle settling and particle mixing and dispersion during transfer could allow the minimum liquid level to be reduced below 120 inches. The analysis utilized models from the technical literature to calculate the size and shape of the “plunging jet” as a function of input parameters such as initial velocity, initial jet diameter, elevation of the initial jet, liquid level in the tank, and solids depth. The analysis relied on the M-Star® simulations performed for the previous analysis to provide bounding estimates of the amount of solid particles disturbed and used the MStar® software to calculate the dispersion and mixing of the disturbed solids with other liquid in the tank as the solids are transported to the transfer pump. The analysis showed that with a solid particle size of 5 micron or less, a liquid level of 120 inches should be maintained to prevent significant disturbance of the solid layer at the bottom of Tank 49H.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrospective Analysis of Backwater Habitat Availability Using Remote Sensing

Low-velocity channel-margin habitats serve as important nursery habitats for the endangered Colorado pikeminnow (Ptychocheilus lucius) in the middle Green River between Jensen and Ouray, Utah. These habitats, known as backwaters, are associated with emergent sandbars, and are shaped and reformed annually by peak flows. Our recent knowledge about backwater characteristics and dynamics that is summarized in the synthesis report (Grippo et al. 2015) was based on detailed annual survey data from a relatively small sample of backwaters that were collected from 2003 to 2014 and reach-wide evaluations of backwater surface area based on manual interpretation of aerial and satellite imagery. Methods that bridge the gap between the detailed surveys from a small number of backwaters and the reach-wide assessment of their surface area would enable an assessment of the availability of backwater habitats that meet the minimum depth requirements for suitable habitat for Colorado pikeminnow. In 2015 Argonne National Laboratory (Argonne) tested three regression models—linear, multiple, and partial least square (PLS) regression models—for estimating backwater depth using National Agriculture Imagery Program (NAIP) imagery collected in July 2006 that covered the Jensen-Ouray reach of the Green River (Hamada and LaGory 2016). The results suggested that a PLS regression model showed high correlation with the reference depth (R 2 = 0.69) and had the most unbiased and consistent estimate of backwater depth. The results also indicated that the PLS model would provide reasonable estimates of the amount of habitat providing a minimum suitable depth of 30 cm for young-of-the-year Colorado pikeminnow, even though absolute depth estimates may be uncertain for backwater areas deeper than approximately 40 cm. The study also provided insights regarding the amount and the selection of calibration and validation (cal-val) data needed for improving the accuracy of depth prediction.

54 ENVIRONMENTAL SCIENCES↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Puerto Rico Historical Climate Analysis: A closer look at complex tropical terrain

Small tropical islands like Puerto Rico are especially vulnerable to climate change impacts, yet are often underrepresented in most datasets because the spatial resolution is too coarse to sufficiently cover their complex terrain. This study was done to better understand how the climate has changed in the various regions of Puerto Rico, which will support a transition to renewable energy and aid in projecting future climate impacts on the residents and land they live on. This study used multiple datasets including Daymet, a daily surface weather and climatological summary; European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5); and station observations. The climate variables examined here include minimum and maximum near-surface air temperature, daily precipitation, incident shortwave radiation, and large-scale upper atmosphere conditions. The time periods cover the years 1950–2019. Results in both Daymet and station observations show long-term warming trends throughout every season. In particular, the minimum winter temperatures increased the most compared with maximum and mean air temperature. Northeast Puerto Rico, where the majority of the island’s population is located, experienced the largest warming. Summertime precipitation has decreased over time, and spring and fall precipitation has increased. The largest increase in fall is because there has been more available precipitable water, lower sea-level pressure, and favorable cyclonic circulations from the trade winds over the past seven decades. Overall, wet days are getting wetter, while dry days are getting drier. While there are good solar energy potential, we see a long-term decreasing trend in shortwave radiation over time in all seasons across entire island, possibly due to the increase of cloud cover.

54 ENVIRONMENTAL SCIENCES↗

Algal Biomass Conversion to Fuels via Combined Algae Processing (CAP): 2022 State of Technology and Future Research

The annual State of Technology (SOT) assessment is an essential activity for platform research conducted under the Bioenergy Technologies Office (BETO). It allows for the impact of research progress (both directly achieved in-house at NREL and furnished by partner organizations) to be quantified in terms of economic improvements in the overall biofuel production process for a particular biomass processing pathway, whether based on terrestrial or algal biomass feedstocks. As such, initial benchmarks can be established for currently demonstrated performance, and progress can be tracked toward out-year goals to ultimately demonstrate economically viable biofuel technologies. NREL's algae SOT benchmarking efforts focus both on front-end algal biomass production and separately on back-end conversion to fuels through NREL's "combined algae processing" (CAP) pathway. The production model is based on outdoor long-term cultivation data, enabled by comprehensive algal biomass production trials conducted under Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) consortium efforts and driven by data furnished by Arizona State University's (ASU's) Arizona Center for Algae Technology and Innovation (AzCATI) test bed site. The CAP model is primarily based on experimental efforts conducted under NREL research and development projects, with some process parameters provided by partner organizations. Assumptions regarding the wet storage of algae use data provided by Idaho National Laboratory (INL), while parts of the polyurethane production process leverage BETO-funded research from collaborators at Algenesis and the University of California, San Diego (UCSD). This report focuses on back-end conversion of algal biomass through the CAP pathway, highlighting the 2022 updates to minimum fuel selling price (MFSP). This update incorporates improvements to fermentation performance for two biological pathways through carboxylic acid and 2,3-butanediol (BDO) intermediates, as demonstrated through parallel research on the biochemical conversion of corn stover. Improvements are applied to the glucose fraction of the biomass only, while parameters regarding the conversion of the mannose fraction (not a significant component in corn stover) are maintained consistently with prior CAP SOTs. Additional parameters are also updated to reflect the most current understanding of each pathway, including an increase in the catalyst loading requirement in the ketonization step of the acids pathway and a decrease in the fermentation productivity in the BDO pathway. Additionally, the biomass feedstock costs (minimum biomass selling price [MBSP]), yields, and seasonal variability from the upstream cultivation SOT model were also incorporated into downstream Aspen Plus CAP models.

09 BIOMASS FUELS↗

Automated novel molecule structure determination for discovering pathways critical to soil microbiomes at the terrestrial-aquatic interface – 6 month project report

This 6-month $75k project focused on delivering the Foundational aim and initiating work for Aim 1, detailed below. The Foundational Aim lays the groundwork to complete Aims 1-3, which are anticipate to be funded fully under a future project. Aim 1: Build and validate deep learning tool for automated NMR structure elucidation; Aim 2: Apply approach to find novel molecules and pathways in SPRUCE soil samples; 3:Refine approach to find the minimum set and minimum quality of NMR experiments required.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

HTV Post Irradiation Examination (PIE) Results and Analysis

This report is responsive to 2017 Idaho National Laboratory (INL) Memorandum Purchase Order No. 00181805, statement of work 13687 “HTR Graphite R&D – FY ORNL 2017 MPO”, Deliverable 12A “issue final report on the HTV PIE to INL”, due June 15 th 2017.The HTV (High Temperature Vessel) was a HFIR (High Flux Isotope Reactor) high temperature target rod capsule in support of the DOE’s (Department of Energy) High Temperature Reactor (HTR) program. The HTV capsule contained eight sub-capsules, each with nine graphite specimens. The sub-capsules were designed to operate at ~900°C, ~1200°C or ~1600°C. The actual irradiation temperature was established by interrogating SiC and graphite TMs during PIE (post-irradiation examination. The capsule dose ranged from 1.49 dpa to 3.34 dpa, and varied with specimen position within the capsule the maximum dose occurring at the reactor mid-plane and the minimum dose occurring at the core periphery. The irradiated graphite specimens were examined during PIE to establish their high temperature dimensional and elastic (Young’s) modulus changes. The PIE results are reported and analyzed here. The dimensional and modulus changes were shown to have a strong thermal dependence. The dimensional changes were small, being of the order of a few percent or less, ranging from a maximum shrinkage of -3.1% (PCEA WG, T irr =1500°C at 3.3 dpa) to +0.131% (2114 AG, T irr = 869 at 3.2 dpa). The specimen volume shrinkages varied from –0.81 (2114, T irr = 840 at 3.1 dpa) to -9.15% (PCEA, T irr =1500°C at 3.3 dpa). The volume changes were larger at higher Irradiation temperatures. Of the six grades examined, only 2114 moved into the net positive dimensional swelling situation. Significantly, the volume change for 2114 remained negative at the doses and temperature tested here. Dimensional and volume changes were explained in terms of the temperature dependence of the crystal growth rate, the anisotropy of the crystal growth (crystallographic c-axis growth and crystallographic a-direction shrinkage) and the thermal closure of aligned micro-porosity. The modulus changes were much larger, being of the order of a few tens of percent. A trend of lesser fractional increases of Young’s Modulus with an increasing T irr was noted. The minimum increase in Young’s Modulus was 20% (H-451 WG, T irr =1500°C at 3.3 dpa) and the maximum 71% (IG-110, T irr = 840(actual) at 3.3 dpa). The rise in Young’s modulus is attributed to dislocation pinning by lattice defects produced by neutron irradiation and the temperature dependency is related to the irradiation temperature influence on the number of defect available to pin dislocations.

36 MATERIALS SCIENCE↗

Brightness for Current NSLS-II In-Vacuum Undulator Technology in Different Lattice Scenarios

In this note the peak and effective magnetic field for In-Vacuum Undulators at NSLS-II is characterized by the well-known Halbach formula. This gives a reasonably good approximation of an IVU of any period and any magnetic gap within the range currently used at NSLS-II (≥ 18mm). This parameterization is then used in conjunction with known stay-clear requirements from the ring aperture definition as well as an absolute minimum of 4.5mm to calculate the maximum achievable brightness at any photon energy by scanning the parameters of period, gap, and length. This maximum achievable brightness is calculated for both devices centered at the lattice center as well as in a center-split configuration for the long and short straight sections of NSLS-II. In addition results are shown for a hypothetical single and center-split long straight section where the horizontal and vertical beta functions for a long straight have been modified to match at 2.5m. These are compared to a hypothetical canted double min-β configuration using the long straight section where the vertical beta function minimum is 1.6m and the horizontal as low as 3.2m. The latter case may provide significant benefit for medium and high photon energy beamlines seeking high brightness.

43 PARTICLE ACCELERATORS↗

Specification of EBR-II Fabricated Fuel Diameter Data

All IFR EBR-II fuel pins were fabricated at one of the related fuel fabrication facilities at Argonne National Laboratory-West, at the EBR-II site [1]. U-Pu-Zr experimental pins were fabricated at the Experimental Fuels Laboratory (EFL), which was established in April of 1984 after the positive acceptance of the IFR concept, while the U-Zr experimental pins were fabricated at the Fuel Manufacturing Facility (FMF), along with the driver fuel pins [2]. The injection-casting fabrication process is described in detail in ref [1]. All the fuel pins that were loaded into EBR-II were examined after fabrication to ensure that they met the design dimensional requirements and tolerances prior to assembly. Fuel slug diameter was measured with either a laser profilometer (at FMF) or a hand micrometer (at EFL), at a minimum of 1-inch intervals over the length of the fuel slug, as shown in Figure 1 [2]. In all cases the average fuel diameter is reported, in some cases with additional summary statistics (e.g., minimum, maximum), and in rare cases the complete record of axially-varying fuel diameters is available. It should be noted that in cases where axial varying data is available, in general the orientation of the slug was not recorded or carried over to loading of the pin, so a diameter measurement at the bottom of the fabricated slug does not necessarily correspond to the bottom of the loaded slug, as it may have been loaded in either orientation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sum-of-Fractions Methodology for Actinides in Water- and Polyethylene-Moderated and -Reflected Systems

Sum-of-fractions is a method intended to make sure a subcritical margin for aqueous solutions and slurries of fissionable isotopes exists. The method indicates that a system is subcritical if the sum of the ratios of the mass of each isotope (in a mixture) to its individual minimum subcritical mass limit is less than or equal to one. Historically, the basis of the sum-of-fractions has been derived from allowances given in the American National Standards Institute (ANSI)/ American Nuclear Society (ANS)-8.15-1981. However, the allowance was removed in ANSI/ANS-8.15-2014 due to a lack of technical basis. A methodology was developed to assess the validity of using the sum-of-fractions for water- or polyethylene-moderated systems for the following nuclides: 232 U, 233 U, 234 U, 235 U, 237 Np, 236 Pu, 238 Pu, 239 Pu, 240 Pu, 241 Pu, 242 Pu, 241 Am, 242 m Am, 243 Am, 242 Cm, 243 Cm, 244 Cm, 245 Cm, 246 Cm, 247 Cm, 249 Cf, and 251 Cf. The methodology uses available benchmark data for mixtures of 233 U, 235 U, and 239 Pu to establish the calculational margin, and a mass limit reduction to establish the margin of subcriticality. Water- or polyethylene-moderated and -reflected mixtures containing the nuclides are evaluated with the code system, SCALE 6.2.4. Including the calculational margin, subcritical mass limits for each nuclide were computed for optimally water- or polyethylene-moderated and fully reflected systems. These masses were used to create nuclide mixtures in which the sum of the mass to subcritical mass limit ratios is one. The various nuclide mixtures were modeled over a range of moderation and demonstrate the keff does not exceed the calculational margin. For additional assurance of subcriticality, a significant mass reduction is applied to each computed minimum critical mass of the nuclides without adequate benchmark data consistent with the method in ANSI/ANS-8.15-2014.

07 ISOTOPE AND RADIATION SOURCES↗

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

Pedestrian-Involved Traffic Signal Optimization Using Decentralized Graph-based Multi-Agent Reinforcement Learning

Incorporating pedestrian movements in traffic signal timing optimization is essential for ensuring smooth and safe urban transportation systems. To develop an effective signal timing plan, it is crucial to comprehend how various pedestrian accommodation strategies impact both vehicle and pedestrian flow. This study explores the application of the Decentralized Graph-based Multi-Agent Reinforcement Learning (DGMARL) method for signal timing optimization. It considers both pedestrian and vehicle traffic state and assesses the effects of fixed and adaptive pedestrian request response on traffic and signal timing. The evaluation of DGMARL encompasses vehicles Eco_PI which is fuel consumption impact related to vehicle stops and stop delay, and pedestrian waiting time to ensure overall system efficiency. The proposed approach was evaluated using a Digital Twin microscopic traffic simulation model of MLK Smart Corridor in Chattanooga, Tennessee. The evaluation outcomes of vehicles Eco_PI, pedestrian waiting time and serving time are compared with the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall to determine the most suitable approaches for various traffic conditions. The results indicated that, on average, the strategy of Signal timing optimization with adaptive pedestrian request response improved the Eco_PI by 32.43%, and Signal timing optimization with both automated pedestrian traffic demand and adaptive pedestrian request response improved the Eco_PI by 31.62% compared to the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall.

K Kumarasamy, Vijayalakshmi↗

Refine your search to explore more results.