Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “depth”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

A distributed temperature profiling system for vertically and laterally dense acquisition of soil and snow temperature

Abstract. Measuring soil and snow temperature with high vertical and lateral resolution is critical for advancing the predictive understanding of thermal and hydro-biogeochemical processes that govern the behavior of environmental systems. Vertically resolved soil temperature measurements enable the estimation of soil thermal regimes, frozen-/thawed-layer thickness, thermal parameters, and heat and/or water fluxes. Similarly, they can be used to capture the snow depth and the snowpack thermal parameters and fluxes. However, these measurements are challenging to acquire using conventional approaches due to their total cost, their limited vertical resolution, and their large installation footprint. This study presents the development and validation of a novel distributed temperature profiling (DTP) system that addresses these challenges. The system leverages digital temperature sensors to provide unprecedented, finely resolved depth profiles of temperature measurements with flexibility in system geometry and vertical resolution. The integrated miniaturized logger enables automated data acquisition, management, and wireless transfer. A novel calibration approach adapted to the DTP system confirms the factory-assured sensor accuracy of ±0.1 ∘C and enables improving it to ±0.015 ∘C. Numerical experiments indicate that, under normal environmental conditions, an additional error of 0.01 % in amplitude and 70 s time delay in amplitude for a diurnal period can be expected, owing to the DTP housing. We demonstrate the DTP systems capability at two field sites, one focused on understanding how snow dynamics influence mountainous water resources and the other focused on understanding how soil properties influence carbon cycling. Results indicate that the DTP system reliably captures the dynamics in snow depth and soil freezing and thawing depth, enabling advances in understanding the intensity and timing in surface processes and their impact on subsurface thermohydrological regimes. Overall, the DTP system fulfills the needs for data accuracy, minimal power consumption, and low total cost, enabling advances in the multiscale understanding of various cryospheric and hydro-biogeochemical processes.

54 ENVIRONMENTAL SCIENCES↗

Surface Meteorology, Barrow, Alaska, Area A, B, C and D, Ongoing from 2012

Meteorological data are being collected at several points within four intensive study areas in Barrow. These data assist in the calculation of the energy balance at the land surface and are also useful as inputs into modeling activities. (https://doi.org/10.5440/1164893). Measurements at AREA A (all heights listed are relative to the land surface): Location of the Site A station: N71* 16.888', W156* 36.647' * Air temperature at three heights: 1.4 meters, 2.0 meters, 3.5 meters * Relative Humidity / Dew Point at two heights: 1.4 meters, 3.5 meters * Wind Speed at two heights: 1.3 meters, 3.5 meters * 4 Component Net Radiation @ 1.2 meters ** Upwelling & Downwelling Shortwave Radiation ** Upwelling & Downwelling Longwave Radiation * Summer Precipitation Site A is located on polygonal permafrost and co-located with continuous snow depth measurements and subsurface measurements. Measurements at AREA B (all heights listed are relative to the land surface): Location of the Site B station: N71* 16.785', W156* 36.211' * Air temperature at three heights: 1.4 meters, 2.0 meters, 3.5 meters * Relative Humidity / Dew Point at two heights: 1.4 meters, 3.5 meters * Wind Speed at two heights: 1.3 meters, 3.5 meters * 4 Component Net Radiation @ 1.2 meters ** Upwelling & Downwelling Shortwave Radiation ** Upwelling & Downwelling Longwave Radiation * Summer Precipitation Site B is located on polygonal permafrost and co-located with continuous snow depth measurements and subsurface measurements. ------------------------------------------------- Measurements at AREA C (all heights listed are relative to the land surface): Location of the Site C station: N71* 16.804', W156* 36.072' * Air temperature at three heights: 1.4 meters, 2.0 meters, 3.5 meters * Relative Humidity / Dew Point at two heights: 1.4 meters, 3.5 meters * Wind Speed at two heights: 1.3 meters, 3.5 meters * 4 Component Net Radiation @ 1.2 meters ** Upwelling & Downwelling Shortwave Radiation ** Upwelling & Downwelling Longwave Radiation * Summer Precipitation * Barometric Pressure Site C is located on polygonal permafrost and co-located with continuous snow depth measurements and subsurface measurements. ------------------------------------------------- Measurements at AREA D (all heights listed are relative to the land surface): Location of the Site D station: N71* 16.927', W156* 36.036' * Air temperature at one height: 1.2 meters * Relative Humidity / Dew Point at one height: 1.2 * Wind Speed at one height: 1.2 meters * 4 Component Net Radiation @ 1.0 meters ** Upwelling & Downwelling Shortwave Radiation ** Upwelling & Downwelling Longwave Radiation Site D is located on polygonal permafrost and co-located with continuous snow depth measurements and subsurface measurements. Data are in ASCII files, with columns separated by commas: ','

54 ENVIRONMENTAL SCIENCES↗

Integrating New Arctic Plant Functional Types in a Land Surface Model Using Above- and Belowground Field Observations: Modeling Archive

This Modeling Archive is in support of an NGEE Arctic publication "Integrating New Arctic Plant Functional Types in a Land Surface Model Using Above- and Belowground Field Observations". We used field observations of biomass and leaf traits (Salmon et al., 2019b) across a gradient of plant communities on the Seward Peninsula in northwest Alaska (Breen et al., 2020; Iversen et al., 2017) to replace the original ELM configuration with nine, arctic-specific PFTs. Original arctic PFTs in the model were (1) broadleaf deciduous boreal shrub and (2) C3 arctic grass. New PFTs were (1) lichen, (2) bryophyte, (3) evergreen dwarf shrub, (4) deciduous dwarf shrub, (5) deciduous low shrub, (6) deciduous low to tall shrub, (7) alder shrub, (8) forb, and (9) graminoid. New PFTs were parameterized and evaluated using site-level trait and biomass measurements (Salmon et al., 2019b), root C:N ratios and rooting depth patterns (Salmon et al., 2019c), and root biomass (Salmon et al., 2020). This archive contains forcing data and model output from ELM simulations conducted at the Kougarok Hillslope site (Kougarok Road Mile Marker 64). Simulations were conducted for the Kougarok Hillslope site using meteorological driving data from the Scenarios Network for Alaska and Arctic Planning (SNAP) downscaled climate projection dataset using NCAR-CCSM forcing (Bieniek et al., 2020 dataset; Walsh et al., 2018). The archive includes three versions of model simulations representing a progression from the original model configuration to an Arctic-specific configuration (see Output section below). Simulation 1 used grid cell data from a global E3SM configuration, including the fractional area of E3SM PFTs assigned to the grid cell containing the Kougarok Hillslope site in global simulations. This simulation did not distinguish between different plant communities on the Kougarok Hillslope, but instead used a single point simulation to represent the entire area. Simulation 2 used default E3SM PFT definitions combined with adjusted depth to bedrock for plant communities with shallow rocky layers to represent the role of abiotic soil factors in driving site differences (based on depth measurements of Iversen et al., 2019a), and adjusted the relative areas of the broadleaf deciduous boreal shrub and C3 arctic grass PFTs to reflect the observed spatial coverage of shrub and non-shrub PFTs across Kougarok Hillslope plant communities. Simulation 3 used the new arctic PFT definitions and parameterizations based on the vegetation types present at the site, along with the adjusted soil depths used in Simulation 2. Included are *.pdf, *.nc (NetCDF), *tar.gz, *.py, and *.bash files. We would like to thank Mary's Igloo Native Corporation for allowing us to perform this research on their land and giving us the opportunity to share this research with their community. Thanks to Shawn Serbin and Alistair Rogers for helpful discussions. Holly Vander Stel, Joanne Childs, and Stan Wullschleger helped with collection of field data. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

GEOPHYSICS AND SITE CHARACTERIZATION AT THE HANFORD SITE THE SUCCESSFUL USE OF ELECTRICAL RESISTIVITY TO POSITION BOREHOLES TO DEFINE DEEP VADOSE ZONE CONTAMINATION - 11509

Historic boreholes confirmed the presence of nitrate and radionuclide contaminants at various intervals throughout a more than 60 m (200 ft) thick vadose zone, and a 2010 electrical resistivity survey mapped the known contamination and indicated areas of similar contaminants, both laterally and at depth; therefore, electrical resistivity mapping can be used to more accurately locate characterization boreholes. At the Hanford Nuclear Reservation in eastern Washington, production of uranium and plutonium resulted in the planned release of large quantities of contaminated wastewater to unlined excavations (cribs). From 1952 until 1960, the 216-U-8 Crib received approximately 379,000,000 L (100,000,000 gal) of wastewater containing 25,500 kg (56,218 lb) uranium; 1,029,000 kg (1,013 tons) of nitrate; 2.7 Ci of technetium-99; and other fission products including strontium-90 and cesium-137. The 216-U-8 Crib reportedly holds the largest inventory of waste uranium of any crib on the Hanford Site. Electrical resistivity is a geophysical technique capable of identifying contrasting physical properties; specifically, electrically conductive material, relative to resistive native soil, can be mapped in the subsurface. At the 216-U-8 Crib, high nitrate concentrations (from the release of nitric acid [HNO{sub 3}] and associated uranium and other fission products) were detected in 1994 and 2004 boreholes at various depths, such as at the base of the Crib at 9 m (30 ft) below ground surface (bgs) and sporadically to depths in excess of 60 m (200 ft) bgs. These contaminant concentrations were directly correlative with the presence of observed low electrical resistivity responses delineated during the summer 2010 geophysical survey. Based on this correlation and the recently completed mapping of the electrically conductive material, additional boreholes are planned for early 2011 to identify nitrate and radionuclide contamination: (a) throughout the entire vertical length of the vadose zone (i.e., 79 m [260 ft] bgs) within the footprint of the Crib, and (b) 15 to 30 m (50 to 100 ft) east of the Crib footprint, where contaminants are inferred to have migrated through relatively permeable soils. Confirmation of the presence of contamination in historic boreholes correlates well with mapping from the 2010 survey, and serves as a basis to site future characterization boreholes that will likely intersect contamination both laterally and at depth.

54 ENVIRONMENTAL SCIENCES↗

Skin contamination dosimeter

A technique and device provides absolute skin dosimetry in real time at multiple tissue depths simultaneously. The device uses a phoswich detector which has multiple scintillators embedded at different depths within a non-scintillating material. A digital pulse processor connected to the phoswich detector measures a differential distribution (dN/dH) of count rate N as function of pulse height H for signals from each of the multiple scintillators. A digital processor computes in real time from the differential count-rate distribution for each of multiple scintillators an estimate of an ionizing radiation dose delivered to each of multiple depths of skin tissue corresponding to the multiple scintillators embedded at multiple corresponding depths within the non-scintillating material.

61 RADIATION PROTECTION AND DOSIMETRY↗

Exploration and Resource Assessment at Mountain Home Air Force Base, Idaho Using an Integrated Team Approach

The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The team identified several possible sources of funding for this well—the most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140°C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home AFB.

15 GEOTHERMAL ENERGY↗

NEAR-SURFACE GEOPHYSICAL CHARACTERIZATION OF A HOLOCENE FAULT CONDUCIVE TO GEOTHERMAL FLOW NEAR PYRAMID LAKE, NEVADA

Linear deposits of calcium carbonate tufa columns mark recent faults that cut 11 ka Lake Lahontan sediments at Astor Pass, north of Pyramid Lake, Nevada. Throughout the Great Basin, faults appear to control the location of geothermal resources by providing pathways for fluid migration. Reservoir-depth (greater than 1 km) seismic imaging at Astor Pass reveals a fault that projects to one of the lines of tufa columns at the surface. The presence of the tufa deposits suggests this fault carried warm geothermal waters through the lakebed clay sediments in recent time. The warm fluids deposited the tufa when they hit cold Lake Lahontan water at the lakebed. Lake Lahontan covered this location 11 ka to a depth of at least 60 m. In collaboration with the Pyramid Lake Paiute Tribe, an Applied Geophysics class at UNR investigated the near-surface geophysical characteristics of this fault. The survey at and near the tufa columns comprises near-surface Pwave seismic reflection and refraction, electrical resistivity tomography, nearsurface refraction microtremor arrays, nine near-surface direct-current resistivity soundings, magnetic surveys, and gravity surveys. The refraction microtremor results show shear velocities near tufa and faults to be marginally lower, compared to Vs away from the faults. Overall, the 30-m depth-averaged shear velocities are low, less than 300 m/s, consistent with the lakebed clay deposits. These results indicate that no seismically fast (> 500 m/s) tufa deposits are present below the surface at or near the tufa columns. Vs30 averages were for example 274 ± 13 m/s on the fault, 287 ± 2 m/s at 150 m east of the fault, and 290 ± 15 m/s at 150 m west of the fault. The P-velocity refraction optimization results similarly indicate a lack of high-velocity tufa buried below the surface in the Lahontan sediments, reinforcing the idea that all tufa was deposited above the lakebed surface. The seismic results provide a negative test of the hypothesis that deposition of the lakebeds in the Quaternary buried and preserved older tufa columns within the section. Near-surface Wenner arrays with a-spacings up to 30 m show a higher resistivity near the faults, and tufa, than away from the faults. Resistivity averages within a few meters of the surface were 33 ± 17 ohm-m on the fault, 13 ± 3 ohm-m east of the fault, and 9 ± 3 ohm-m west of the fault. It is possible that the geothermal waters are fresher, and more resistive, than waters held in the lakebed clays. Water samples from more than 1 km depth in exploration wells have a TDS of 2500 p.p.m., nearly drinking-water quality. The relatively resistive water, perhaps localized by greater permeability along the fault, could explain the higher resistivity measured near the fault. The results show that there is no high-velocity, high-resistivity tufa along the faults below the surface, so we are unable to use buried tufa to locate the faults that may promote geothermal upwelling in this area. We further hypothesize that as sedimentation buried the tufa during the Quaternary, warm geothermal waters re-dissolved it, and re-precipitated it in the cold lake-bottom water.

15 GEOTHERMAL ENERGY↗

Astor Pass Seismic Surveys Preliminary Report

In collaboration with the Pyramid Lake Paiute Tribe (PLPT), the University of Nevada, Reno (UNR) and Optim re-processed, or collected and processed, over 24 miles of 2d seismic-reflection data near the northwest corner of Pyramid Lake, Nevada. The network of 2d land surveys achieved a near-3d density at the Astor Pass geothermal prospect that the PLPT drilled during Nov. 2010 to Feb. 2011. The Bureau of Indian Affairs funded additional seismic work around the Lake, and an extensive, detailed single-channel marine survey producing more than 300 miles of section, imaging more than 120 ft below the Lake bottom. Optim’s land data collection utilized multiple heavy vibrators and recorded over 200 channels live, providing a state-of-the-art reflection-refraction data set. After advanced seismic analysis including first-arrival velocity optimization and prestack depth migration, the 2d sections show clear fault-plane reflections, in some areas as deep as 4000 ft, tying to distinct terminations of the mostly volcanic stratigraphy. Some lines achieved velocity control to 3000 ft depth; all lines show reflections and terminations to 5000 ft depth. Three separate sets of normal faults appear in an initial interpretation of fault reflections and stratigraphic terminations, after loading the data into the OpendTect 3d seismic visualization system. Each preliminary fault set includes a continuous trace more than 3000 ft long, and a swarm of short fault strands. The three preliminary normal-fault sets strike northerly with westward dip, northwesterly with northeast dip, and easterly with north dip. An intersection of all three fault systems documented in the seismic sections at the end of Phase I helped to locate the APS-2 and APS-3 slimholes. The seismic sections do not show the faults connected to the Astor Pass tufa spire, suggesting that we have imaged mostly Tertiary-aged faults. We hypothesize that the Recent, active faults that produced the tufa through hotspring activity do not have enough offset to produce seismic terminations. We are conducting further high-resolution seismic studies (to 200 ft depths) at the tufa spire to test this hypothesis. Additional work in progress includes a collaborative, iterative joint interpretation of geologic mapping and the seismic sections for fault locations, building the geologic model; and 3d velocity modeling and imaging to locate additional faultplane images appearing between the 2d lines. Overall, the seismic exploration program cost less than $0.5M from all funders. It defines in detail the geologic structure of much of the north margin of Pyramid Lake.

01 COAL, LIGNITE, AND PEAT↗

X-ray backscatter imaging of nuclear materials

The energy of an X-ray beam and critical depth are selected to detect structural discontinuities in a material having an atomic number Z of 57 or greater. The critical depth is selected by adjusting the geometry of a collimator that blocks backscattered radiation so that backscattered X-ray originating from a depth less than the critical depth is not detected. Structures of Lanthanides and Actinides, including nuclear fuel rod materials, can be inspected for structural discontinuities such as gaps, cracks, and chipping employing the backscattered X-ray.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Economics of Developing Hot Stratigraphic Reservoirs

Stratigraphic geothermal reservoirs at 3 – 4 km depth in high heat-flow basins are capable of sustaining 100 MW-scale power plants at about 10 c/kWh. This paper examines the impacts on the levelized cost of electricity (LCOE) of reservoir depth and temperature, reservoir productivity, and drillhole/casing options. For a reservoir at 3 km depth with a moderate productivity index by hydrothermal reservoir standards (about 50 L/s/MPa, 5.6 gpm/psi), an LCOE of 10c/kWh requires the reservoir to be at about 200°C. This is the upper temperature limit for pumps. The calculations assume standard hydrothermal drilling costs, with the production interval completed with a 7 inch liner in an 8.5 inch hole. If a reservoir at 4 km depth has excellent permeability characteristics with a productivity index of 100 L/s/MPa (11.3 gpm/psi), then the LCOE is about 11 c/kWh assuming the temperature decline rate with development is not excessive (< 1%/y, with first thermal breakthrough delayed by about 10 years). Completing wells with modest horizontal legs (e.g. several hundred meters) may be important for improving well productivity because of the naturally high, sub-horizontal permeability in this type of reservoir. Reducing the injector/producer well ratio may also be cost-effective if the injectors are drilled as larger holes.

15 GEOTHERMAL ENERGY↗

Thermal Effusivity Tomography from Pulsed Thermal Imaging

The software program generates 3D volume distribution of thermal effusivity within a test material from one—sided pulsed thermal imaging data. Thsi is the first software capable of accurate, fast and automated thermal tomographic imaging of inhomogeneoirs materials to produce 3D images similar to those obtained from 3D X—ray CT (all previous thepnal—imaging software can only produce 20 results) . Because thermal effusivity is an Intrisic material property that is related to material constituent, density, conductivity, etc., quantitative imaging of eftusivity allowed direct visualization of material’s internal constituent/structure and damage distributions, thereby potentially leading to quantitative prediction of other material properties such as strength. I can be therefre be used for 3D imaging of material structure in fundamental material studies, nondestructive characterization of defects/flaws in structural engineering components, health monitoring of material damage and degradation during service, and medical imaging and diagnostics. This technology is one—sided, non contact and sensitive to material’s thermal property and discontinuity. One major advantage of this tomographic technology over x-ray CT and ultrasounds is its natural efficiency for 3D imaging of the volume under a large surface area. This software is implemented with a method for thermal computed tomography of thermal effusivity from one—sided pulsed thermal imaging (or thermography) data. The method is based on several solutions of the governing heat transfer equation under pulsed thermography test condition. In particular, it consists of three components. 1) It utilized the thermal effusivity as the imaging parameter to construct the 3D image. 2) It established a relationship between the space (depth) and the time, because thermography data are in the time domain. 3) It incorporated a deconvolution algorithm to solve the depth porfile of the material thermal effusivity from the measured (temporal) surface temperature data. The predicted effusivity is a direct function of depth, not an average or convolved parameter, so it is an accurate (and more sensitive) representation of local property along depth.

Sun, Jiangang↗

Passivated contact formation using ion implantation

Methods for forming passivated contacts include implanting compound-forming ions into a substrate to about a first depth below a surface of the substrate, and implanting dopant ions into the substrate to about a second depth below the surface. The second depth may be shallower than the first depth. The methods also include annealing the substrate.

36 MATERIALS SCIENCE↗

INTER-DIGITAL CAPACITIVE SENSOR FOR EVALUATING CABLE INSULATION THROUGH JACKET

Interdigital capacitive (IDC) sensors have previously been used to measure cable-age/damage indicative dielectric properties of cable insulation when placed in direct contact with the insulation. Often cable insulation is covered by a polymer jacket precluding direct contact with the insulation. As part of a continuing program to develop and evaluate nondestructive examination methods that may be applied to cable condition assessment, an IDC to measure the effect of cable polymer dielectric change through a covering jacket has been developed. The IDC consists of two fork-like electrodes facing each other with the fork tines interspersed and separated by a small gap. On one electrode, the gap is 5 mm while on the other, the gap is 2 mm. Electric field depth-of-field penetrations are similar to the electrode gaps. The electrodes are printed on a flexible substrate that can be conformed to the outside jacketed surface of a cylindrical cable, with tines parallel to the cable axis. The electrodes are connected to a broad frequency-spectral impedance meter that senses the capacitance between the narrowly gapped electrode tines. This capacitance is known to vary as a function of the permittivity of any material in close proximity to the electrodes. For jacketed cable systems, the IDC response is dominated by the jacket but, by analyzing measurements from IDC sensors with different depths-of-field penetration into the cable under test, the influence of the cable jacket material (primarily influenced by the shallow-depth-of field IDC) can be separated from the deeper-depth-of-field IDC sensing the combined effects of both jacket and underlying insulation. No other NDE method is known that is capable of sensing insulation dielectric properties through an overlying jacket.

Cable NDE, Interdigital Capacitance, Insulation Pe↗

Assessment of Multiple Monitoring Methods for Detection of Brine and CO2 Leakage

We assess the effectiveness of four surface-based geophysical methods and in situ monitoring of pressure and chemical changes for detecting brine and CO2 leakage from legacy wells into underground sources of drinking water (USDW) overlying a CO2 storage reservoir. This is the first such effort to evaluate and compare six monitoring methods for detection of CO2 leakage. This assessment, conducted in support of the USDOE National Risk Assessment Partnership (NRAP), utilizes 3000 synthetic data sets, generated in an uncertainty quantification (UQ) model framework. This framework combines the results of (1) a CO2 storage reservoir model of a hypothetical storage operation of 5 MT/yr for 50 years into the 1700-m deep Vedder Fm. at a site near Kimberlina, California with (2) wellbore leakage models of a legacy well and (3) multi-phase flow and reactive transport models of brine and CO2 plume migration in aquifer layers overlying the storage reservoir. Leakage drives subsurface changes, quantified by pressure plumes, CO2-saturation plumes, and total dissolved solids (TDS) plumes, the latter being related to changes in pH and species concentrations. Depending on the depth of leakage, aquifer permeability, and regional groundwater gradient, pressure plume volumes can become larger than the CO2 and TDS plumes; however, reaching detectable thresholds may take too long to be useful. For a single monitoring well located 500 m downgradient of a leaky legacy well, a depth of 570 m is found to be optimal for sampling pressure and chemical changes. We assess four surface-based geophysical monitoring methods: electrical resistivity tomography (ERT), magnetotellurics (MT), gravity, and seismic methods. Sensors cover a 4-km × 2-km area. Both ERT and MT methods are sensitive to changes in CO2 saturation and TDS concentration, whereas gravity and seismic methods detect changes in CO2 saturation. The six monitoring methods complement each other in space and time, and we find that a minimum of 20 kT of CO2 leakage is required for the leakage plume to be detected. Of the four surface-based geophysical methods, gravity monitoring appears to be the most sensitive to CO2 leaks, while the usefulness of in situ pressure and chemical monitoring will depend on the level of unfilterable background noise. Geophysical monitoring methods may detect a leak anywhere in a large area and in a large depth range, but the effectiveness of pressure and chemical monitoring depends on the number of monitoring wells, where those wells are located, and the depth of sampling. Surface-based geophysical monitoring methods are cost-effective alternatives to in situ pressure and chemical monitoring methods.

NRAP, CCS, monitoring, geophysical methods, gravit↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

Contaminated Soil Volume Estimation at the Maywood Site - 12292

As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program properties, Argonne National Laboratory assisted the U.S. Army Corps of Engineers (USACE) New York District in revising contaminated soil volume estimates for the remaining areas of the Stepan/Sears properties that require soil remediation. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations; both sampling results and down-hole gamma data were coded to identify whether the results indicated the presence of contamination above site cleanup requirements. Significant effort was invested in developing complete electronic data sets for the site by incorporating data contained in various scanned documents, maps, etc. The updating process yielded both a best guess estimate of contamination volumes and upper and lower bounds on the volume estimate that reflected the estimate's uncertainty. The site-wide contaminated volume estimate (with associated uncertainty) was adjusted to reflect areas where remediation was complete; the result was a revised estimate of the remaining soil volumes requiring remediation that the USACE could use for planning. Other environmental projects may benefit from this process for estimating the volume of contaminated soil. A comparison of sample and DHG results for various stations with the site ICSM provides one measure of the quality of site understanding relative to the presence of contamination and its likely extent. A second measure of the quality of a contaminated soil volume estimate, in the case of BAASS, is a comparison of the best guess volume estimate with the conservative volume estimate. For Maywood, the conservative volume estimate is more than double the best guess. The data available for the site indicate that the preponderance of this difference is attributable to uncertainty about the exact depth of known contamination. The observed depth of contamination based on sample results and DHG data often varied significantly among adjacent soil cores. In the case of Maywood, where a significant amount of remediation has already taken place, a third measure of the quality of the volume estimates is the retrospective estimate of contaminated soil volumes for areas that have already been remediated [2]. The USACE is currently comparing the latest BAASS volume estimates for those areas with records indicating what was actually removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Arsenic Sequestration By Sorption Processes in High-Iron Sediments

High-iron sediments in North Haiwee Reservoir (Olancha, CA), resulting from water treatment for removal of elevated dissolved arsenic in the Los Angeles Aqueduct system, were studied to examine arsenic partitioning between solid phases and porewaters undergoing shallow burial. To reduce arsenic in drinking water supplies, ferric chloride and a cationic polymer coagulant are added to the aqueduct upstream of Haiwee Reservoir, forming an iron-rich floc that scavenges arsenic from the water. Analysis by synchrotron X-ray absorption spectroscopy (XAS) showed that the aqueduct precipitate is an amorphous hydrous ferric oxide (HFO) similar to ferrihydrite, and that arsenic is associated with the floc as adsorbed and/or coprecipitated As(V). Arsenic-rich floc and sediments are deposited along the inlet channel as aqueduct waters enter the reservoir. Sediment core samples were collected in two consecutive years from the edge of the reservoir along the inlet channel using 30- or 90-cm push cores. Cores were analyzed for total and extractable arsenic and iron concentrations. Arsenic and iron speciation and mineralogy in sediments were examined at selected depths by synchrotron XAS and X-ray diffraction (XRD). Sediment-porewater measurements were made adjacent to the core sample sites using polyacrylamide gel probe samplers. Results showed that sediment As(V) is reduced to As(III) in all cores at or near the sediment-water interface (0--4 cm), and only As(III) was observed in deeper sediments. Analyses of EXAFS spectra indicated that arsenic is present in the sediments mostly as a bidentate-binuclear, inner-sphere sorption complex with local atomic geometries similar to those found in laboratory studies. Below about 10 cm depth, XAS indicated that the HFO floc had been reduced to a mixed Fe(II, III) solid with a local structure similar to that of synthetic green rust (GR) but with a slightly contracted average interatomic Fe-Fe distance in the hydroxide layer. There was no evidence from XRD for the formation of a crystalline GR phase. The release of dissolved iron (presumably Fe{sup 2+}) and arsenic to solution, as monitored by in situ gel probes, was variable but, in general, occurred at greater depths than arsenic reduction in the sediments by spectroscopic observations and appears to be near or below the depth at which sediment GR was identified. These data point to reductive dissolution of the sorbent iron phase as the primary mechanism of release of sorbed arsenic to solution.

43 PARTICLE ACCELERATORS↗

Refine your search to explore more results.