Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

Current status of permanent magnet radiation resiliency studies at CEBAF

One possible future for Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) lies in upgrading its maximum nominal energy using Fixed-Field Alternating-gradient (FFA) technology for its recirculating arcs. The current proposal aims to use permanent magnets to supply the fixed fields. One concern among reviewers is the degradation of these permanent magnets during operation due to the radiation environment in which they will be present. This work, funded by a Laboratory Directed R&D grant, aims to measure the magnet degradation in the CEBAF tunnel enclosure, and extrapolate to the energies expected from the upgrade. We present the latest results of this study, as well as plans moving forward.

Accelerator Physics↗

eLog analysis for accelerators: status and future outlook

This work demonstrates electronic logbook (eLog) systems leveraging modern AI-driven information retrieval capabilities at the accelerator facilities of Fermilab, Jefferson Lab, Lawrence Berkeley National Laboratory (LBNL), SLAC National Accelerator Laboratory. We evaluate contemporary tools and methodologies for information retrieval with Retrieval Augmented Generation (RAGs), focusing on operational insights and integration with existing accelerator control systems. The study addresses challenges and proposes solutions for state-of-the-art eLog analysis through practical implementations, demonstrating applications and limitations. We present a framework for enhancing accelerator facility operations through improved information accessibility and knowledge management, which could potentially lead to more efficient operations.

Accelerator Physics↗

Status Of the ILC Main Linac Design

International Linear collider (ILC) is a proposed accelerator facility which is primarily based on two 11-km long superconducting main linacs. In this paper we present recent updates on the main linac design and discuss changes made in order to meet specification outlined in the technical design report (TDR).

43 PARTICLE ACCELERATORS↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Cryogenic Carbon Capture™ (CCC) Status Report

The Cryogenic Carbon Capture™ (CCC) process separates CO2 from light gases in essentially any continuous process. CCC cools the gases to the frost or desublimation point of CO2 (-100 to -135 °C), separates and pressurizes the solids, and warms all streams to produce a CO2-depleted stream at ambient pressure and a pure (99+%) pressurized liquid CO2 stream typically to about 150 bar, both at ambient temperature. The process also recovers all gas moisture and most gas impurities less volatile than CO2 (NOx, SOx, Hg, PM, UHC, CCC, etc.) in separable streams. CCC nearly eliminates refrigeration energy for sensible temperature changes through heat integration. CCC does require energy to change the CO2 phase from a mixed vapor to a pressurized fluid, which represents the minimum energy required of any process for this separation. CCC uses additional energy for turbomachinery inefficiencies, heat losses, moisture removal and overall process pressure drop. Aside from these real-world energy demands, CCC operates near the minimum energy required to perform this gas separation by minimizing stream recycling. CCC compresses CO2 as a liquid, which is one of several reasons it costs about about half as much and consumes about half as much energy as an amine process when using flue gases with about 15% CO2. The process also has several major additional advantages, including (a) it is a bolt-on retrofit technology that does not need steam or any modification of existing equipment, (b) it recovers water and nearly all pollutants in addition to CO2 from the flue gas, (c) it enables highly efficient and cost effective energy storage at grid scale and on time scales of minutes, (d) it enables NG storage if the energy storage option is used, and (d) it has a small footprint and is minimally disruptive to existing plants, requiring only electrical power and a gas source to operate. Sustainable Energy Solutions (SES) has scaled this technology through several levels, the largest of which captures nominally 1 tonne of CO2/day and is called the skid system. Skid system field tests include utility-scale power plants, cement plants, heating plants, and other utility or industrial sites that burn natural gas, biomass, coal, shredded tires, municipal waste, and combinations of these fuels. These field tests produced 95-99% CO2 capture with CO2 purities of 99+% and initial CO2 contents that range from 4 to 28%. SES currently seeks to scale the system to merchant scale (10-80 tonnes of CO2 per day). In the process of doing so, SES has demonstrated the potential for CCC to contribute to energy storage and direct air capture in innovative and cost-effective ways. This presentation discusses the overall process and highlights results from field and in-house tests. These include (a) measured CO2 capture rates and operating conditions from in-house and field tests, and (b) predicted utility-scale costs and energy demands. This discussion also includes the application of the CCC technology to energy storage and direct air capture.

20 FOSSIL-FUELED POWER PLANTS↗

The status of the galactic center gamma-ray excess

The Galactic Center Gamma-Ray Excess has a spectrum, angular distribution, and overall intensity that agree remarkably well with that expected from annihilating dark matter particles in the form of a m_X \sim m X ∼ 50 GeV thermal relic. Previous claims that these photons are clustered on small angular scales or trace the distribution of known stellar populations once appeared to favor interpretations in which this signal originates from a large population of unresolved millisecond pulsars. More recent work, however, has overturned these conclusions, finding that the observed gamma-ray excess does not contain discernible small scale power, and is distributed with approximate spherical symmetry, not tracing any known stellar populations. In light of these results, it now appears significantly more likely that the Galactic Center Gamma-Ray Excess is produced by annihilating dark matter.

Hooper, Dan↗

Status of LANL Efforts to Effectively Use Sequoia

Los Alamos National Laboratory (LANL) is currently working on 3 new production applications, VPC, xRage, and Pagosa. VPIC was designed to be a 3D relativist, electromagnetic Particle-In-Cell code for plasma simulation. xRage, a 3D AMR mesh amd multi physics hydro code. Pagosa, is a 3D structured mesh and multi physics hydro code.

97 MATHEMATICS AND COMPUTING↗

2015 DOE Special Status Report

Final Summary Report for the 2015 Aspen Winter Conference on "Unifying Concepts in Glass Physics"

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

2015 DOE Special Status Report

This is the final Summary Report for the 2015 Aspen Winter Conference on "Progress and Applications on Modern Quantum Field Theory".

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LANL Environmental ALARA Program Status Report for CY 2014

Los Alamos National Laboratory is committed to ensuring that radiation exposures of members of the public and the environment from LANL operations, past and present, are as low as reasonably achievable (ALARA). A Finding (RL.2-F-1) and Observation (RL.2-0-1) in the NNSA/ LASO report, September 2007, Release of Property (Land) Containing Residual Radioactive Material Self-Assessment Report, indicated that LANL had no policy or documented process in place for the release of property containing residual radioactive material. In response, LANL developed PD410, Los Alamos National Laboratory Environmental ALARA Program. This document was officially published as a Laboratory-wide policy and became effective on August 8, 2008 and was updated in 2011. The document provides program authorities, responsibilities, descriptions, processes, and thresholds for conducting qualitative and quantitative ALARA analyses for prospective and actual radiation exposures to the public and the environment from DOE activities conducted on site.

54 ENVIRONMENTAL SCIENCES↗

CIRFT Testing of High-Burnup Used Nuclear Fuel Rods from the Pressurized Water Reactor and Boiling Water Reactor Environments (FY 2015 Status Report)

High burn-up spent nuclear fuel (SNF) cladding has a significant amount of microcracks and hydrides, which will reduce the stress intensity required for crack growth. The potential linking of microcracks during vibration loading could also reduce the fatigue threshold/incubation period significantly, accelerating fatigue failure. In addition to cladding damage, the microstructure of fuel pellets and the characteristics of the interfaces between fuel pellets and between fuel pellets and cladding are likely to be dramatically changed after high burn-up. These modifications can have a direct impact on the structural integrity and vibration response of SNF rods in transportation. As a result, vibration has been included as one of the mandatory testing conditions in the structural evaluation of packages used by the US Nuclear Regulation Commission (NRC) in transporting SNF (10 CFR §71.71). Prior to this program development, no current system is available to test the SNF and evaluate the performance of fuel rods during spent fuel transportation. The objective of this research is to develop a system that can appropriately test the response of high-burnup SNF rods in a simulated loading condition.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Refine your search to explore more results.