SEARCH · Engineering Papers
Results for “SWITCHING”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Autonomous scanning probe microscopy with hypothesis learning: Exploring the physics of domain switching in ferroelectric materials
Hypothesis-learning-driven automated scanning probe microscopy allows physical discovery during experiments, where the hypothesis learning algorithm implemented on an operating microscope identifies the physical mechanism behind the material’s response
Inhomogeneous domain switching near an electrode edge in orthorhombic K0.5Na0.5NbO3 piezoceramic
Not provided.
A Versatile Conformational Switch Regulates Reactivity in Human Branched-Chain [alpha]-Ketoacid Dehydrogenase
Abstract not provided
Mis16 Switches Function from a Histone H4 Chaperone to a CENP-A Cnp1 -Specific Assembly Factor through Eic1 Interaction
Abstract not provided
Structural Basis for Rab8a Recruitment of RILPL2 via LRRK2 Phosphorylation of Switch 2
Not Available
Optimal Controller Synthesis for a Class of LTI Systems via Switched Feedback.
Abstract not provided.
CAISO flicks switch on nodal scheme and lights stay on
In 2000-01, two years after introducing a competitive wholesale power auction in California - with a separate day-ahead zonal market operated by the California Power Exchange and a zonal market for ancillary services and balancing energy operated by the California Independent System Operator (CAISO) - the California market collapsed from exorbitant prices, flagrant gaming, and abuse of market power. Nine years later, CAISO introduced a nodal pricing auction for the wholesale market in April, replacing the zonal scheme, which was among many causes of the original market's demise. With nearly 3,000 nodes on the network, high prices in one region do not affect prices everywhere on the system. After investing some $200 million to upgrade the software, countless delays, and 18 months of market simulation and testing, the new auction was introduced and nothing unusual happened.
Carbon Mitigation from Fuel-Switching in the U.S. Power Sector: State, Regional and National Potentials
Explore the source record for details and available documents.
Reversible molecular motional switch based on circular photoactive protein oligomers exhibits unexpe
Explore the source record for details and available documents.
Mobility-Resolved Ion Selection in Uniform Drift Field Ion Mobility Spectrometry/Mass Spectrometry: Dynamic Switching in Structures for Lossless Ion Manipulations
Not Available
A Binary Arginine Methylation Switch on Histone H3 Arginine 2 Regulates Its Interaction with WDR5
Explore the source record for details and available documents.
Refine your search to explore more results.