Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

SABER Ground Calibration Report

NASA Langley Research Center (LaRC) awarded contract NAS1-20467 to the Space Dynamics Laboratory at Utah State University (SDL/USU) to develop instrumentation for the Sounding of the Atmosphere using Broadband Emission Radiometry (SABER) investigation. This report is submitted in compliance with the contract statement of work, DRD item 19, and the requirements of the “SABER Test and Calibration Plan” (SDL/97-069). It describes the test, data analysis, and results of ground calibration. SDL/USU is responsible for ground calibration testing, data collection, and publication of this report. The data analysis and results shown in this report, however, are a shared effort between SDL/USU, GATS, and LaRC.

SABER↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Launch Complex 39A Operations Support Building Area SWMU 111 Year 3 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents the findings, observations, and results for Year 3 of operation, maintenance, and monitoring activities for the AS Interim Measure (IM) at the Launch Complex 39A Operations Support Building Area (AOSB) at Kennedy Space Center (KSC), Florida. This report was presented as an Advance Data Package during the October 2024 KSC Remediation Team (KSCRT) meeting. The reporting period for activities covered under this PMR is from August 2023 through October 2024.

Mark P Speranza↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Wind Vision: Updating the DOE 20% Wind Energy by 2030 Report (Poster)

The 20% Wind Energy by 2030 report was developed as part of the Advanced Energy Initiative. Published in 2008, the report was largely based on information collected and analyzed in 2006. Much has changed since then, including shifts in technology, markets, and policy. The industry needs a new, clear, vision for wind power that is shared among stakeholders from the U.S. government, industry, academia, and NGO communities. At WINDPOWER 2013, the U.S. Department of Energy, in partnership with the American Wind Energy Association and the Wind Energy Foundation, launched a project to update the 20% report with new objectives. This conference poster outlines the elements of the new Wind Vision.

17 WIND ENERGY↗

2nd Quarter Transportation Report FY2015: Radioactive Waste Shipments to and from the Nevada National Security Site

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 2nd quarter of Fiscal Year (FY) 2015 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, and the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.

17 WIND ENERGY↗

NETL CO2U LCA Report Template

The NETL CO2U LCA Report Template is part of the NETL CO2U LCA Guidance Toolkit for Carbon Utilization funding recipients to meet their LCA requirements. The toolkit includes the following files: NETL CO2U LCA Guidance Document, NETL CO2U openLCA LCI Database, NETL CO2U openLCA Results Contribution Tool, NETL CO2U LCA Documentation Spreadsheet, and NETL CO2U LCA Report Template. The NETL CO2U LCA Report Template is required to be completed by all funding recipients to consistently document the boundaries and results of their LCA.

Source record↗

An Overview of the U.S. Department of Energy's GeoVision Report: Preprint

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

FY 2017 Site-Directed Research and Development Annual Report

Annual report of compiled individual reports for 28 Site-Directed Research and Development Program projects for the fiscal year 2017. This report will be submitted to NNSA, and will be available online as well as being distributed in hard copy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Overview of the U.S. Department of Energy’s GeoVision Report

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

40 EE - Geothermal Technologies Office (EE-4G)↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Refine your search to explore more results.