Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Remote”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

An error reduction algorithm to improve lidar turbulence estimates for wind energy

Abstract. Remote-sensing devices such as lidars are currently being investigated as alternatives to cup anemometers on meteorological towers for the measurement of wind speed and direction. Although lidars can measure mean wind speeds at heights spanning an entire turbine rotor disk and can be easily moved from one location to another, they measure different values of turbulence than an instrument on a tower. Current methods for improving lidar turbulence estimates include the use of analytical turbulence models and expensive scanning lidars. While these methods provide accurate results in a research setting, they cannot be easily applied to smaller, vertically profiling lidars in locations where high-resolution sonic anemometer data are not available. Thus, there is clearly a need for a turbulence error reduction model that is simpler and more easily applicable to lidars that are used in the wind energy industry. In this work, a new turbulence error reduction algorithm for lidars is described. The Lidar Turbulence Error Reduction Algorithm, L-TERRA, can be applied using only data from a stand-alone vertically profiling lidar and requires minimal training with meteorological tower data. The basis of L-TERRA is a series of physics-based corrections that are applied to the lidar data to mitigate errors from instrument noise, volume averaging, and variance contamination. These corrections are applied in conjunction with a trained machine-learning model to improve turbulence estimates from a vertically profiling WINDCUBE v2 lidar. The lessons learned from creating the L-TERRA model for a WINDCUBE v2 lidar can also be applied to other lidar devices. L-TERRA was tested on data from two sites in the Southern Plains region of the United States. The physics-based corrections in L-TERRA brought regression line slopes much closer to 1 at both sites and significantly reduced the sensitivity of lidar turbulence errors to atmospheric stability. The accuracy of machine-learning methods in L-TERRA was highly dependent on the input variables and training dataset used, suggesting that machine learning may not be the best technique for reducing lidar turbulence intensity (TI) error. Future work will include the use of a lidar simulator to better understand how different factors affect lidar turbulence error and to determine how these errors can be reduced using information from a stand-alone lidar.

17 WIND ENERGY↗

UAVs Being Used for Environmental Surveying

UAVs, are much more sophisticated than your typical remote-controlled plane. INL robotics and remote sensing experts have added state-of-the-art imaging and wireless technology to the UAVs to create intelligent remote surveillance craft that can rapidly survey a wide area for damage and track down security threats.

47 OTHER INSTRUMENTATION↗

A Robust Infrastructure Design for Gas Centrifuge Enrichment Plant Unattended Online Enrichment Monitoring

An online enrichment monitor (OLEM) is being developed to continuously measure the relative isotopic composition of UF6 in the unit header pipes of a gas centrifuge enrichment plant (GCEP). From a safeguards perspective, OLEM will provide early detection of a facility being misused for production of highly enriched uranium. OLEM may also reduce the number of samples collected for destructive assay and if coupled with load cell monitoring can provide isotope mass balance verification. The OLEM design includes power and network connections for continuous monitoring of the UF6 enrichment and state of health of the instrument. Monitoring the enrichment on all header pipes at a typical GCEP could require OLEM detectors on each of the product, tails, and feed header pipes. If there are eight process units, up to 24 detectors may be required at a modern GCEP. Distant locations, harsh industrial environments, and safeguards continuity of knowledge requirements all place certain demands on the network robustness and power reliability. This paper describes the infrastructure and architecture of an OLEM system based on OLEM collection nodes on the unit header pipes and power and network support nodes for groupings of the collection nodes. A redundant, self-healing communications network, distributed backup power, and a secure communications methodology. Two candidate technologies being considered for secure communications are the Object Linking and Embedding for Process Control Unified Architecture cross-platform, service-oriented architecture model for process control communications and the emerging IAEA Real-time And INtegrated STream-Oriented Remote Monitoring (RAINSTORM) framework to provide the common secure communication infrastructure for remote, unattended monitoring systems. The proposed infrastructure design offers modular, commercial components, plug-and-play extensibility for GCEP deployments, and is intended to meet the guidelines and requirements for unattended and remotely monitored safeguards systems.

On Line Enrichment Monitor GCEP↗

RADIOISOTOPE POWER SYSTEM CAPABILITIES AT THE IDAHO NATIONAL LABORATORY (INL)

--Idaho National Laboratory’s, Space Nuclear Systems and Technology Division established the resources, equipment and facilities required to provide nuclear-fueled, Radioisotope Power Systems (RPS) to Department of Energy (DOE) Customers. RPSs are designed to convert the heat generated by decay of iridium clad, 238PuO2 fuel pellets into electricity that is used to power missions in remote, harsh environments. Utilization of nuclear fuel requires adherence to governing regulations and the INL provides unique capabilities to safely fuel, test, store, transport and integrate RPSs to supply power—supporting mission needs. Nuclear capabilities encompass RPS fueling, testing, handling, storing, transporting RPS nationally, and space vehicle integration. Activities are performed at the INL and in remote locations such as John F. Kennedy Space Center and Cape Canaveral Air Station to support space missions. This paper will focus on the facility and equipment capabilities primarily offered at the INL, Material and Fuel Complex located in a security-protected, federally owned, industrial area on the remote desert site west of Idaho Falls, ID. Nuclear and non-nuclear facilities house equipment needed to perform required activities such as general purpose heat source (GPHS) module pre-assembly and module assembly using nuclear fuel; RPS receipt and baseline electrical testing, fueling, vibration testing to simulate the launch environment, mass properties testing to measure the mass and compute the moment of inertia, electro-magnetic characterizing to determine potential consequences to the operation of vehicle or scientific instrumentation, and thermal vacuum testing to verify RPS power performance in the vacuum and cold temperatures of space.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Global Arrays Parallel Programming Toolkit

The two predominant classes of programming models for parallel computing are distributed memory and shared memory. Both shared memory and distributed memory models have advantages and shortcomings. Shared memory model is much easier to use but it ignores data locality/placement. Given the hierarchical nature of the memory subsystems in modern computers this characteristic can have a negative impact on performance and scalability. Careful code restructuring to increase data reuse and replacing fine grain load/stores with block access to shared data can address the problem and yield performance for shared memory that is competitive with message-passing. However, this performance comes at the cost of compromising the ease of use that the shared memory model advertises. Distributed memory models, such as message-passing or one-sided communication, offer performance and scalability but they are difficult to program. The Global Arrays toolkit attempts to offer the best features of both models. It implements a shared-memory programming model in which data locality is managed by the programmer. This management is achieved by calls to functions that transfer data between a global address space (a distributed array) and local storage. In this respect, the GA model has similarities to the distributed shared-memory models that provide an explicit acquire/release protocol. However, the GA model acknowledges that remote data is slower to access than local data and allows data locality to be specified by the programmer and hence managed. GA is related to the global address space languages such as UPC, Titanium, and, to a lesser extent, Co-Array Fortran. In addition, by providing a set of data-parallel operations, GA is also related to data-parallel languages such as HPF, ZPL, and Data Parallel C. However, the Global Array programming model is implemented as a library that works with most languages used for technical computing and does not rely on compiler technology for achieving parallel efficiency. It also supports a combination of task- and data-parallelism and is available as an extension of the message passing (MPI) model. The GA model exposes to the programmer the hierarchical memory of modern high-performance computer systems, and by recognizing the communication overhead for remote data transfer, it promotes data reuse and locality of reference. Virtually all the scalable architectures possess non-uniform memory access characteristics that reflect their multi-level memory hierarchies. These hierarchies typically comprise processor registers, multiple levels of cache, local memory, and remote memory. Over time, both the number of levels and the cost (in processor cycles) of accessing deeper levels has been increasing. It is important for any scalable programming model to address memory hierarchy since it is critical to the efficient execution of scalable applications.

ARMCI↗

Systems and methods for retaining and removing irradiation targets in a nuclear reactor

A retainer is placed on a conduit to control movement of objects within the conduit in access-restricted areas. Retainers can prevent or allow movement in the conduit in a discriminatory fashion. A fork with variable-spacing between prongs can be a retainer and be extended or collapsed with respect to the conduit to change the size of the conduit. Different objects of different sizes may thus react to the fork differently, some passing and some being blocked. Retainers can be installed in inaccessible areas and allow selective movement in remote portions of conduit where users cannot directly interface, including below nuclear reactors. Position detectors can monitor the movement of objects through the conduit remotely as well, permitting engagement of a desired level of restriction and object movement. Retainers are useable in a variety of nuclear power plants and with irradiation target delivery, harvesting, driving, and other remote handling or robotic systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Report to the National Park Service for Permit LAKE-2014-SCI-002

The overall purpose of the study is to determine how to use existing geologic data to predict gamma-ray background levels as measured during aerial radiological surveys. Aerial radiological surveys have typically been for resource exploration purposes but are now also used for homeland security purposes and nuclear disaster assessment as well as determining the depth of snowpack. Foreknowledge of the background measured during aerial radiological survey will be valuable for all the above applications. The gamma-ray background comes from the rocks and soil within the first 30 cm of the earth’s surface in the area where the survey is being made. The background should therefore be predictable based on an understanding of the distribution and geochemistry of the rocks on the surface. We are using a combination of geologic maps, remote sensing imagery and geochemical data from existing databases and the scientific literature to develop a method for predicting gamma-ray backgrounds. As part of this project we have an opportunity to ground truth our technique along a survey calibration line near Lake Mojave that is used by the Remote Sensing Lab (RSL) of National Security Technologies, LLC (NSTec). RSL makes aerial measurements along this line on a regular basis, so the aerial background in the area is well known. By making ground-based measurements of the gamma-ray background and detailed observations of the geology of the ground surface as well as local topography we will have the data we need to make corrections to the models we build based on the remote sensing and geologic data. Our project involves collaborators from the Airborne Geophysics Section of the Geological Survey of Canada as well as from NSTec’s RSL. Findings

Burnley, Pamela C.↗

Light-weight cache coherence for data processors with limited data sharing

A data processing system includes a plurality of processors, local memories associated with a corresponding processor, and at least one inter-processor link. In response to a first processor performing a load or store operation on an address of a corresponding local memory that is not currently in the local cache, a local cache allocates a first cache line and encodes a local state with the first cache line. In response to a load operation from an address of a remote memory that is not currently in the local cache, the local cache allocates a second cache line and encodes a remote state with the second cache line. The first processor performs subsequent loads and stores on the first cache line in the local cache in response to the local state, and subsequent loads from the second cache line in the local cache in response to the remote state.

97 MATHEMATICS AND COMPUTING↗

Global communication and control

A process detects media dispersion. The process detects the dispersion of contaminants through distributed remote sensor platforms that connect one or more sensors on a remote device. The process transmits detection data from the distributed remote sensor platform to a radiation tolerant satellite router. A gateway connects the radiation tolerant satellite router to a hardware server and converts the detection data to a compatible form with a protocol used by a hardware server. The process generates a plume model in response to the detection data and meteorological data that models dispersion plumes and activates and deactivates selected sensors in response to a forecasted to dispersion area.

Harter, Andrew↗

Automated commissioning and inspection for PV systems

An electric system includes a local power controller and solar panel system that includes a plurality of solar modules on one or more branch circuits. A method for commissioning the electric system includes an installer using a commissioning device to send and receive information from a remote system and the local power controller performing an automatic self-test of the electric system. The results of the self-test may be packaged with photographs and measurements of the electric system and sent to a remote system where an inspector can inspect the electric system remotely. After receiving approval by the inspector, the local power controller may automatically activate each branch circuit of the electric system and thus enabling the electric system to generate electricity.

14 SOLAR ENERGY↗

PCIe write request acknowledgment

A PCIe (Peripheral Component Interconnect Express) protocol converter for connection to a central processing unit (CPU) node having a root complex, a CPU memory fabric and CPU memory may include independent PCIe links, a fabric interface and a fabric switch connected to the fabric interface. Each of the links may include an endpoint for connection to the root complex. The fabric switch is connected to the fabric interface of each of the links and is connectable to a remote node. The fabric switch transmits writes of a single write request from the remote node across both links. Each fabric interface is to transmit an acknowledgment to the remote node in response to a write of the writes becoming observable at the CPU node hi Michael, hi Michael,.

97 MATHEMATICS AND COMPUTING↗

System and method for compact electro-optical interface

An electro-optical interface system is disclosed which incorporates a housing, an electrical circuit supported from the housing and configured to interface to a plurality of remote electrical components, an electronics subsystem and an optical subsystem. The electronics subsystem is housed within the housing and in communication with the electrical circuit. The optical subsystem is housed within the housing and in communication with the electronics subsystem. The optical subsystem receives electrical signals from the electronics subsystem which are representative of electrical signals received from the remote electrical components, and converts the received electrical signals into optical signals for transmission to a remote subsystem.

Patra, Susant↗

Metal Cutting for Large Component Removal

Decommissioning of commercial nuclear power plants presents technological challenges. One major challenge is the removal of large components mainly consisting of the reactor vessel, steam generators and pressurizer. In order to remove and package these large components nozzles must be cut from the reactor vessel to precise tolerances. In some cases steam generators must be segmented for size and weight reduction. One innovative technology that has been used successfully at several commercial nuclear plant decommissioning is diamond wire sawing. Diamond wire sawing is performed by rotating a cable with diamond segments attached using a flywheel approximately 24 inches in diameter driven remotely by a hydraulic pump. Tension is provided using a gear rack drive which also takes up the slack in the wire. The wire is guided through the use of pulleys keeps the wire in a precise location. The diamond wire consists of 1/4 inch aircraft cable with diamond beads strung over the cable separated by springs and brass crimps. Standard wire contains 40 diamond beads per meter and can be made to any length. Cooling the wire and controlling the spread of contamination presents significant challenges. Under normal circumstances the wire is cooled and the cutting kerf cleaned by using water. In some cases of reactor nozzle cuts the use of water is prohibited because it cannot be controlled. This challenge was solved by using liquid Carbon Dioxide as the cooling agent. The liquid CO{sub 2} is passed through a special nozzle which atomizes the liquid into snowflakes which is introduced under pressure to the wire. The snowflakes attach to the wire keeping it cool and to the metal shavings. As the CO{sub 2} and metal shavings are released from the wire due to its fast rotation, the snowflakes evaporate leaving only the fine metal shavings as waste. Secondary waste produced is simply the small volume of fine metal shavings removed from the cut surface. Diamond wire sawing using CO{sub 2} cooling has been employed for cutting the reactor nozzles at San Onofre Unit 1 and at Connecticut Yankee. These carbon steel nozzles ranged up to 54 inch diameter with a 15 inch thick wall and an interior stainless cladding. Diamond wire sawing using traditional water cooling has been used to segment the reactor head at Rancho Seco and for cutting reactor nozzles and control rod drive tubes at Dairyland Power's Lacrosse BWR project. Advantages: - ALARA: All cutting is preformed remotely significantly reducing dose. Stringing of wires is accomplished using long handle tools. - Secondary waste is reduced to just the volume of material cut with the diamond wire. - The potential for airborne contamination is eliminated. Due to the flexibility of the wire, any access restrictions and interferences can be accommodated using pulleys and long handle tools. - The operation is quiet. Disadvantages: - With Liquid Carbon Dioxide cooling and cleaning, delivery of the material must be carefully planned. The longer the distance from the source to the cut area, the greater the chance for pressure drop and subsequent problems with line freezing. - Proper shrouding and ventilation are required for environmental reasons. In each case, the metal structures were cut at a precise location. Radiation dose was reduced significantly by operating the equipment from a remote location. The cuts were very smooth and completed on schedule. Each project must be analyzed individually and take into account many factors including access, radiological conditions, environmental conditions, schedule requirements, packaging requirements and size of cuts.

42 ENGINEERING↗

Advantages and applications of megawatt-sized heat-pipe reactors

Recently, worldwide interest in nuclear energy has focused on small reactors (10 to 300 MWe) to address emerging energy needs in remote locations. These designs are new to varying degrees but share similar approaches and common weaknesses with regard to primary heat rejection that differ little from reactor designs of the late 1950's. Here, an innovative concept, heat-pipe reactors, is discussed. The concept is unique in its simplicity and potential for safe, affordable, and reliable energy. Given the potential for reactors to meet worldwide energy needs and the pivotal role of heat rejection in overall reactor safety, the potential societal impact of this type of innovation is substantial. Heat-pipe-cooled, fast-spectrum reactors have been proposed for government applications requiring a robust, reliable, remotely controlled system with capacity much less than 1 MWe; however, they have not been designed for power ranges greater than 1 MWe. Los Alamos National Laboratory has initiated a study to design heat-pipe-cooled, fast-fission reactors and to generate a point design of a > 10-MWe-class machine suitable for next-generation compact reactors at remote locations. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Characterization and Time-Lapse Imaging of the Desiccation Treatability Test at the Hanford BC-Cribs and Trenches Site using High Performance Computing applied to Electrical Resistivity Imaging - 12271

Contaminated vadose zone materials are a potential source of long-term groundwater contamination at many sites across the Department of Energy (DOE) complex. Deep vadose zone contamination presents a particularly challenging remedial problem due to the difficultly of locating contaminants and the expense of access and ex situ treatment. In situ remediation techniques, whereby remedial amendments must be delivered to contaminated soils, have been identified as a potential alternative. However, amendment delivery is typically uncertain and post delivery remedial performance is often not well understood due to limited information available from sparsely spaced boreholes. Recent advancements in electrical resistivity tomography (ERT) are being used to address these challenges at the Hanford site by providing remote, three-dimensional images of contaminant distribution and four-dimensional (three spatial dimensions plus the time dimension) images of in-situ vadose zone remediation processes. These capabilities were recently demonstrated with a large scale surface characterization effort and during a smaller scale desiccation treatability test at the Hanford BC-Cribs area. The results of these efforts demonstrate the utility of leveraging high-performance computing resources to process ERT data for 3D reconnaissance mapping of subsurface contaminants and for detailed 3D monitoring of vadose zone remediation efforts. Two examples of ERT imaging at a former waste disposal facility have been demonstrated at different scales; a large scale reconnaissance survey spanning many hundreds of meters and a detailed monitoring application spanning a few tens of meters. Although ERT is applicable at many scales, resolution is generally governed by proximity to electrodes. For instance, the BCCT reconnaissance survey demonstrated herein lost resolution with depth (i.e. away from surface electrodes), and was unable to detect a high conductivity anomaly at approximately 75 m below ground surface in the cribs area; the deep anomalies were detected during highly focused borehole sampling. Conversely, the desiccation site characterization and monitoring demonstrated high resolution at a small scale, but only because of close proximity to survey electrodes. Although proximity to electrodes is not the only factor governing ERT resolution, it is often the primary factor for determining how an ERT system should be effectively deployed for a given application. Regardless of resolution limitations, the utility of ERT for remotely detecting wastes and monitoring subsurface processes is evident. ERT imaging is not a final detection or monitoring solution alone, but provides a necessary capability to remotely detect subsurface conditions and understand subsurface processes. Such a capability can significantly increase the efficacy and reduce the cost of remediation by guiding sampling efforts and informing remedial system design and operation. However, given the computational demands of 3D ERT characterization and monitoring inversions, the full imaging capability enabled by contemporary ERT survey systems can generally only be realized with high performance computing resources, both hardware and software. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of a Low Activity Beta-Sensitive SR{sup 90} Water Monitor for Fukushima

There are large volumes of contaminated water from the stabilization efforts at the damaged Fukushima Nuclear Power Plants. This water is being processed to remove radioactivity for eventual release to the environment. An on-line continuously operating system to confirm that the clean-up system is working properly, and to provide prompt feedback of the results is required by the system operator. While gamma emitting nuclides allow for the straight forward approach of gamma spectroscopy to identify and quantify radioactivity in water, pure beta emitting nuclides such as Sr{sup 90} pose a challenging problem. The relatively short range of beta radiation in water requires optimization of the measurement geometry in terms of the source-detector distance and source-detector interface while retaining a background sensitivity low enough to meet the Minimum Detectable Concentration (MDC) of 10 Bq/kg in 180 minutes. This issue is complicated by the continuum nature of the beta spectrum which does not allow for simple nuclide identification. The use of the Monte-Carlo code MCNP to estimate system performance before prototyping vastly increases the success of the end product. Various parameters such as detector size and thickness, water chamber size, water chamber construction materials were evaluated to help choose the optimum geometry. The final design was a system consisting of two large-area (16 x 35 cm) and thin (0.15 mm) plastic scintillators placed very close to a sealed a water chamber. The size of the chamber was optimized to obtain the maximum efficiency for the nuclide being measured (Sr/Y{sup 90}) but to minimize the efficiency for possible interferences (Ru/Rh{sup 106}, Cs{sup 137}). A thin carbon fiber window was selected with adequate material and thickness to contain the water under pressure, but also thin enough (0.5 mm) to allow enough beta radiation to pass through to the active detector volume. The entire measurement geometry is then housed in a thick lead shield to reduce contributions from external sources to an acceptable level. Data acquisition is accomplished through customized application-specific software that allows for long counting times to attain a low MDC, but also simultaneously provides alarms on short averaging times to achieve a fast response to sudden changes in activity concentration. Multiple monitors are then linked to supervisory software where real time data and alarms are available for analysis in remote locations. The system also allows for remote operation of the unit; check sources, background checks, systems settings and more may be accessed remotely. Testing of the production devices has shown that we can achieve the 10 Bk/kg MDC requirement for Sr{sup 90} in equilibrium with Y{sup 90} with a count time of approximately 20 minutes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the NPP A-1 heavy water management system - 15121

The paper deals with experience and techniques in the application of decontamination technology and remotely controlled robotic devices for the decontamination and dismantling of the heavy water management system during undergoing decommissioning process of the A-1 NPP as well as treatment of arising liquid waste All of these activities are characterized by high level of radioactivity and contamination. During operation of the A-1 NPP the heavy water management system fulfilled several functions: (1) cooling of the moderator, (2) topping up of the moderator in the active zone, (3) drainage, feed and storage of heavy water, (4) capture of leaked heavy water. Closely associated with heavy water management were systems for separation and isotopic purification of heavy water (distilling station, removing organic impurities station, isotopic purification station). The NPP heavy water system is located inside the power block building in several rooms where the inner surface contamination is up to the level of 10 E4 Bq.cm{sup -2}, dose rate up to 15,0 mGy.h{sup -1} and the feeding pipeline contained liquid RAW with high tritium content. Pre-dismantling decontamination of the heavy water management system and associated systems had to be performed with the intention of improving the radiation situation, i.e. reducing contamination of internal surface and dose rates in the vicinity of the equipment. Various sophisticated procedures such as retrieval of sludge using remotely operated devices and loop chemical decontamination of internal surfaces were applied. The generated radioactive waste such as spent decontamination solutions and sludge were immediately solidified on-site into a geo-polymer matrix using a mobile conditioning facility. For dismantling and fragmentation of some devices, mobile robotic systems MT80 and MT15 were applied which had been developed, designed and constructed as general-purpose decommissioning equipment. Special tooling was developed for application with the robots, such as hydraulic shears, circular saw, reciprocating saw, circular pipe cutter and a system for quick tool-change without direct intervention of the operators. Most of the operations are remotely controlled on basis of visual information from four cameras, with consistent radiation protection of the operators. The implementation of partial decommissioning tasks in such hard and unfavorable radiation conditions (moreover accompanied by generation of specific high-content alpha radwaste) has introduced in practice several new unique decontamination and dismantling techniques and new procedures for the effective on-site processing of generated secondary radioactive waste, including sludge and sorbents. These advantageous techniques, equipment and experience will be exploited in the continuation of the A-1 NPP decommissioning process which has been organized according to distinctively licensed phases and are also being applied in the decommissioning of other NPP in Slovakia as well as abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refine your search to explore more results.