Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Pumping Optimization Model for Pump and Treat Systems - 15091

Pump and Treat systems are being utilized to remediate contaminated groundwater in the Hanford 100 Areas adjacent to the Columbia River in Eastern Washington. Design of the systems was supported by a three-dimensional (3D) fate and transport model. This model provided sophisticated simulation capabilities but requires many hours to calculate results for each simulation considered. Many simulations are required to optimize system performance, so a two-dimensional (2D) model was created to reduce run time. The 2D model was developed as a equivalent-property version of the 3D model that derives boundary conditions and aquifer properties from the 3D model. It produces predictions that are very close to the 3D model predictions, allowing it to be used for comparative remedy analyses. Any potential system modifications identified by using the 2D version are verified for use by running the 3D model to confirm performance. The 2D model was incorporated into a comprehensive analysis system (the Pumping Optimization Model, POM) to simplify analysis of multiple simulations. It allows rapid turnaround by utilizing a graphical user interface that: 1 allows operators to create hypothetical scenarios for system operation, 2 feeds the input to the 2D fate and transport model, and 3 displays the scenario results to evaluate performance improvement. All of the above is accomplished within the user interface. Complex analyses can be completed within a few hours and multiple simulations can be compared side-by-side. The POM utilizes standard office computing equipment and established groundwater modeling software.

Baker, S.↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio – 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were “right-sized” at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Stewardship at a Former Uranium Mill Tailings Site in Riverton, Wyoming WM2017-17090

The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a downgradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment–water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies.

54 ENVIRONMENTAL SCIENCES↗

Research and Technology Development Activities to Address the DOE-EM Environmental Mercury Challenge

Human activities have altered trace metal distributions globally. This is especially true for the trace metal mercury (Hg), a pervasive global pollutant that can be methylated to form highly toxic methylmercury (MeHg), which bioaccumulates in aquatic food webs, endangering humans and other biota. Currently there are more than 3,000 mercury-contaminated sites identified worldwide and the United Nations Environment Programme has recently highlighted the risk of this contamination to human health [1, 2]. The Oak Ridge Reservation (ORR) represents an example of one of these mercury-contaminated sites. Unlike other contaminants metals, radionuclides, and organic solvents that impact the Department of Energy Office of Environmental Management (DOE-EM) cleanup program at the ORR and other DOE sites, mercury has several unique characteristics that make environmental remediation of the Y-12 National Security Complex one of the most formidable challenges ever encountered. These distinctive physicochemical properties for mercury include the following: it is a liquid at ambient temperature and pressure; it is the only metal that biomagnifies; and it is the only contaminant transported as a cation, as a dissolved or gaseous elemental metal (similar to an organic solvent), or as both a cation and a dissolved or gaseous elemental metal under environmental conditions. Because of these complexities, implementing cost effective and sustainable solutions that reduce mercury flux from various primary and secondary contamination sources will require linking basic science understanding and applied research advancements into Oak Ridge Office of Environmental Management s (OREM) cleanup process. Currently, DOE is investing in mercury-related research through a variety of programs, including the Office of Science sponsored Critical Interfaces Science Focus Area, EM headquarters sponsored Applied Field Research Initiative, OREM-sponsored Lower East Fork Poplar Creek (LEFPC) Mercury Technology Development Program, Small Business Innovative Research (SBIR), and EM s Minority Serving Institutions Partnership Program. Collectively, these multi-institutional and multidisciplinary programs are generating new tools, knowledge, and remediation approaches that will enable efficient cleanup of mercury contaminated systems locally and globally. In this talk we will highlight the progress made to date in addressing key knowledge gaps required to solve this watershed-scale conundrum.

Pierce, Eric M↗

Security Vulnerability and Patch Management in Electric Utilities: A Data-Driven Analysis

This paper explores a real security vulnerability and patch management dataset from an electric utility in order to shed light on characteristics of the vulnerabilities that electric utility assets have and how they are remediated in practice. Specifically, it first analyzes the distribution of vulnerabilities over software, assets, and other metric. Then it analyzes how vulnerability features affect remediate actions.

25 ENERGY STORAGE↗

The US DOE Office of Environmental Management International Program Collaboration - 11526

The DOE Office of Environmental Management (EM) carries out international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations’ nuclear weapons program and government sponsored nuclear energy research. The International Collaboration Program supported out of the EM Office of Technology Innovation and Development (OTID) pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In FY 2010, the program embarked on an expansion into the primary Office of Technology Innovation and Development R&D Program areas. Through OTID generated proposals and reviews, the International Collaboration Program awarded six contracts for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning and nuclear materials disposition initiatives to six foreign organizations. This paper will present an overview of the on-going tasks awarded in FY 2010 and an update of plans for FY 2011 and beyond.

2011↗

Effects of Cold Temperature and Main Compressor Intercooling on Recuperator and Recompression Cycle Performance

<span>This study investigates the effects of cold supercritical CO2 (sCO2) temperatures, compressor inlet pressures, and main compressor intercooling on the efficiency and specific power of recompression sCO2 cycles. Reducing the cold sCO2 temperature increases the compressor inlet density, thus reducing required compression power and increasing cycle thermal efficiency. &nbsp;Similarly, main compressor intercooling improves the specific power of a recompression cycle, reducing sCO2 mass flow, cycle size and cost for a given power output, though it is also shown to lead to an internal pinch point in the low temperature recuperator. Strategies for remediation of internal pinch points for recuperators as well as for the main CO2 cooler and the flue gas cooler are discussed, and apply to recompression cycles for all sCO2 applications.&nbsp; Upfront consideration of these remediation strategies is essential to determine attainable sCO2 cycle operating conditions and component sizing requirements.</span>

White, Chuck↗

ATLAS: Story Maps for Communicating Groundwater Cleanup Status – 18510

The U.S. Department of Energy (DOE) manages one of the largest groundwater cleanup efforts in the world in terms of the number of plumes, diversity of contaminants, volume of affected groundwater, and diversity of hydrogeologic settings. The DOE Office of Environmental Management (EM) has been collecting site-specific data on plume sizes, remedial approaches, exit strategies, long-term stewardship requirements, and regulatory drivers at all DOE sites, and summarizing them in a single document to communicate high-level information on groundwater contamination and cleanup status to DOE managers. Recently, EM has sponsored an effort to transfer the document-based information to an online resource for collating information on groundwater plumes that is easily accessible by interested parties. Specifically, Web GIS story maps have been developed to provide a robust geospatial visualization of plumes at DOE sites using an intuitive interface that allows users to explore plume maps, explanatory text, photographs, and video provided within the story maps. This collection of story maps is called ATLAS (Assembly of Tools for Learning Actions and Status), and not only communicates groundwater plume data for each individual site, but also summarizes pertinent metrics across all EM sites. With ATLAS, sites with similar settings, contamination, or remedial approaches can be easily identified, facilitating effective communication among DOE sites and sharing of individual successes and lessons learned.

Freedman, Vicky L.↗

Solid, hydrophobic aggregators and methods of making and using the same

Disclosed herein are aggregators that can be cellulosic particles having high oil sorption capacity, high hydrophobicity, high buoyancy in water, and an aggregation quality that can support environmental remediation of hydrocarbon spills (e.g., crude oil spills) by various cleanup strategies including burning, skimming, or bioremediation. Also disclosed are methods of making the materials and methods of using the materials for environmental remediation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Invite the Chaos Monkey: Test Effect Payloads for Tuning ICS Incident Response

In 2010, when Netflix moved their operational systems to the cloud, they developed a pseudo-random mechanism to cause deliberate outages and failures of key system elements to ensure that automated systems for detecting and remediating outages were mature and fully functional. This Chaos Monkey spawned an entire Simian Army designed to ensure system resilience and enable failure response before issues became outages. Through the DARPA RADICS program, Provatech, INL, and other researchers have developed a mechanism for creating controllable failures via Test Effect Payloads (TEPs) for Industrial Control Systems in order to enable an asset owner to tune network and process sensor technology, increase the effectiveness of incident response and remediation, and highlight areas where resilient technology could bring benefit to Operational Technology. This talk will explore what a TEP is, how to create a TEP, and suggest what a systematic system resilience plan using TEP’s might look like. We will also discuss how regulated entities might employ TEP’s in a compliant resilience strategy.

42 ENGINEERING↗

The Use of Subsurface Barriers to Support Treatment of Metals and Reduce the Flux of Tritium to Fourmile Branch at the Savannah River Site in South Carolina - 13358

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. Acidic groundwater plumes containing metals, metallic radionuclides, non-metallic radionuclides and tritium sourced from the F and H Area Seepage Basins have impacted the surface water of Fourmile Branch on SRS. Tritium releases from Fourmile Branch have impacted the water quality within areas of the Savannah River adjacent to the SRS, and this circumstance has been an ongoing regulatory concern. The F and H Area Seepage Basins operated until 1988 for the disposition of deionized acidic waste water from the F and H Separations Facilities. The waste water contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The tritium concentration in the waste water was relatively elevated because there is not a practicable removal method in water. The acid content of the waste water during the operational period of the basins was equal to 12 billion liters of nitric acid. The seepage basins were closed in 1988 and backfilled and capped by 1991. The plumes associated with the F and H basins cover an area of nearly 2.4 square kilometers (600 acres) and discharge along ∼2,600 meters of Fourmile Branch. The acidic nature of the plumes and their overall discharge extent along the branch represent a large challenge with respect to reducing contaminant flux to Fourmile Branch. The introduction of nitric acid into the groundwater over a long time effectively reduced the retardation of metal migration from the basins to the groundwater and in the groundwater to Fourmile Branch, because most negatively charged surfaces on the aquifer materials were filled with hydrogen ion. Two large pump and treat systems were constructed in 1997 and operated until 2003 in an attempt to capture and control the releases to Fourmile Branch. The operating cost, including waste disposal, for the two systems was ∼$1.3 M/month. Both systems employed reinjection of tritiated water up gradient of the extraction, and produced large quantities of waste from non-tritium isotopes and metals removal prior to reinjection. Both systems were determined to be ineffective and potentially detrimental with respect to limiting the flux of contaminants to Fourmile Branch. After it became apparent that there was very little benefit to continued operation of the systems, and the staggering cost of operations was recognized by the SRS and regulators, a new remedy was developed. The new system uses vertical subsurface barriers to redirect groundwater flow to limit the transport of contaminants to the stream. The barriers were constructed of acid resistant grout using deep soil mixing techniques. The grout mixture used low swelling clay, fly ash, and sodium hydroxide to form a pozzolana material with low permeability and low strength. The SRS and regulators agreed to a series of remedial goals, with the first goal to reduce tritium flux to the stream by 70% and bring constituents other than tritium to groundwater protection standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Decommissioning (ISD) Concepts and Approaches for Excess Nuclear Facilities Decommissioning End State - 13367

The United States Department of Energy (DOE) currently has numerous radiologically contaminated excess nuclear facilities waiting decommissioning throughout the Complex. The traditional decommissioning end state is complete removal. This commonly involves demolishing the facility, often segregating various components and building materials and disposing of the highly contaminated, massive structures containing tons of highly contaminated equipment and piping in a (controlled and approved) landfill, at times hundreds of miles from the facility location. Traditional demolition is costly, and results in significant risks to workers, as well as risks and costs associated with transporting the materials to a disposal site. In situ decommissioning (ISD or entombment) is a viable alternative to demolition, offering comparable and potentially more protective protection of human health and the environment, but at a significantly reduced cost and worker risk. The Savannah River Site (SRS) has completed the initial ISD deployment for radiologically contaminated facilities. Two reactor (P and R Reactors) facilities were decommissioned in 2011 using the ISD approach through the American Recovery and Reinvestment Act. The SRS ISD approach resolved programmatic, regulatory and technical/engineering issues associated with avoiding the potential hazards and cost associated with generating and disposing of an estimated 124,300 metric tons (153,000 m{sup 3}) of contaminated debris per reactor. The DOE Environmental Management Office of Deactivation and Decommissioning and Facility Engineering, through the Savannah River National Laboratory, is currently investigating potential monitoring techniques and strategies to assess ISD effectiveness. As part of SRS's strategic planning, the site is seeking to leverage in situ decommissioning concepts, approaches and facilities to conduct research, design end states, and assist in regulatory interactions in broad national and international government and private industry decommissioning applications. SRS offers critical services based upon the SRS experience in decommissioning and reactor entombment technology (e.g., grout formulations for varying conditions, structural and material sciences). The SRS ISD approach follows a systems engineering framework to achieve a regulatory acceptable end state based on established protocols, attains the final end state with minimal long stewardship requirements, protects industrial workers, and protects groundwater and the environment. The ISD systems engineering framework addresses key areas of the remedial process planning, technology development and deployment, and assessment to attain the ultimate goal of natural resource stewardship and protecting the public. The development and deployment of the SRS ISD approach has established a path for ISD of other large nuclear facilities in the United States and around the globe as an acceptable remedial alternative for decommissioning nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determination from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogeologic Modeling at the Sylvania Corning FUSRAP Site - 13419

A comparative groundwater hydrogeologic modeling analysis is presented herein to simulate potential contaminant migration pathways in a sole source aquifer in Nassau County, Long Island, New York. The source of contamination is related to historical operations at the Sylvania Corning Plant ('Site'), a 9.49- acre facility located at 70, 100 and 140 Cantiague Rock Road, Town of Oyster Bay in the westernmost portion of Hicksville, Long Island. The Site had historically been utilized as a nuclear materials manufacturing facility (e.g., cores, slug, and fuel elements) for reactors used in both research and electric power generation in early 1950's until late 1960's. The Site is contaminated with various volatile organic and inorganic compounds, as well as radionuclides. The major contaminants of concern at the Site are tetrachloroethene (PCE), trichloroethene (TCE), nickel, uranium, and thorium. These compounds are present in soil and groundwater underlying the Site and have migrated off-site. The Site is currently being investigated as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The main objective of the current study is to simulate the complex hydrogeologic features in the region, such as numerous current and historic production well fields; large, localized recharge basins; and, multiple aquifers, and to assess potential contaminant migration pathways originating from the Site. For this purpose, the focus of attention was given to the underlying Magothy formation, which has been impacted by the contaminants of concern. This aquifer provides more than 90% of potable water supply in the region. Nassau and Suffolk Counties jointly developed a three-dimensional regional groundwater flow model to help understand the factors affecting groundwater flow regime in the region, to determine adequate water supply for public consumption, to investigate salt water intrusion in localized areas, to evaluate the impacts of regional pumping activity, and to better understand the contaminant transport and fate mechanisms through the underlying aquifers. This regional model, developed for the N.Y. State Department of Environmental Conservation (NYSDEC) by Camp Dresser and McKee (CDM), uses the finite element model DYNFLOW developed by CDM, Cambridge, Massachusetts. The coarseness of the regional model, however, could not adequately capture the hydrogeologic heterogeneity of the aquifer. Specifically, the regional model did not adequately capture the interbedded nature of the Magothy aquifer and, as such, simulated particles tended to track down-gradient from the Site in relatively straight lines while the movement of groundwater in such a heterogeneous aquifer is expected to proceed along a more tortuous path. This paper presents a qualitative comparison of site-specific groundwater flow modeling results with results obtained from the regional model. In order to assess the potential contaminant migration pathways, a particle tracking method was employed. Available site-specific and regional hydraulic conductivity data measured in-situ with respect to depth and location were incorporated into the T-PROG module in GMS model to define statistical variation to better represent the actual stratigraphy and layer heterogeneity. The groundwater flow characteristics in the Magothy aquifer were simulated with the stochastic hydraulic conductivity variation as opposed to constant values as employed in the regional model. Contaminant sources and their exact locations have been fully delineated at the Site during the Remedial Investigation (RI) phase of the project. Contaminant migration pathways originating from these source locations at the Site are qualitatively traced within the sole source aquifer utilizing particles introduced at source locations. Contaminant transport mechanism modeled in the current study is based on pure advection (i.e., plug flow) and mechanical dispersion while molecular diffusion effects are neglected due to relatively high groundwater velocities encountered in the aquifer. In addition, fate of contaminants is ignored hereby to simulate the worst-case scenario, which considers the contaminants of concern as tracer-like compounds for modeling purposes. The results of the modeling analysis are qualitatively compared with the County's regional model, and patterns of contaminant migration in the region are presented. (authors)

54 ENVIRONMENTAL SCIENCES↗

Investigation on Microbial Dissolution of Uranium (VI) from Autunite Mineral - 13421

Precipitating autunite minerals by polyphosphate injection was identified as a feasible remediation strategy for sequestering uranium in contaminated groundwater and soil in situ at the Hanford Site. Autunite stability under vadose and saturated zone environmental conditions can help to determine the long-term effectiveness of this remediation strategy. The Arthrobacter bacteria are one of the most common groups in soils and are found in large numbers in Hanford soil as well as other subsurface environments contaminated with radionuclides. Ubiquitous in subsurface microbial communities, these bacteria can play a significant role in the dissolution of minerals and the formation of secondary minerals. The main objective of this investigation was to study the bacterial interactions under oxidizing conditions with uranium (VI); study the potential role of bicarbonate, which is an integral complexing ligand for U(VI) and a major ion in groundwater compositions; and present data from autunite dissolution experiments using Arthrobacter strain G968, a less U(VI)-tolerant strain. Sterile 100 mL glass mixed reactors served as the major bioreactor for initial experimentation. These autunite-containing bioreactors were injected with bacterial cells after the autunite equilibrated with the media solution amended with 0 mM, 3 mM 5 mM and 10 mM concentrations of bicarbonate. G968 Arthrobacter cells in the amount of 10{sup 6} cells/mL were injected into the reactors after 27 days, giving time for the autunite to reach steady state. Abiotic non-carbonate controls were kept without bacterial inoculation to provide a control for the biotic samples. Samples of the solution were analyzed for dissolved U(VI) by means of kinetic phosphorescence analyzer KPA-11 (Chemcheck Instruments, Richland, WA). Analysis showed that as [HCO{sub 3}{sup -}] increases, a diminishing trend on the effect of bacteria on autunite leaching is observed. Viability of cells was conducted after 24 hours of cell incubation with the appropriate uranium and bicarbonate concentration treatment. As expected, the cells started to reduce after day 41 due to the nutritional exhaustion of the media. Moreover, viable bacteria accounted for more than 94% in the presence of 10 mM bicarbonate. Experiments showed that despite differences between the G975 and the G968 bacterial strains resistance to U(VI), in the presence of bicarbonate ions they are able to dissolute uranium from autunite mineral at the same capacity. The effect of both bacterial strains on autunite dissolution is reduced as the concentration of bicarbonate increases while the increase in soluble U(VI) concentration induced by G968 and G975 is dwarfed, for larger [HCO{sub 3}{sup -}]. (authors)

54 ENVIRONMENTAL SCIENCES↗

Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245

In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates as an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development: From Idea to Implementation - 12131

There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be integrated into complicated flow sheets. Then fully informed decisions can be made to usher technology development ideas through project implementation. Examples from active technology development projects, Tank 48 Treatment and Enhanced Chemical Cleaning, are presented. This model for technology development integrates several tools and activities to provide a logical method for maturing new ideas and technologies. It provides a framework to develop a good idea into a full up design/build project. This model defines a set of integrated tasks to mature the technology and define scope, cost and schedule necessary to make business decisions for implementing technology development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refine your search to explore more results.