Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Performance Assurance Planning: Continuous Design-Level Performance of Each Energy Conservation Measure in a Utility Energy Service Contract is Fundamental to Achieving Projected Results

Design-level performance of each energy conservation measure (ECM) in an awarded utility energy service contract (UESC) is fundamental to achieving the projected results through the term of the contract and over the life of the measure. Because the authority for a UESC does not require contractual guarantees of energy, water, or cost savings, FEMP developed a protocol for emphasizing sustained performance to help ensure projected savings are realized. The information and templates offered within this paper reflect responsible project management and oversight, align with UESC best practices, and satisfy the conditions for annual scoring provided by the Office of Management and Budget (OMB). OMB memorandum M-12-21 requires, 'energy savings performance assurances,' 'measurement and verification (M&V) of savings through commissioning and retrocommissioing,' and 'competition or an alternatives analysis as part of the selection process.'

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SAFETY ANALYSIS REPORT FOR PACKAGING SHIELDING & NUCLEAR CRITICALITY SAFETY COURSES DEVELOPED AND CONDUCTED BY OAK RIDGE NATIONAL LABORATORY

The US Department of Energy (DOE) Packaging Certification Program, Office of Packaging and Transportation, is offering Safety Analysis Report for Packaging (SARP) Shielding and Nuclear Criticality Safety (NCS) courses for SARP generalists and analysts. The SARP generalist course is designed for project managers, supervisors, NCS/shielding subject matter experts (SME), and SMEs in non-NCS/shielding technical areas (e.g., structural, thermal, package design) who need to improve their understanding of how NCS/shielding analyses fit into the broader spectrum of SARP documentation. The generalist course provides an overview of the regulations and guidelines for the criticality and shielding analyses included in a SARP, and it illustrates how the NCS/shielding chapters integrate with the other parts of the SARP. After course material is presented, students in the generalist course will review an actual SARP document to examine key elements of the shielding and criticality analyses. The analyst course provides detailed instructions on the radioactive material package shielding analyses and NCS evaluation fundamentals needed by analysts/practitioners, including safety analysts and/or technical reviewers, to prepare and/or review technical analyses for SARP documentation. The analyst course also provides an overview of regulations and guidelines, in addition to detailed in-class exercises associated with package shielding and NCS analyses. Analysis teams will be faced with staged SARP examples in which several important decision processes in the generation of a SARP will be demonstrated and discussed. Both courses are offered at Oak Ridge National Laboratory, and for interested students, the analyst course is offered for one hour of graduate credit (course ME-690) from the University of Nevada at Reno. An overview of the course will be provided to ensure that the NCS community is aware of the course and its intent to support the shielding and NCS aspects of packaging and transportation analyses for SARP activities.

Bowen, Douglas G.↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the last in the series of test irradiations, Advanced Gas Reactor (AGR)-5/6/7, will begin at Idaho National Laboratory (INL) in approximately September 2020, but because of the complexity of the experiment preparations for the PIE are going to begin in FY2016. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities, providing technical input to the moisture furnace design, providing technical support for development of equipment and techniques for planned PIE evolutions, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Geothermal Data Repository: Ten Years of Supporting the Geothermal Industry with Open Access to Geothermal Data: Preprint

The Department of Energy's (DOE) Geothermal Data Repository (GDR) is celebrating its tenth anniversary! Over the last decade it has grown from the simple idea of storing public data in a centralized location to a valuable tool at the center of the US geothermal scientific community and an integral part of the DOE Geothermal Technologies Office (DOE GTO) project management strategy. Researchers funded by the DOE GTO have contributed over 1,300 data submissions to the GDR. These data have been used to further advancements in geothermal science, economic analysis, exploration, research, development, and operational efficiency. The adoption of open data methodologies and a data management strategy that prioritizes universal open access and standardized, interoperable data have further increased the value of GDR data, making them available across a distributed network of data sharing partners and improving their utility to other industries and related fields, including material science and space exploration. Incorporating feedback from users has been critical to the GDRs success, allowing it to grow over the years to meet the evolving needs of the geothermal community. This paper will explore some of many changes that occurred throughout the GDRs tenure and the lessons learned along the way, as well as highlight some of the new features and recent improvements that been implemented to support innovation, reduce duplication of effort, and advance the geothermal industry as a whole.

accessibility↗

Additional Analysis of Carbon Capture at Industrial Facilities

This poster provides summary cost details for a technoeconomic analysis of CO2 capture from flue gas generated by cement plants, conducted by U.S. Department of Energy National Energy Technology Laboratory and presented at the 2022 Carbon Management Project Review Meeting held in Pittsburgh, PA (August 15-19, 2022). A range of modern cement plant configurations was considered, along with different fuel types (coal, coke, and natural gas) and two levels of CO2 capture (95% and 99%). The sensitivity of capture cost to a range of modeling assumptions (such as fuel price, financing assumptions, utilization rate, and plant size) was also conducted, to show possible cost ranges that could be expected for decarbonization of typical cement plants in the U.S.

Hughes, Sydney↗

Overview of Carbon Conversion Life Cycle Analysis at NETL

A presentation providing an overview of the work the NETL life cycle analysis (LCA) team performs to support the U.S. DOE Carbon Conversion program, including the NETL CO2U LCA Guidance Toolkit and other LCA-related tasks. Presented at the 2022 Carbon Management Project Review Meeting in Pittsburgh, PA on August 15, 2022.

Krynock, Michelle↗

Numerical Simulation of Commercial-Scale CO2 Storage in a Saline Formation Evaluating Basin-Scale Pressure Interference and CO2 Plume Commingling

Presentation at NETL Carbon Management Project Review Meeting held in Pittsburgh, Pennsylvania, August 15–19, 2022. The presentation provides quantitative evaluation of subsurface pressure interference and emphasizes the importance of interproject coordination among stakeholders associated with multi-project geologic CO2 storage in a shared sedimentary basin.

Wijaya, Nur↗

Site Selection and Cost Estimation of Pilot-Scale CO2 Saline Storage Study in the Gulf of Mexico

Presentation at NETL Carbon Management Project Review Meeting held in Pittsburgh, Pennsylvania, August 15–19, 2022. The presentation provides a high-level overview of initial conceptual analysis evaluating site selection, geologic assessment, infrastructure, and project cost considerations associated with the development of pilot-scale CO2 storage projects in the offshore Gulf of Mexico.

Wijaya, Nur↗

LCA Tools Available at NETL

This presentation was given at the 2022 Carbon Management Project Review Meeting in Pittsburgh, PA. The presentation covered available and in progress tools that can help carbon capture projects perform environmental life cycle analyses (LCAs). The presentation also briefly covers working being performed by the NETL LCA team.

Jamieson, Matthew↗

Update of CO2_T_COM and CO2_S_COM Models (CO2 Transport and Storage Costs)

PowerPoint file for presentation made on August 18, 2022 at NETL's Carbon Management Project Review Meeting. The presentation provides an overview of updates and improvements to two techno-economic models. The FECM/NETL CO2 Transport Cost Model (CO2_T_COM) is a model for transport of liquid CO2 by pipeline. CO2_T_COM is a point to point pipeline model. FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM) is a model for storage of CO2 in deep saline geologic formations.

Morgan, David↗

Pathways to CO2 Utilization and Storage for the Intermountain West Region

The presentation, delivered at the 2022 Carbon Management Project Review Meeting held in Pittsburgh, PA (August 15 – 19, 2022), provides a detailed perspective on CO2 utilization and storage as a deep decarbonization pathway as it relates to states that make up the Intermountain West (I-WEST) region of the U.S. Content within shows findings from evaluation of the opportunity and potential value delivery that exists for CCUS to deploy at significant scale in the I-WEST region considering the region’s prominent enabling factors. This work is part of a larger initiative involving the development of a regional, stakeholder-informed technology “roadmap” for a sustainable and equitable transition to carbon neutral in the I-WEST.

Vikara, Derek↗

Application of Dimensionality Reduction in Machine Learning Modeling of CO2 Storage

In this study, we developed deep learning models that are capable of predicting spatio-temporal outputs of CO2 saturation, pressure, and brine production in a 3D saline storage reservoir over 30 years of continuous CO2 injection and a 50-year post-injection timeframe. To improve computational efficiency and maintain performance accuracy, the model framework involves ensembling multi-layer autoencoder networks that provide dimensionality reduction of geologic inputs with fully connected long short-term memory (LSTM) neural networks that generate time-series prediction. This study was presented as poster at the 2022 Carbon Management Project Review Meeting held in Pittsburgh, PA (August 15 – 19, 2022).

Bello, Kolawole↗

Direct Air Capture Case Studies: Sorbent System

Poster presentation of NETL's recently-published DAC sorbent case study results at the 2022 NETL Carbon Management Project Review Meeting held on August 15-19, 2022 in Pittsburgh, PA.

Fout, Timothy↗

Refine your search to explore more results.