Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Status of ERDA-DOD applications plans

A demonstration program is reported that defines solar terrestrial photovoltaic systems as power sources for DOD applications by developing requirements and implementation plans for each demonstration project. Evaluation criteria emphasize military market potential and military advantages.

Dinger, D. B.↗

Voyager Saturn encounter press briefing

The briefing reviewed the mission planning of the Voyager project. The near encounter trajectories of both Voyager spacecraft were examined. The Saturn system is discussed with particular emphasis on Saturn's moons.

Source record↗

Advanced digital SAR processing study

A highly programmable, land based, real time synthetic aperture radar (SAR) processor requiring a processed pixel rate of 2.75 MHz or more in a four look system was designed. Variations in range and azimuth compression, number of looks, range swath, range migration and SR mode were specified. Alternative range and azimuth processing algorithms were examined in conjunction with projected integrated circuit, digital architecture, and software technologies. The advaced digital SAR processor (ADSP) employs an FFT convolver algorithm for both range and azimuth processing in a parallel architecture configuration. Algorithm performace comparisons, design system design, implementation tradeoffs and the results of a supporting survey of integrated circuit and digital architecture technologies are reported. Cost tradeoffs and projections with alternate implementation plans are presented.

Martinson, L. W.↗

Large Deployable Reflector (LDR) - A concept for an orbiting submillimeter-infrared telescope for the 1990s

The history and background of the Large Deployable Reflector (LDR) are reviewed. The results of the June 1982 Asilomar (CA) workshop are incorporated into the LDR science objectives and telescope concept. The areas where the LDR may have the greatest scientific impact are in the study of star formation and planetary systems in the own and nearby galaxies and in cosmological studies of the structure and evolution of the early universe. The observational requirements for these and other scientific studies give rise to a set of telescope functional requirements. These, in turn, are satisfied by an LDR configuration which is a Cassegrain design with a 20 m diameter, actively controlled, segmented, primary reflector, diffraction limited at a wavelength of 30 to 50 microns. Technical challenges in the LDR development include construction of high tolerance mirror segments, surface figure measurement, figure control, vibration control, pointing, cryogenics, and coherent detectors. Project status and future plans for the LDR are discussed.

Swanson, P. N.↗

Report on final recommendations for IMPS engineering-science payload

Six general categories of key scientific and engineering concerns for the interactions measurements payload for shuttle (IMPS) mission are addressed: (1) dielectric charging; (2) material property changes; (3) electromagnetic interference, plasma interactions, and plasma wake effects associated with high-voltage solar arrays and large space structures; (4) radio frequency distortion and nonlinearities due to the enhanced plasma in the shuttle ram/wake; (5) shuttle glow and contamination; and (6) plasma interactions with the space-based radar. Lesser concerns are the interactions associated with EVA; the radiation and SEU effects peculiar to the auroral/polar cap environments; and space debris. The measurements needed to address the concerns associated with the general categories are described and a list of generic investigations capable of making the required measurements, emphasizing the spectrum of measurements necessary to quantize the interactions in the auroral/polar environments are included. A suggested ground-test plan for the IMPS project, a description of proposed follow-on IMPS missions, and a detailed bibliography for each of the interactions discussed are included.

Garrett, H. B.↗

Rotor performance characteristics from an aeroacoustic helicopter wind-tunnel test program

An investigation of helicopter rotor noise at model scale was conducted in the Langley 4 by 7 meter tunnel. The program described was the first of a planned three-phase project whose purpose was to examine the characteristic noise mechanism involved in main rotor/tail rotor interaction noise. This first phase was conducted with a main rotor only, in order to identify the characteristic noise generated by only the main rotor. The aerodynamic operating conditions of the rotor system were defined during the test. The acoustic data were properly referenced.

Hoad, D. R.↗

The library system of the DFVLR: Present status, planned reorganization, user possibilities

This paper gives an overview of the present status, planned alterations, and the scope of users of the DFVLR library, as well as a survey of library related activities outside of the library department. Attention is given to the tasks of the DFVLR which include research, assistance in planning and carrying out projects, and the construction and operation of large test installations, showing how they relate to demands on the library.

Sternemann, P.↗

Refine your search to explore more results.