Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Summary Report for the C50 Cryomodule Project

The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons that produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of PV performance models and their impact on project risk.

Photovoltaic systems are often priced in $/W{sub p}, where Wp refers to the DC power rating of the modules at Standard Test Conditions (1000 W/m{sup 2}, 25 C cell temperature) and $ refers to the installed cost of the system. However, the true value of the system is in the energy it will produce in kWhs, not the power rating. System energy production is a function of the system design and location, the mounting configuration, the power conversion system, and the module technology, as well as the solar resource. Even if all other variables are held constant, the annual energy yield (kWh/kW{sup p}) will vary among module technologies because of differences in response to low-light levels and temperature. Understanding energy yield is a key part of understanding system value. System performance models are used during project development to estimate the expected output of PV systems for a given design and location. Performance modeling is normally done by the system designer/system integrator. Often, an independent engineer will also model system output during a due diligence review of a project. A variety of system performance models are available. The most commonly used modeling tool for project development and due diligence in the United States is probably PVsyst, while those seeking a quick answer to expected energy production may use PVWatts. In this paper, we examine the variation in predicted energy output among modeling tools and users and compare that to measured output.

14 SOLAR ENERGY↗

Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project

The SuperB complex project aims at the construction of a very high luminosity (10{sup 36} cm{sup -2}s{sup -1}) asymmetric e{sup +}e{sup -} B-factory and a few X-ray synchrotron beam lines (SR). The project has been recently approved by the Italian Government as part of the National Research Plan. The Tor Vergata University location has been chosen and a Consortium among INFN, University of Rome II Tor Vergata and the Research Ministry is being signed, allowing for the constitution of the 'Cabibbo Laboratory', where the SuperB project will be hosted. This paper presents and describes the status of the preliminary design of the site layout, related issues for the chosen site and the preliminary ground motion (GM) measurement results.

43 PARTICLE ACCELERATORS↗

Mk12A/W78 ground test project (u)

The slides present the scope, objectives and status of the Mk12A1W78 Ground Test Project for the purpose of updating the ICBM Project Officers Group. In addition, project constraints and risks are discussed.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Solar For Schools: A Case Study in Identifying and Implementing Solar Photovoltaic (PV) Projects in Three California School Districts

The Department of Energy's (DOE) Solar America Showcase program seeks to accelerate demand for solar technologies among key end use market sectors. As part of this activity, DOE provides technical assistance through its national laboratories to large-scale, high-visibility solar installation projects. The Solar Schools Assessment and Implementation Project (SSAIP) in the San Francisco Bay Area was selected for a 2009 DOE Solar America Showcase award. SSAIP was formed through the efforts of the nonprofit Sequoia Foundation and includes three school districts: Berkeley, West Contra Costa, and Oakland Unified School Districts. This paper summarizes the technical assistance efforts that resulted from this technical assistance support. It serves as a case study and reference document detailing the steps and processes that could be used to successfully identify, fund, and implement solar photovoltaics (PV) projects in school districts across the country.

14 SOLAR ENERGY↗

Optimization of the Geometric Beta for the SSR2 Cavities of the Project X

Project X based on the 3 GeV CW superconducting Linac and is currently in the R&D phase. The CW SC Linac starts from a low-energy SCRF section (2.1 - 165 MeV) containing three different types of resonators. HWR f = 162.5 MHz (2.1 - 11 MeV) having beta= 0.11, SSR1 f = 325 MHz (11 - 35 MeV) having beta = 0.21. In this paper we present the analysis that lead to the final design of SSR2 f = 325 MHz cavity (35 - 165 MeV). We present the results of optimization of the geometric beta and the comparison between single, double and triple spoke resonators used in Project X frontend. A {beta} optimization has been carried out for the last spoke cavity section of Project X front end. The optimization process of {beta}{sub opt} for a single spoke resonator family SSR2 shown that {beta}{sub opt} = 0.47 looks better than the previous choice, which is {beta}{sub opt} = 0.4. This change can save some cavities and provide the same final energy for this section, 160 MeV. Single double and triple spoke resonator performances have been compared. The best option is the single spoke resonator SSR2 because the NTTF of a multi-spoke resonator is much narrower than a single one. In the energy range considered (40-160 MeV) the most efficient resonator is the single spoke one.

43 PARTICLE ACCELERATORS↗

Project X RFQ EM Design

Project X is a proposed multi-MW proton facility at Fermi National Accelerator Laboratory (FNAL). The Project X front-end would consist of an H- ion source, a low-energy beam transport (LEBT), a CW 162.5 MHz radio-frequency quadrupole (RFQ) accelerator, and a medium-energy beam transport (MEBT). Lawrence Berkeley National Laboratory (LBNL) and FNAL collaboration is currently developing the designs for various components in the Project X front end. This paper reports the detailed EM design of the CW 162.5 MHz RFQ that provides bunching of the 1-10 mA H- beam with acceleration from 30 keV to 2.1 MeV.

43 PARTICLE ACCELERATORS↗

Fuel Cycle Analysis Framework Base Cases for the IAEA/INPRO GAINS Collaborative Project

Thirteen countries participated in the Collaborative Project GAINS “Global Architecture of Innovative Nuclear Energy Systems Based on Thermal and Fast Reactors Including a Closed Fuel Cycle”, which was the primary activity within the IAEA/INPRO Program Area B: “Global Vision on Sustainable Nuclear Energy” for the last three years. The overall objective of GAINS was to develop a standard framework for assessing future nuclear energy systems taking into account sustainable development, and to validate results through sample analyses. This paper details the eight scenarios that constitute the GAINS framework base cases for analysis of the transition to future innovative nuclear energy systems. The framework base cases provide a reference for users of the framework to start from in developing and assessing their own alternate systems. Each base case is described along with performance results against the GAINS sustainability evaluation metrics. The eight cases include four using a moderate growth projection and four using a high growth projection for global nuclear electricity generation through 2100. The cases are divided into two sets, addressing homogeneous and heterogeneous scenarios developed by GAINS to model global fuel cycle strategies. The heterogeneous world scenario considers three separate nuclear groups based on their fuel cycle strategies, with non-synergistic and synergistic cases. The framework base case analyses results show the impact of these different fuel cycle strategies while providing references for future users of the GAINS framework. A large number of scenario alterations are possible and can be used to assess different strategies, different technologies, and different assumptions about possible futures of nuclear power. Results can be compared to the framework base cases to assess where these alternate cases perform differently versus the sustainability indicators.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation Energy Futures: Project Overview and Findings (Presentation)

The U.S. Department of Energy-sponsored Transportation Energy Futures (TEF) project examines how combining multiple strategies could reduce both GHG emissions and petroleum use by 80%. The project's primary objective was to help inform domestic decisions about transportation energy strategies, priorities, and investments, with an emphasis on previously underexplored opportunities related to energy efficiency and renewable energy in light-duty vehicles, non-light-duty vehicles, fuels, and transportation demand. This PowerPoint provides an overview of the project and its findings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Substrate comprising a nanometer-scale projection array

A method for forming a substrate comprising nanometer-scale pillars or cones that project from the surface of the substrate is disclosed. The method enables control over physical characteristics of the projections including diameter, sidewall angle, and tip shape. The method further enables control over the arrangement of the projections including characteristics such as center-to-center spacing and separation distance.

47 OTHER INSTRUMENTATION↗

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

high burnup, dry storage cask, final test plan, fu↗

Controlled cooling of an electronic system based on projected conditions

Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Project Summary (2012-2015) – Carbon Dynamics of the Greater Everglades Watershed and Implications of Climate Change

Carbon Dynamics of the Greater Everglades Watershed and Implications of Climate Change The objectives of this project are to: 1) quantify above- and below-ground carbon stocks of terrestrial ecosystems along a seasonal hydrologic gradient in the headwaters region of the Greater Everglades watershed; 2) develop budgets of ecosystem gaseous carbon exchange (carbon dioxide and methane) across the seasonal hydrologic gradient; 3) assess the impact of climate drivers on ecosystem carbon exchange in the Greater Everglades headwater region; and 4) integrate research findings with climate-driven terrestrial ecosystem carbon models to examine the potential influence of projected future climate change on regional carbon cycling. Note: this project receives a one-year extension past the original performance period - David Sumner (USGS) is not included in this extension.

Hinkle, Ross↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska

The Chariot site is located in the Ogotoruk Valley in the Cape Thompson region of northwest Alaska. Project Chariot was part of the Plowshare Program, created in 1957 by the US Atomic Energy Commission (AEC), a predecessor agency of the US Department of Energy (DOE), to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. AEC, with assistance from other agencies, conducted more than 40 pretest bioenvironmental studies of the Cape Thompson area between 1959 and 1962; however, the Plowshare Program work at the Project Chariot site (Figure 1) was cancelled because of strong public opposition [1]. No nuclear explosions were ever conducted at the site.

54 ENVIRONMENTAL SCIENCES↗

Controlled cooling of an electronic system based on projected conditions

Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Public Design Report for the Texas Clean Energy Project: Topical Report - Phase 1, June 2010-July 2011

Summit Texas Clean Energy, LLC (Summit) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin sub-bituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. Front-end Engineering and Design (FEED) commenced in June 2010 and was completed in July 2011, setting the design basis for entering into the detailed engineering phase of the project. During Phase 1, TCEP conducted and completed the FEED, applied for and received its air construction permit, provided engineering and other technical information required for development of the draft Environmental Impact Statement, and completed contracts for the sale of all of the urea and most of the CO 2 . Significant progress was made on the contracts for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine and the sale of electricity to CPS Energy, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site.

Mattes, Karl↗

A projection preconditioner for solving the implicit immersed boundary equations

This study presents a method for solving the linear semi-implicit immersed boundary equations which avoids the severe time step restriction presented by explicit-time methods. The Lagrangian variables are eliminated via a Schur complement to form a purely Eulerian saddle point system, which is preconditioned by a projection operator and then solved by a Krylov subspace method. From the viewpoint of projection methods, we derive an ideal preconditioner for the saddle point problem and compare the efficiency of a number of simpler preconditioners that approximate this perfect one. For low Reynolds number and high stiffness, one particular projection preconditioner yields an efficiency improvement of the explicit IB method by a factor around thirty. Substantial speed-ups over explicit-time method are achieved for Reynolds number below 100. In conclusion, this speedup increases as the Eulerian grid size and/or the Reynolds number are further reduced.

42 ENGINEERING↗

RAPID Toolkit Creates Smooth Flow Toward New Projects

Uncertainty about the duration and outcome of the permitting process has historically been seen as a deterrent to investment in renewable energy projects, including new hydropower projects. What if the process were clearer, smoother, faster? That's the purpose of the Regulatory and Permitting Information Desktop (RAPID) Toolkit, developed by the National Renewable Energy Laboratory (NREL) with funding from the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy and the Western Governors' Association. Now, the RAPID Toolkit is being expanded to include information about developing and permitting hydropower projects, with initial outreach and information gathering occurring during 2015.

13 HYDRO ENERGY↗

Refine your search to explore more results.