Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

The KSC Augmented/Virtual reality Lab

To investigate the new XR technologies that are coming onto the market, learn how they work, determine their strengths and weaknesses, and recommend potential applications of these technologies to the work we do at KSC, processing spacecraft, launch delivery systems, and ground support equipment.

XR↗

Highway Eco-Driving of an Electric Vehicle Based on Minimum Principle

The digital map in the on-board navigation system on passenger vehicles nowadays gives controllers access to detailed information of a planned route. Connected automated vehicles equipped with high computing power, are able to process data and leverage high control freedom available through automation. This paper proposes a fast optimization algorithm for eco-driving of electric vehicles in highway cruising scenarios. The algorithm is based on optimal control theory and takes into account road grades as well as state constraints imposed by speed limits and safe headway to the preceding car. Using Autonomie, the proposed algorithm is evaluated by simulating two example scenarios. The first result demonstrates an energy saving potential of 4.4%.

connected automated vehicle↗

Lifecycle Management of Nuclear Security Radiation Detection Systems: Testing and Evaluation

The lifecycle of radiation detection systems functioning within a State’s Nuclear Security Detection Architecture encompasses all activities associated with acquisition, deployment, and eventual disposal. Throughout a system’s lifecycle, testing and evaluation activities are needed to ensure requirements are continually met, as underscored by recent experiences.This paper provides:1.A discussion of reasons why testing should be part of the radiation detection equipment lifecycle before, during, and after acquisition.2.A general process for determining applicable evaluation methods.3.A discussion of issues related to integrating testing and evaluation into procurement and operational processes and mitigation strategies.

Harris, Tyrone↗

Computer simulation as a NOx reduction design tool

Nalco Mobotec engineers were charged with reducing emissions on a utility boiler converted from burning oil to eastern bituminous coal using the company's Rotamix selective noncatalytic reduction (SNCR) system which injects urea into the furnace. A CFD simulation of the existing boiler was first conducted and then the furnace was simulated with the SNCR system added and the design was optimised. Operating and capital costs were minimised by optimal placement of 50 injector ports. 6 figs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Modification of the Decontamination Facility at the Kruemmel NPP - 13451

In February 2009, Siempelkamp Nukleartechnik GmbH was awarded the contract for the design, manufacture, delivery and construction of a new Decontamination Facility in the controlled area for Kruemmel NPP. The new decontamination equipment has been installed according to the state of art of Kruemmel NPP. The existing space required the following modification, retrofitting and reconstruction works: - Demounting of the existing installation: to create space for the new facility it was necessary to dismantle the old facility. The concrete walls and ceilings were cut into sizes of no more than 400 kg for ease of handling. This enabled decontamination so largest possible amount could be released for recycling. All steel parts were cut into sizes fitting for iron-barred boxes, respecting the requirement to render the parts decontaminable and releasable. - Reconstructing a decontamination facility: Reconstruction of a decontamination box with separate air lock as access area for the decontamination of components and assemblies was conducted using pressurized air with abrasives (glass beads or steel shots). The walls were equipped with sound protection, the inner walls were welded gap-free to prevent the emergence of interstices and were equipped with changeable wear and tear curtains. Abrasive processing unit positioned underneath the dry blasting box adjacent to the two discharge hoppers. A switch has been installed for the separation of the glass beads and the steel shot. The glass beads are directed into a 200 l drum for the disposal. The steel shot was cleaned using a separator. The cleaned steel shot was routed via transportation devices to the storage container, making it available for further blasting operations. A decontamination box with separate air lock as access area for the decontamination of components and assemblies using high pressure water technology was provided by new construction. Water pressures between 160 bar and 800 bar can be selected. The inner walls are welded gap-free and all rough edges are rounded off. All wetted parts are steel grade 1.4301 or higher. In an extension to the high pressure water decontamination box, 2 ultrasonic ponds and one washing station for small components as provide by new construction. A long pond with 3.25 m length for the decontamination of large components (e.g. turbine blades, pump rotors, driving rods) was installed. For the handling heavy components, a 2 t crane was installed. New construction of a mechanical effluent treatment facility including oil separator was connected to the existing effluent storage tank provided by the customer. One exhaust air filtration system is provided for each decontamination box, with the following requirements. The exhaust air is sent back to the room (recirculated air system). Dry blasting box including raw separator with dust collection in 200 l drum, filter for suspended particles; High pressure water decontamination box and wet area with water separator, pre-separator, filter for suspended particles. Installation of a steel platform at building height +12.85 above the decontamination boxes + 8.50 m for the erection of the high pressure water facilities, the recirculating air filter system, the air compressor and the respiratory air supply unit. The aforementioned components are placed on the steel platform and have been encased in a sound-lowering and accessible manner. New construction of the entire E and C technology for the TU system including modification of the supply lines from the switch gear. All devices are to be operated automatically. Dry blasting box, high pressure water decontamination box and wet area are designed to guarantee a unitary 'exterior view' of the decontamination facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exception Handling Controllers: An application of pushdown systems to discrete event control

Recent work by the author has extended the Supervisory Control Theory to include the class of control languages defined by pushdown machines. A pushdown machine is a finite state machine extended by an infinite stack memory. In this paper, we define a specific type of deterministic pushdown machine that is particularly useful as a discrete event controller. Checking controllability of pushdown machines requires computing the complement of the controller machine. We show that Exception Handling Controllers have the property that algorithms for taking their complements and determining their prefix closures are nearly identical to the algorithms available for finite state machines. Further, they exhibit an important property that makes checking for controllability extremely simple. Hence, they maintain the simplicity of the finite state machine, while providing the extra power associated with a pushdown stack memory. We provide an example of a useful control specification that cannot be implemented using a finite state machine, but can be implemented using an Exception Handling Controller.

42 ENGINEERING↗

AN OVERVIEW OF BIOFUELS PROCESS DEVELOPMENT IN SOUTH CAROLINA

The South Carolina Bio-Energy Research Collaborative is working together on the development and demonstration of technology options for the production of bio-fuels using renewable non-food crops and biomass resources that are available or could be made available in abundance in the southeastern United States. This collaboration consists of Arborgen LLC, Clemson University, Savannah River National Laboratory, and South Carolina State University, with support from Dyadic, Fagen Engineering, Renewed World Energies, and Spinx. Thus far, most work has centered on development of a fermentation-based process to convert switchgrass into ethanol, with the concomitant generation of a purified lignin stream. The process is not feed-specific, and the work scope has recently expanded to include sweet sorghum and wood. In parallel, the Collaborative is also working on developing an economical path to produce oils and fuels from algae. The Collaborative envisions an integrated bio-fuels process that can accept multiple feedstocks, shares common equipment, and that produces multiple product streams. The Collaborative is not the only group working on bio-energy in South Carolina, and other companies are involved in producing biomass derived energy products at an industrial scale.

09 BIOMASS FUELS↗

Common-Cause Failure Treatment in Event Assessment: Basis for a Proposed New Model

Event assessment is an application of probabilistic risk assessment in which observed equipment failures and outages are mapped into the risk model to obtain a numerical estimate of the event’s risk significance. In this paper, we focus on retrospective assessments to estimate the risk significance of degraded conditions such as equipment failure accompanied by a deficiency in a process such as maintenance practices. In modeling such events, the basic events in the risk model that are associated with observed failures and other off-normal situations are typically configured to be failed, while those associated with observed successes and unchallenged components are assumed capable of failing, typically with their baseline probabilities. This is referred to as the failure memory approach to event assessment. The conditioning of common-cause failure probabilities for the common cause component group associated with the observed component failure is particularly important, as it is insufficient to simply leave these probabilities at their baseline values, and doing so may result in a significant underestimate of risk significance for the event. Past work in this area has focused on the mathematics of the adjustment. In this paper, we review the Basic Parameter Model for common-cause failure, which underlies most current risk modelling, discuss the limitations of this model with respect to event assessment, and introduce a proposed new framework for common-cause failure, which uses a Bayesian network to model underlying causes of failure, and which has the potential to overcome the limitations of the Basic Parameter Model with respect to event assessment.

99 GENERAL AND MISCELLANEOUS↗

FABRICATION OF URANIUM OXYCARBIDE KERNELS AND COMPACTS FOR HTR FUEL

As part of the program to demonstrate tristructural isotropic (TRISO)-coated fuel for the Next Generation Nuclear Plant (NGNP), Advanced Gas Reactor (AGR) fuel is being irradiation tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). This testing has led to improved kernel fabrication techniques, the formation of TRISO fuel particles, and upgrades to the overcoating, compaction, and heat treatment processes. Combined, these improvements provide a fuel manufacturing process that meets the stringent requirements associated with testing in the AGR experimentation program. Researchers at Idaho National Laboratory (INL) are working in conjunction with a team from Babcock and Wilcox (B&W) and Oak Ridge National Laboratory (ORNL) to (a) improve the quality of uranium oxycarbide (UCO) fuel kernels, (b) deposit TRISO layers to produce a fuel that meets or exceeds the standard developed by German researches in the 1980s, and (c) develop a process to overcoat TRISO particles with the same matrix material, but applies it with water using equipment previously and successfully employed in the pharmaceutical industry. A primary goal of this work is to simplify the process, making it more robust and repeatable while relying less on operator technique than prior overcoating efforts. A secondary goal is to improve first-pass yields to greater than 95% through the use of established technology and equipment. In the first test, called “AGR-1,” graphite compacts containing approximately 300,000 coated particles were irradiated from December 2006 to November 2009. The AGR-1 fuel was designed to closely replicate many of the properties of German TRISO-coated particles, thought to be important for good fuel performance. No release of gaseous fission product, indicative of particle coating failure, was detected in the nearly 3-year irradiation to a peak burn up of 19.6% at a time-average temperature of 1038–1121°C. Before fabricating AGR-2 fuel, each fabrication process was improved and changed. Changes to the kernel fabrication process included replacing the carbon black powder feed with a surface-modified carbon slurry and shortening the sintering schedule. AGR-2 TRISO particles were produced in a 6-inch diameter coater using a charge size about 21-times that of the 2-inch diameter coater used to coat AGR-1 particles. The compacting process was changed to increase matrix density and throughput by increasing the temperature and pressure of pressing and using a different type of press. AGR-2 fuel began irradiation in the ATR in late spring 2010.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Model Package Report: Composite Analysis Solid Waste Release Model (CASWR Model)

This document describes the implementation of a solid waste form release model in GoldSim for the Hanford Site Composite Analysis (CA) Update. This Composite Analysis Solid Waste Release model (CASWR model) was designed to generate deterministic radionuclide release rates for Hanford’s Central Plateau solid waste disposal sites using single realizations of release model coefficients. Five generalized waste form types are used for the conceptual model of waste release: surplus reactor block, cement, soil-debris, grouted residual waste, and ancillary equipment. The surplus reactor block waste form consists of radionuclide leaching from surplus production graphite reactor core blocks via unspecified processes (White et al., 1984 as cited in PNNL-15965). The cement waste form represents solidified wastes whose permeability is much lower than that of the surrounding soil. The soil-debris waste form type is defined as unconsolidated waste mixed with soil material. Tanks and canyon complexes comprise the grouted residual waste form such that their solid waste will be grouted and capped with a surface barrier at the completion of their cleanup. Finally, the ancillary equipment waste form constitutes contaminant releases from ancillary and auxiliary waste form residues associated with tank farms at closure. Individual sub-models are implemented to numerically represent a respective waste form within the CASWR Model: Surplus Reactor Block Sub-model, Cement Sub-model, SoilDebris Sub-model, Grouted Residual Waste Sub-model, and Ancillary Equipment Submodel. Advection is assumed to be the primary transport process governing the release of radionuclides in the Ancillary Equipment and Soil-Debris Sub-models. Diffusion is assumed to be the primary release process in the Grouted Residual Waste and Cement Sub-models. An unspecified zero-order release process is considered in the Surplus Reactor Block Sub-model due to the lack of information regarding actual processes involved in irradiated graphite leaching. The Surplus Reactor Block, Cement, and SoilDebris Sub-models were compared against analytical solutions (PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site). The agreement between results of these analytical solutions and the corresponding waste form models verified their correct implementation in GoldSim. A 1-D modeling abstraction approach for the Grouted Residual Waste and Ancillary Equipment Sub-models was adopted from existing Performance Assessment (PA) models. Despite the simplifications made in these sub-models, they were found to be appropriate representations of the waste forms, similar to what was used in the Waste Management Area C PA model (RPP-ENV-58782, Performance Assessment of Waste Management Area C, Hanford Site, Washington, Rev. 0). A sensitivity analysis was conducted to identify the most influential parameters in each waste form sub-model. Suggestions for considering pH-dependent and redox-dependent release mechanisms are formulated through the development of a conditional constant approach in GoldSim.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solid Rocket Booster (SRB) - Evolution and Lessons Learned During the Shuttle Program

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Obsolescence issues occasionally required component recertification. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. Assembly and integration of the booster subsystems was a unique process and acceptance testing of reused hardware components was required for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Kanner, Howard S.↗

Solid Rocket Booster (SRB) Flight System Integration at Its Best

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges and technical issues, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Wood, T. David↗

Automated Space Processing Payloads Study. Volume 1: Executive Summary

An investigation is described which examined the extent to which the experiment hardware and operational requirements can be met by automatic control and material handling devices; payload and system concepts are defined which make extensive use of automation technology. Topics covered include experiment requirements and hardware data, capabilities and characteristics of industrial automation equipment and controls, payload grouping, automated payload conceptual design, space processing payload preliminary design, automated space processing payloads for early shuttle missions, and cost and scheduling.

Source record↗

Supporting Electric Vehicle Supply Equipment Deployment

FEMP assists federal agencies with the transition to zero-emission vehicles (ZEVs) by offering technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams. This fact sheet introduces the EVSE Tiger Team site assessment and technical assistance process.

ADVANCED PROPULSION SYSTEMS↗

Radiometric characterization process for locating radioactivity hold-up and measuring non-uniformly distributed sources - 15342

A novel approach to facility radiometric characterization for non-uniformly distributed radiation sources has been developed by ANTECH and is currently being employed at the Argonne National Laboratory. It is being applied to the measurement of a wide range of objects and the interiors and contents of laboratories and buildings. The integrated non destructive assay measurement process involves the use of a scanning spectroscopic gamma ray camera as well as high purity Germanium detectors with different collimators and hence differing detector fields of view to measure and quantify non-uniformly distributed sources of radioactivity in laboratory equipment, glove boxes, storage tanks, pipework and general laboratory objects and process components. The purpose of the radiometric characterization is to quantify radiation sources and radioactive contamination levels in facilities containing nuclear material and to ensure compliance with facility characterization requirements and for decontamination and decommissioning planning and execution. The integrated measurement process also involves automated data capture and processing software and a database with which both measurement instrument operators and subject matter expert analysts can interact. An appropriate measuring instrument (gamma camera, scintillation detector, high purity Germanium detector system, neutron detector or alpha-beta counter) records the measurement data and the measurement site is recorded in a photograph. All of the data relevant to the measurement (or set of measurements for a particular object) are recorded in the database including measured gamma ray spectra, equipment description and relevant calibration, measurement site photograph and measurement descriptive data. Once data analysis protocols are established for specific geometries and measurement situations they can be applied to the measured data in a partially automated manner, reducing analysis and transcription errors. In addition to measurements and data analysis the process also utilises radiometric modelling computer codes including MicroShield and Monte Carlo Neutrons Photons in order to perform model calculations where appropriate. In a typical measurement, the ANTECH RadSearch spectroscopic gamma camera is utilized to find areas of concentrated activity so that these areas can be measured and calculated separately from areas with diffuse contamination. The use of the gamma camera in scanning mode helps to ensure that the assay does not overestimate the detected radiation source, which is a frequent consequence of using standard far field geometry and attenuation analysis codes that assume uniformity of both density and radioactive source distribution. Once the hot spots are identified, high purity Germanium detector measurements are made using various collimators with wide or narrow fields of view as required. These measurements are then processed through a semi-automatic calculation process assuming an appropriate source configuration as identified by RadSearch. These source configurations include point sources, line sources or surface sources. The Generalized Geometry Hold-up algorithms are employed to determine an estimate of the activity of the various sources that are identified in a measurement. The ANTECH integrated measurement process provides an automated calculation procedure where the analyst can select the source type, geometry and appropriate input data, and then the software calculates the activity by radionuclide for all sources identified in the measurement. The measurement and analysis process is controlled under the ANTECH ISO9001: 2008 Quality Assurance System and managed by a site specific Quality Assurance Plan. Both Argonne National Laboratory and Department of Energy technical reviewers have vetted the Integrated Measurement and Analysis Process. The application of the measurement and analysis process is described and measurement examples are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment-including the habitat-would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Architecture 5.0. More recent work, dubbed the Evolvable Mars Campaign (EMC), explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat-the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of a modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Refine your search to explore more results.