Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

pvOps: a Python package for empirical analysis of photovoltaic field data

The purpose of pvOps is to support empirical evaluations of data collected in the field related to the operations and maintenance (O&M) of photovoltaic (PV) power plants. pvOps presently contains modules that address the diversity of field data, including text-based maintenance logs, current-voltage (IV) curves, and timeseries of production information. The package functions leverage machine learning, visualization, and other techniques to enable cleaning, processing, and fusion of these datasets. These capabilities are intended to facilitate easier evaluation of field patterns and extraction of relevant insights to support reliability-related decision-making for PV sites. The open-source code, examples, and instructions for installing the package through PyPI can be accessed through the GitHub repository.

14 SOLAR ENERGY↗

Practical procedures for sensor quality assessment

Sensors are increasingly deployed for process monitoring and control. These produce on-line measurements at a high frequency, in parallel with low-frequency laboratory measurements. Compared to laboratory practices, sensor data quality assessment and control practices are far less structured at most utilities. This leads to inaccurate sensor data with unknown uncertainty factors.This chapter shows how to establish standard operating procedures (SOPs) to support sensor data quality assessment and control and subsequent maintenance actions by producing relevant sensor metadata. Furthermore, SOPs are provided for the most commonly used wastewater quality sensors, inspired by utility and academic best practices. This chapter builds on definitions provided in Chapter 3 and provides additional definitions specifically related to sensors maintenance. Chapter 6 complements the methods in this chapter, which are based on reference measurements, with data-analytical techniques.

Alferes, Janelcy↗

Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.

99 GENERAL AND MISCELLANEOUS↗

Coca-Cola Refreshments Class 8 Diesel Electric Hybrid Tractor Evaluation: 13-Month Final Report

This 13-month evaluation used five Kenworth T370 hybrid tractors and five Freightliner M2106 standard diesel tractors at a Coca Cola Refreshments facility in Miami, Florida. The primary objective was to evaluate the fuel economy, emissions, and operational field performance of hybrid electric vehicles when compared to similar-use conventional diesel vehicles. A random dispatch system ensures the vehicles are used in a similar manner. GPS logging, fueling, and maintenance records and laboratory dynamometer testing are used to evaluate the performance of these hybrid tractors. Both groups drive similar duty cycles with similar kinetic intensity (0.95 vs. 0.69), average speed (20.6 vs. 24.3 mph), and stops per mile (1.9 vs. 1.5). The study demonstrated the hybrid group had a 13.7% fuel economy improvement over the diesel group. Laboratory fuel economy and field fuel economy study showed similar trends along the range of KI and stops per mile. Hybrid maintenance costs were 51% lower per mile; hybrid fuel costs per mile were 12% less than for the diesels; and hybrid vehicle total cost of operation per mile was 24% less than the cost of operation for the diesel group.

02 PETROLEUM↗

Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

The U.S. Department of Energy is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr to a much larger figure nationally. Most of the energy savings in this application is attributable to the instant-restrike capability of LED products and to their high tolerance for frequent on/off switching, used here to separately control either end of the tunnel during daytime hours. Some LED luminaires rival or outperform their high-intensity discharge (HID) counterparts in terms of efficacy, but options are limited, and smaller lumen packages preclude true one-for-one equivalence. However, LED products continue to improve in efficacy and affordability at a rate unmatched by other light source technologies; the estimated simple payback period of 20 years (excluding installation costs and maintenance savings) can be expected to improve with time. The proposed revisions to the existing high-pressure sodium (HPS) lighting system would require slightly increased controls complexity and significantly increased luminaire types and quantities. In exchange, substantial annual savings (from reduced maintenance and energy use) would be complemented by improved quantity and quality of illumination. Although advanced lighting controls could offer additional savings, it is unclear whether such a system would prove cost-effective; this topic may be explored in future work.

Baker-Barry Tunnel↗

Fukushima Daiichi accident study: status as of April 2012

Japan suffered an immense tragedy as a result of the 2011 Tohuku earthquake and resulting tsunami that caused widespread damage to the infrastructure of the country and more than 20,000 deaths, most from the tsunami. The magnitude 9 (Mw)1 earthquake, centered roughly 20 miles deep and 43 miles east of Japan, took place at 14:46 (JST) on March 11, 2011, and produced catastrophic damage to buildings, roads, communications, and regional electrical power. Damage to the Sendai region was especially large owing to its proximity to the epicenter of the seismic event that produced a tsunami with an estimated height that exceeded 14 meters at the site of the Fukushima reactors. The earthquake at 14:46 JST resulted in a scram and a regional loss of electrical power, requiring the Fukushima Daiichi power plants (Units 1, 2, and 3) to start emergency on-site diesel powered generators to maintain cooling at the plants. Unit 4 was defueled at the time for maintenance, and Units 5 and 6 were in a state of cold shutdown for maintenance.

Gauntt, Randall O.↗

Technical Feasibility Assessment of LED Roadway Lighting on the Golden Gate Bridge

Subsequent to preliminary investigations by the Golden Gate Bridge Highway & Transportation District (GGB), in coordination with Pacific Gas & Electric (PG&E), the GATEWAY Demonstration program was asked to evaluate the technical feasibility of replacing existing roadway lighting on the bridge with products utilizing LED technology. GGB and PG&E also indicated interest in induction (i.e., electrodeless fluorescent) technology, since both light source types feature rated lifetimes significantly exceeding those of the existing high-pressure sodium (HPS) and low-pressure sodium (LPS) products. The goal of the study was to identify any solutions which would reduce energy use and maintenance without compromising the quantity or quality of existing illumination. Products used for roadway lighting on the historic bridge must be installed within the existing amber-lensed shoebox-style luminaire housings. It was determined that induction technology does not appear to represent a viable alternative for the roadway luminaires in this application; any energy savings would be attributable to a reduction in light levels. Although no suitable LED retrofit kits were identified for installation within existing luminaire housings, several complete LED luminaires were found to offer energy savings of 6-18%, suggesting custom LED retrofit kits could be developed to match or exceed the performance of the existing shoeboxes. Luminaires utilizing ceramic metal halide (CMH) were also evaluated, and some were found to offer 28% energy savings, but these products might actually increase maintenance due to the shorter rated lamp life. Plasma technology was evaluated, as well, but no suitable products were identified. Analysis provided in this report was completed in May 2012. Although LED technologies are expected to become increasingly viable over time, and product mock-ups may reveal near-term solutions, some options not currently considered by GGB may ultimately merit evaluation. For example, it would be preferable in terms of performance to simply replace existing luminaires (some of which may already be nearing end of life) with fully-integrated LED or CMH luminaires rather than replacing internal components. Among other benefits, this would allow reputable manufacturers to offer standard warranties for their products. Similarly, the amber lenses might be reformulated such that they do not render white light sources in a greenish cast, thereby allowing the use of off-the-shelf LED or CMH products. Last, it should be noted that the existing amber-lensed shoeboxes bear no daytime resemblance to the LPS luminaires originally used to light the roadway.

ceramic metal halide↗

Verification test suite for systems analysis tools

This report documents strategies and test problems to support Verification and Validation (V&V) of the systems analysis tools currently being developed under the Reactor Product Line (RPL) of DOE’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. A suite of verification test cases has been developed. This test suite supports development of new codes as well as maintenance of existing codes. For advanced tools that are under development like RELAP-7 for light water reactor analysis [1] and the MOOSE based component models for SFR (M-SFR) analyses [2], verification of simulation results must be performed throughout the entire development phase. This test suite is also useful for established codes as part of automated testing to ensure that general code maintenance does not change existing results.

Sumner, T.↗

Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling.

Advanced Small Modular Reactor↗

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

Next Generation Robust Low Noise Seismometer for Nuclear Monitoring

Implementation of the proposed seismometers turned out to be much more challenging than anticipated. The noise levels achieved are indeed well below those ever featured by any electrochemical sensor and just very nearly miss reaching the original objectives. However, while noise-wise the instruments could still prove their usefulness, especially considering their robustness and no-maintenance operation, the implementation of the proposed noise-reduction concept resulted in much larger and heavier devices than originally expected. Moreover, these large dimensions relate only to single-component vertical sensors. While building similar horizontal component is possible, the resulting three-component instrument would be way too large and heavy to be of any practical use. The prototype instruments developed and built retained the inherent advantages of the electrochemical seismometers: no maintenance operation; ability to perform with large installation tilts; and, unfortunately, to a much lesser extent in terms of robustness.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Computer Modeling and Analysis of Truck Generated Salt-Spray Transport Near Bridges

Bridge painting is very expensive. Over the lifetime of a bridge, painting to protect the steel from the elements can cost a large fraction of the original construction cost. In addition to monetary costs, maintenance workers face health risks if strict procedures are not in place to avoid exposure to hazardous dust when old paint is removed and the fumes of hazardous chemicals when new paint is applied. Use of weathering steel in bridge construction avoids the large cost of periodic painting and the hazards of paint removal and repainting because this type of steel is never painted. When exposed to weather, the initial corrosion of weathering steel forms a natural corrosion resistant layer that prevents further corrosion under a wide variety of conditions. Given the advantages of using weathering steel, the choice might appear to be obvious. However, the large potential savings in bridge maintenance costs in using weathering steel are not always realized because the protective patina layer fails to adhere when the steel is exposed to excessively salt-laden and moisture-laden environments. A multi-year study is underway by the FHWA to better quantify the conditions that lead to excessive corrosion in weathering steel bridges. This report documents work using computational fluid dynamics (CFD) analysis to study the conditions and mechanisms that lead from the salt spray thrown from truck tires to salt water droplets reaching bridge girders. Computer simulations use the advanced motion modeling capability called a “sliding mesh” in the CFD software to move one or more large trucks under bridges at 60 mph. The computations include multiphase spray droplet tracking of salt-laden water droplets coming off the tires.

Lottes, S. A.↗

Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses (2012 Annual Summary Report)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (RD) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and RD activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and RD results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and RD activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term RD efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Combined Cyclone and Gas Filtration System for Particulate Removal in the Gasification Process

The Wabash gasification facility, owned and operated by sgSolutions LLC, is one of the largest single train solid fuel gasification facilities in the world capable of transforming 2,000 tons per day of petroleum coke or 2,600 tons per day of bituminous coal into synthetic gas for electrical power generation. The Wabash plant utilizes Phillips66 proprietary E-Gas™ Gasification Process to convert solid fuels such as petroleum coke or coal into synthetic gas that is fed to a combined cycle combustion turbine power generation facility. During plant startup in 1995, reliability issues were realized in the gas filtration portion of the gasification process. To address these issues, a slipstream test unit was constructed at the Wabash facility to test various filter designs, materials and process conditions for potential reliability improvement. The char filtration slipstream unit provided a way of testing new materials, maintenance procedures, and process changes without the risk of stopping commercial production in the facility. It also greatly reduced maintenance expenditures associated with full scale testing in the commercial plant. This char filtration slipstream unit was installed with assistance from the United States Department of Energy (built under DOE Contract No. DE-FC26-97FT34158) and began initial testing in November of 1997. It has proven to be extremely beneficial in the advancement of the E-Gas™ char removal technology by accurately predicting filter behavior and potential failure mechanisms that would occur in the commercial process. After completing four (4) years of testing various filter types and configurations on numerous gasification feed stocks, a decision was made to investigate the economic and reliability effects of using a particulate removal gas cyclone upstream of the current gas filtration unit. A paper study had indicated that there was a real potential to lower both installed capital and operating costs by implementing a char cyclone-filtration hybrid unit in the E-Gas™ gasification process. These reductions would help to keep the E-Gas™ technology competitive among other coal-fired power generation technologies. The Wabash combined cyclone and gas filtration slipstream test program was developed to provide design information, equipment specification and process control parameters of a hybrid cyclone and candle filter particulate removal system in the E-Gas™ gasification process that would provide the optimum performance and reliability for future commercial use. The test program objectives were as follows: 1. Evaluate the use of various cyclone materials of construction; 2. Establish the optimal cyclone efficiency that provides stable long term gas filter operation; 3. Determine the particle size distribution of the char separated by both the cyclone and candle filters. This will provide insight into cyclone efficiency and potential future plant design; 4. Determine the optimum filter media size requirements for the cyclone-filtration hybrid unit; 5. Determine the appropriate char transfer rates for both the cyclone and filtration portions of the hybrid unit; 6. Develop operating procedures for the cyclone-filtration hybrid unit; and, 7. Compare the installed capital cost of a scaled-up commercial cyclone-filtration hybrid unit to the current gas filtration design without a cyclone unit, such as currently exists at the Wabash facility.

01 COAL, LIGNITE, AND PEAT↗

Experimental Development and Demonstration of Ultrasonic Measurement Diagnostics for Sodium Fast Reactor Thermal-hydraulics

This research project will address some of the principal technology issues related to sodium-cooled fast reactors (SFR), primarily the development and demonstration of ultrasonic measurement diagnostics linked to effective thermal convective sensing under normal and off-normal conditions. Sodium is well-suited as a heat transfer medium for the SFR. However, because it is chemically reactive and optically opaque, it presents engineering accessibility constraints relative to operations and maintenance (O&M) and in-service inspection (ISI) technologies that are currently used for light water reactors. Thus, there are limited sensing options for conducting thermohydraulic measurements under normal conditions and off-normal events (maintenance, unanticipated events). Acoustic methods, primarily ultrasonics, are a key measurement technology with applications in non-destructive testing, component imaging, thermometry, and velocimetry. This project would have yielded a better quantitative and qualitative understanding of the thermohydraulic condition of sodium under varied flow conditions. The scope of work will evaluate and demonstrate ultrasonic technologies and define instrumentation options for the SFR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SICS: A Sensor-Based In-Line Control System for the Surfaces of Continuously Cast Slabs

The goal of this project was to develop and demonstrate a SICS test unit that meet the need of the steel industry for enhancing the continuous casting process for improved surface quality for the targeted benefits and that is composed of an In-line Imaging Module and a Hybrid Predictive Control Module. The In-line Imaging Module provides the real-time or near real-time Product Information to the Hybrid Predictive Control Module. The latter is able to fuse the Product Information with the Process Information. In order to support the goal, this project had the technical objectives for indexes such as inspection accuracy and in-line service life, based on the inspection coverage of the entire cast slab. The deployment of the SICS systems has the potential to provide benefits in reduction of energy waste, CO 2 emission, waste water amount, toxic waste, and so forth. It will help to uphold the competitiveness of the industry that employs approximately 150,000 people nationwide and consumes about 3% of the energy in the country. The Phase II project has been carried out in accordance to the proposed tasks and budget, based on the original and extended schedule. The R&D team designed and implemented the test unit for the full width coverage, installed the unit in a caster. The development work further included enhanced image processing, in-depth defect study and process control models. The function, operation, and maintenance of the SICS was thoroughly studied during the Phase II research. The experience indicates additional hardware and procedures are required to make the SICS a commercially ready product in operation and maintenance aspect. Such developments have been finished and the team is contacting potential customers for the first commercial installation of SICS. Additionally, OGT is exploring the possibility to team up with a US company that specializes in surface cleaning for slabs/blooms/billets such that the in-line surface inspection can be integrated with in-line surface clean up for the maximum benefit to the steel industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Biochemical Mechanisms and Energy Strategies of Geobacter Sulfurreducens

To provide the scientific understanding required to allow DOE sites to incorporate relevant biological, chemical, and physical processes into decisions concerning environmental remediation, a fundamental understanding of the controls on micro-organism growth in the subsurface is necessary. Specifically, mobility of metals in the environment, including chromium, technetium and uranium, is greatly affected by the process of dissimilatory metal reduction (DMR), which has been shown to be an important biological activity controlling contaminant mobility in the subsurface at many DOE sites. Long-term maintenance of DMR at constant rates must rely upon steady fluxes of electron donors to provide the maintenance energy needed by organisms such as Geobacter sulfurreducens to maintain steady state populations in the subsurface.

09 BIOMASS FUELS↗

Flexible Coal: Evolution from Baseload to Peaking Plant (Brochure)

Twenty-first century power systems, with higher penetration levels of low-carbon energy, smart grids, and other emerging technologies, will favor resources that have low marginal costs and provide system flexibility (e.g., the ability to cycle on and off to follow changes in variable renewable energy plant output). Questions remain about both the fate of coal plants in this scenario and whether they can cost-effectively continue to operate if they cycle routinely. The experience from the CGS plant demonstrates that coal plants can become flexible resources. This flexibility - namely the ability to cycle on and off and run at lower output (below 40% of capacity) - requires limited hardware modifications but extensive modifications to operational practice. Cycling does damage the plant and impact its life expectancy compared to baseload operations. Nevertheless, strategic modifications, proactive inspections and training programs, among other operational changes to accommodate cycling, can minimize the extent of damage and optimize the cost of maintenance. CGS's cycling, but not necessarily the associated price tag, is replicable. Context - namely, power market opportunities and composition of the generation fleet - will help determine for other coal plants the optimal balance between the level of cycling-related forced outages and the level of capital investment required to minimize those outages. Replicating CGS's experience elsewhere will likely require a higher acceptance of forced outages than regulators and plant operators are accustomed to; however, an increase in strategic maintenance can minimize the impact on outage rates.

01 COAL, LIGNITE, AND PEAT↗

Refine your search to explore more results.