FLOX/MMH rocket engine assemblies
A 6-month program was conducted to fabricate, acceptance test, and deliver to JPL two FLOX/MMH rocket engine assemblies. Acceptance testing consisted of injector cold flows and 15-second-duration hot firings with the engine assemblies. An additional objective of the program was to determine the feasibility of utilizing FLOX/MMH thrust chamber components with the F2/N2H4 propellant combination. Feasibility studies consisted of analysis, cold flow, and comparative F2/N2H4-FLOX/MMH calorimeter hot fire testing, followed by a 500-second duration F2/N2H4 demonstration test.