Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Research on Remote and Hybrid Scientific Work: A Literature Review

This literature review is divided into two parts. The first part looks at new developments and emerging research specifically related to remote work since the start of the COVID-19 pandemic. This encompasses research and reporting on the impacts of COVID-19 on the workplace, more speculative writing on the possible future of remote and hybrid work, and impacts of remote work during COVID-19 for diversity, equity, and inclusion. The second part focuses on more fundamental research done on remote collaboration and remote work tools prior to COVID-19, which addresses in more detail how different types, aspects, or stages of work can best be supported using virtual collaboration tools. In both sections, we review literature that directly focuses on remote scientific collaboration, which is somewhat limited, as well as the broader literature on remote and hybrid work, which is relevant to a wide variety of workplaces, including scientific ones.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Addressing Issues with Working Memory in Video Object Segmentation

Contemporary state-of-the-art video object segmentation (VOS) models compare incoming unannotated images to a history of image-mask relations via affinity or cross-attention to predict object masks. We refer to the internal memory state of the initial image-mask pair and past image-masks as a working memory buffer. While the current state of the art models perform very well on clean video data, their reliance on a working memory of previous frames leaves room for error. Affinity-based algorithms include the inductive bias that there is temporal continuity between consecutive frames. To account for inconsistent camera views of the desired object, working memory models need an algorithmic modification that regulates the memory updates and avoid writing irrelevant frames into working memory. A simple algorithmic change is proposed that can be applied to any existing working memory-based VOS model to improve performance on inconsistent views, such as sudden camera cuts, frame interjections, and extreme context changes. The resulting model performances show significant improvement on video data with these frame interjections over the same model without the algorithmic addition. Our contribution is a simple decision function that determines whether working memory should be updated based on the detection of sudden, extreme changes and the assumption that the object is no longer in frame. By implementing algorithmic changes, such as this, we can increase the real-world applicability of current VOS models.

97 MATHEMATICS AND COMPUTING↗

Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Working memory, situation models, and synesthesia

Research on language comprehension suggests a strong relationship between working memory span measures and language comprehension. However, there is also evidence that this relationship weakens at higher levels of comprehension, such as the situation model level. The current study explored this relationship by comparing 10 grapheme–color synesthetes who have additional color experiences when they read words that begin with different letters and 48 normal controls on a number of tests of complex working memory capacity and processing at the situation model level. On all tests of working memory capacity, the synesthetes outperformed the controls. Importantly, there was no carryover benefit for the synesthetes for processing at the situation model level. This reinforces the idea that although some aspects of language comprehension are related to working memory span scores, this applies less directly to situation model levels. As a result, this suggests that theories of working memory must take into account this limitation, and the working memory processes that are involved in situation model construction and processing must be derived.

59 BASIC BIOLOGICAL SCIENCES↗

Measurement of metabolic responses to an orbital-extravehicular work-simulation exercise

This paper describes a new system designed to simulate orbital EVA work and measure metabolic responses to these space-work exercises. The system incorporates an experimental protocol, a controlled-atmosphere chamber, an EVA-work exercise device, the instrumentation, and a data acquisition system. Engineering issues associated with the design of the proposed system are discussed. This EVA-work simulating system can be used with various types of upper-body work, including task boards, rope pulling, and arm ergometry. Design diagrams and diagrams of various types of work simulation are included.

Lantz, Renee↗

A virtual work space for both hands manipulation with coherency between kinesthetic and visual sensation

This paper describes the construction of a virtual work space for tasks performed by two handed manipulation. We intend to provide a virtual environment that encourages users to accomplish tasks as they usually act in a real environment. Our approach uses a three dimensional spatial interface device that allows the user to handle virtual objects by hand and be able to feel some physical properties such as contact, weight, etc. We investigated suitable conditions for constructing our virtual work space by simulating some basic assembly work, a face and fit task. We then selected the conditions under which the subjects felt most comfortable in performing this task and set up our virtual work space. Finally, we verified the possibility of performing more complex tasks in this virtual work space by providing simple virtual models and then let the subjects create new models by assembling these components. The subjects can naturally perform assembly operations and accomplish the task. Our evaluation shows that this virtual work space has the potential to be used for performing tasks that require two-handed manipulation or cooperation between both hands in a natural manner.

Ishii, Masahiro↗

Use of Video Analysis System for Working Posture Evaluations

In a work environment, it is important to identify and quantify the relationship among work activities, working posture, and workplace design. Working posture may impact the physical comfort and well-being of individuals, as well as performance. The Posture Video Analysis Tool (PVAT) is an interactive menu and button driven software prototype written in Supercard (trademark). Human Factors analysts are provided with a predefined set of options typically associated with postural assessments and human performance issues. Once options have been selected, the program is used to evaluate working posture and dynamic tasks from video footage. PVAT has been used to evaluate postures from Orbiter missions, as well as from experimental testing of prototype glove box designs. PVAT can be used for video analysis in a number of industries, with little or no modification. It can contribute to various aspects of workplace design such as training, task allocations, procedural analyses, and hardware usability evaluations. The major advantage of the video analysis approach is the ability to gather data, non-intrusively, in restricted-access environments, such as emergency and operation rooms, contaminated areas, and control rooms. Video analysis also provides the opportunity to conduct preliminary evaluations of existing work areas.

McKay, Timothy D.↗

Validity of a heart rate monitor during work in the laboratory and on the Space Shuttle

Accurate heart rate measurement during work is required for many industrial hygiene and ergonomics situations. The purpose of this investigation was to determine the validity of heart rate measurements obtained by a simple, lightweight, commercially available wrist-worn heart rate monitor (HRM) during work (cycle exercise) sessions conducted in the laboratory and also during the particularly challenging work environment of space flight. Three different comparisons were made. The first compared HRM data to simultaneous electrocardiogram (ECG) recordings of varying heart rates that were generated by an ECG simulator. The second compared HRM data to ECG recordings collected during work sessions of 14 subjects in the laboratory. Finally, ECG downlink and HRM data were compared in four astronauts who performed cycle exercise during space flight. The data were analyzed using regression techniques. The results were that the HRM recorded virtually identical heart rates compared with ECG recordings for the data set generated by an ECG simulator. The regression equation for the relationship between ECG versus HRM heart rate data during work in the laboratory was: ECG HR = 0.99 x (HRM) + 0.82 (r2 = 0.99). Finally, the agreement between ECG downlink data and HRM data during space flight was also very high, with the regression equation being: Downlink ECG HR = 1.05 x (HRM) -5.71 (r2 = 0.99). The results of this study indicate that the HRM provides accurate data and may be used to reliably obtain valid data regarding heart rate responses during work.

STS Shuttle Project↗

Consideration of Alternate Working Fluid Properties in Gas Lubricated Foil Journal Bearings

The Oil-Free Turbomachinery Program at the NASA Glenn Research center is committed to, revolutionary improvements in performance, efficiency and reliability of turbomachinery propulsion systems. One of the key breakthroughs by which this goal is being achieved is the maturation of air lubricated foil bearing technology. Through experimental testing, foil bearings have demonstrated a variety of exceptional qualities that show them to have an important role in the future of rotordynamic lubrication. Most of the work done with foil bearings thus far has considered ambient air at atmospheric pressure as the working fluid or lubricating fluid in the bearing. However, special applications of oil-free technology require the use of air at non- standard ambient conditions or completely different working fluids altogether. The NASA Jupiter Icy Moon Orbiter program presents power generation needs far beyond that of any previous space exploration effort. The proposed spacecraft will require significant power generation to provide the propulsion necessary to reach the moons of Jupiter and navigate between them. Once there, extensive scientific research will be conducted that will also present significant power requirements. Such extreme needs require exploring a new method for power generation in space. A proposed solution involves a Brayton cycle nuclear fission reactor. The nature of this application requires reliable performance of all reactor components for many years of operation under demanding conditions. This includes the bearings which will be operating with an alternative working fluid that is a combination of Helium and Xenon gases commonly known as HeXe. This fluid has transport and thermal properties that vary significantly from that of air and the effect of these property differences on bearing performance must be considered. One of the most promising applications of oil-free technology is in aircraft turbine engines. Eliminating the oil supply systems from aircraft engines will lead to significant weight and maintenance reduction. In such applications, the lubricating fluid will be high altitude air. This air will be at much lower pressure than that at sea level. Again this property change will result in a change in bearing performance, and analysis is required to quantify this effect. The study of these alternate working fluid properties will be conducted in two ways: analytically and experimentally. Analytical research will include the use of a mathematical code that can predict film thickness profiles for various ambient conditions. Estimations of load capacity can be made based upon the film thickness trends. These values will then be compared to those obtained from classical rigid bearing analysis. Experimental Research will include testing a foil bearing at a variety of ambient air pressures. The analytical and experimental data will be compared to draw conclusions on bearing performance under alternate working fluid properties.

Smith, Matthew J.↗

m:N Working Group: Meeting Summary March 2024

From March 26th to 28th, 2024 the m:N UAS working group and its subgroups (Evaluation Methodologies, Exceptions/Interventions, and Initial Operating Capability for Airspace Integration) met at SAIC in Washington, D.C. for an in-person meeting. The subgroups meet virtually throughout the year, and twice a year participants from all the subgroups come together to further identify and discuss challenges and paths forward for incorporating UAS into the airspace. The m:N UAS working group is run by Jay Shively (Adaptive Aerospace) and Andy Thurling (DroneUp) and is comprised of members from government, industry, and academia in an effort to identify and reduce barriers to m:N operations. This includes identifying requirements, use cases, metrics, and the development of white papers to support organizations including the FAA, RTCA, and ASTM. A change from last year, the Large UAS and HAPS sub working groups have disbanded while the sUAS working group continues independently, currently working on a white paper titled Personnel Selection, Roles, and Training for sUAS. For 2024 the m:N sub working groups have been refocused to cover evaluation methodologies, interventions/exceptions, and initial operating capability for airspace integration; with the premise that the outcomes from these subgroups will be white papers. These white papers can inform one another to ultimately become a master whitepaper. Each subgroup lead is called out below: Evaluation Methodologies Subgroup Jay Shively, Adaptive Aerospace Interventions/Exceptions Subgroup Andy Thurling, DroneUp (Lead) Initial Operating Capability for Airspace Integration Subgroup Andy Lacher, NASA (Lead)

m:N operations↗

Heat dissipation systems with hygroscopic working fluid

In various embodiments, the present invention relates to heat dissipation systems including a hygroscopic working fluid and methods of using the same. In various embodiments, the present invention provides a method for heat dissipation using a hygroscopic working fluid. The method can include transferring thermal energy from a heated process fluid to the hygroscopic working fluid in a process heat exchanger, to form a cooled process fluid. The method can include condensing liquid from a feed gas on a heat transfer surface of a feed gas heat exchanger in contact with the cooled process fluid, to form a cooled feed gas, the heated process fluid, and a condensate. The method can include dissipating thermal energy from the hygroscopic working fluid to a cooling gas composition with a fluid-air contactor. The method can include transferring moisture between the hygroscopic working fluid and the cooling gas composition with the fluid-air contactor. The method can include adding at least part of the condensate to the hygroscopic working fluid.

Martin, Christopher Lee↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative working is driving progress in hazard and risk reduction delivery at Sellafield - 16387

A new way of working has been adopted at the Sellafield site in the United Kingdom which is delivering benefits in terms of accelerating hazard and risk reduction safely and securely at the site. This new way of working involves a collaborative approach on crucial aspects of the plan of work for Sellafield between: - Sellafield Ltd (the site's management and operations contractor), - The Nuclear Decommissioning Authority (the site's owner and Sellafield Ltd's customer), - The Office for Nuclear Regulation (the UK's nuclear safety and security regulator), - The Environment Agency (England's environmental regulator), - The UK Government's Department of Energy and Climate Change, - The UK Government's Shareholder Executive, part of the Department of Business, Innovation and Skills. The new way of working is founded upon fully aligning the individual strategies of each of these six organisations towards the common goal of accelerated risk and hazard reduction and then ensuring good communications so these strategies remain fully aligned. To this end a number of issues were identified by the six organisations which were considered to be slowing the progress of the risk and hazard reduction work, from which a set of 'strategic themes' was developed to facilitate different ways of thinking and so solve these issues. The strategic themes are: - Looking for blockers and how they can be removed, - Avoiding overly complex solutions by utilising the concept of fit for purpose, - The effective use of resources, - Prioritisation arrangements, - Incentivisation, - The appetite for risk, - Avoiding distractions and diversions, - Effective use of communications so that the more effective and efficient ways of working, and the improvements that are generated, are promulgated throughout Sellafield Ltd. These strategic themes have been applied with great effect in a number of areas delivering risk reduction benefits. For example: - The removal of ageing fuel from Sellafield's oldest pond, the Pile Fuel Storage Pond; a significant milestone in the site's hazard and risk reduction agenda. - Implementing an alternative ILW approach. - Managing stocks of Highly Active Liquor (HAL). - 'Re-purposing' existing Waste Management Facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Work Package: Initial Wireless Communication Platform Design, Development, and Evaluation

The Department of Energy's Light Water Reactor Sustainability Program is developing the scientific basis to ensure long-term reliability, productivity, safety, and security of the nuclear power industry in the United States. The Instrumentation, Information, and Control (II and C) pathway of the program aims to increase the role of advanced II and C technologies to achieve this objective. One of the pathway efforts at Idaho National Laboratory (INL) is to improve the work packages execution process by replacing the expensive, inefficient, bulky, complex, and error-prone paper-based work orders with automated work packages (AWPs). An AWP is an automated and dynamic presentation of the work package designed to guide the user through the work process. It is loaded on a mobile device, such as a tablet, and is capable of communicating with plant equipment and systems to acquire plant and procedure states. The AWP replaces those functions where a computer is more efficient and reliable than a human. To enable the automatic acquisition of plant data, it is necessary to design and develop a prototype platform for data exchange between the field instruments and the AWP mobile devices. The development of the platform aims to reveal issues and solutions generalizable to large-scale implementation of a similar system. Topics such as bandwidth, robustness, response time, interference, and security are usually associated with wireless communication. These concerns, along with other requirements, are listed in an earlier INL report. Specifically, the targeted issues and performance aspects in this work are relevant to the communication infrastructure from the perspective of promptness, robustness, expandability, and interoperability with different technologies. The development of a prompt system entailed significant performance optimization, including the use of parallel processing, parallel communication, modularity, noise filtering, and frequency tuning. A robust system was achieved by enforcing a persistent continuous data exchange that automatically detects and conveys a failure of any link or component in any part of the system, and that automatically restores the communication once the link or component is restored. An expandable topology was enabled by modularity and load sharing. The number of servers, mobile devices, and field instruments is not limited from a system structure point of view. The system interoperability was achieved by enforcing the independence of the field communication application from the mobile device application. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status Update on IAEA MODARIA II Working Group 1 (Assessment and Decision Making) - 19391

During WM2018, the work being done under the International Atomic Energy Agency (IAEA)'s Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129) was introduced. The Programme comprises seven working groups covering a wide range of topics. Amongst them, Working Group 1 (WG1) is focused on dose assessment and decision aiding tools to address existing exposure situations due to past practices involving naturally occurring radioactive material (NORM) and nuclear legacy sites. Specifically, this covers the development of methods and toolsets for risk-informed decision-making for such complex sites, and includes practical demonstration of decision-making processes and tools through case studies. During 2018 WG1 participants met twice to discuss the status and plans of work being conducted by the WG. The group held its Second Interim Meeting from 7 to 11 May 2018 at the Jozef Stefan Institute (JSI) in Ljubljana, Slovenia. The objectives of the meeting were to: (1) Discuss the status of WG1 work; (2) Start preparation of the interim draft version of the MODARIA II WG1 Report (herein referred to as the 'Interim Report'); (3) Review the progress of planned data analyses, model-model comparisons, and model-data comparisons being conducted through case studies for the Tessenderlo Chemie Site in Belgium, the Zapadnoe Uranium Mill Tailings Site in Ukraine, and a Former Tin Processing Facility Site in Brazil; (4) Discuss calculations conducted for a NORM Site in China for potential addition to the WG1 case studies; (5) Report on progress on topical studies and other assignments performed to support the preparation of several sections of the Interim Report; and (6) Discuss plans for incorporating some preliminary case studies considered by MODARIA I WG1 and MODARIA I WG3. During the meeting in Slovenia, WG1 participants also visited the Zirovski vrh (RZV) Uranium Mine and Mill Tailings Site near Ljubljana. From 22 to 25 October 2018, WG1 members also participated in the MODARIA II Third Technical Meeting in Vienna, Austria. The meeting facilitated analysis of the progress made so far by the seven working groups, as well as exploration of the dissemination of the results of the MODARIA II Programme through publication in scientific journals dealing with the various subject areas covered by the Programme. WG1 participants focused on the preparation of its Interim Report, and engaged in technical exchanges with the IAEA Le Trench Project on characterization, assessment, remediation and management of buried waste at legacy trench sites, as well as the To Enhance uncertainties Reduction and stakeholders Involvement Towards integrated and graded Risk management of humans and wildlife In long-lasting radiological Exposure Situations (TERRITORIES) project (https://territories.eu/). Currently, WG1 is in the process of preparing a draft report to document the results of its various case studies and special topics, and is preparing for the final Interim Meeting in May 2019 and the final Technical Meeting in October 2019, before the conclusion of the MODARIA II Program at the end of 2019. This paper will provide a status update of these activities, along with preliminary information on the WG1 report, including potential recommendations for future activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

Operational experience with a near-integer working point at RHIC.

During the RHIC polarized proton run in N 2006 it became evident that the luminosity performance is limited by the beam-beam effect. With a working point between 213 and 7/10, and the necessity to mirror the tunes of the two RHIC rings at the diagonal, the beam with a horizontal tune closest to 213 showed poor lifetime. To overcome this limitation, a near-integer working point has been proposed. Tracking studies performed at both working points showed a larger dynamic aperture near the integer tune than above 2/3. In Run-8, this new working point was commissioned in one ring of RHIC, while the other ring was operated at the same working point as in Run-6. In this paper we report the commissioning process and operational experience with this new working point.

43 PARTICLE ACCELERATORS↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗