Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wind industry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Coastal Data Information Program (CDIP) Buoy 028

The Coastal Data Information Program (CDIP) is an extensive network for monitoring waves and beaches along the coastlines of the United States. The buoy primarily collects wave and sea surface temperature information. These data are collected as a part of an observational database to support the floating offshore wind research and industry along the coast of California within the ORACLE project funded by DOE-WETO.

17 WIND ENERGY↗

Representative Project Design Envelope for Floating Offshore Wind Energy: A Focus on the California 2023 Federal Leases

NREL developed recommendations for a representative project design envelope (RPDE) for floating offshore wind energy projects in the California lease areas, considering industry feedback from offshore wind farm developers. The RPDE provides estimates of minimum and maximum values for project design parameters that are relevant for assessing environmental impacts. The design envelope considers the practical range of technology options that may be deployed and accounts for major physical constraints, technology feasibility, and supply chain readiness. In addition to the RPDE, this report presents four scenarios that illustrate some of the differences between technologies that could be used offshore California, as well as descriptions of the typical installation processes that are expected to be used for floating offshore wind farms.

17 WIND ENERGY↗

Surface Meteorological Station McKinleyville, CA

These data are collected as part of an observational database developed to support the floating offshore wind research and industry under the ORACLE project funded by DOE WETO. The surface meteorological data are collected by NOAA (https://psl.noaa.gov/data/obs/datadisplay), and here only data within the state of California are part of the database.

17 WIND ENERGY↗

Simulate Wind Loading on RUTE SunTracker: Cooperative Research and Development (Final Report)

RUTE produces and delivers efficient, sustainable structural foundation systems for the wind and solar industries, instrumental in the effort to lower the cost of clean electricity and reduce CO2. RUTE's SunTracker is a high-clearance agrivoltaic solar array. The system uses raised cables, providing support with less materials and cost. These cables can provide tracking for increased energy generation and greater revenue, allowing the land beneath to be used for other means simultaneously. RUTE provided data files that NREL will use to perform computational fluid dynamics (CFD) simulations to characterize and predict wind loading on the 6x6 RUTE SunTracker photovoltaic (PV) array. Varying both the panel orientations and wind speeds provides information on how the array can manage a variety of weather conditions. These results, in turn, inform RUTE's design and construction of these arrays.

14 SOLAR ENERGY↗

Characteristics of future Vertical Axis Wind Turbines (VAWTs)

The developing Darrieus VAWT technology whose ultimate objective is economically feasible, industry-produced, commercially marketed wind energy systems is reviewed. First-level aerodynamic, structural, and system analyses capabilities which support and evaluate the system designs are discussed. The characteristics of current technology designs are presented and their cost effectiveness is assessed. Potential improvements identified are also presented along with their cost benefits.

Kadlec, E. G.↗

A Fast, Accurate Prediction for System-Wide Damage Due to Dynamic Wind Loading

The complex relationship between photovoltaic (PV) hardware configurations, overall system dynamics, and turbulent aerodynamic phenomena generates highly unsteady, non-uniform loads that can lead to damaging instabilities. These effects may result in glass breakage, cell cracking, and structural failures in frames and mounting systems, even under moderate wind conditions. Addressing industry concerns about premature system failures in field conditions deemed survivable, our research aims to develop a fast and accurate predictive model for system damage. This model integrates configurable hardware choices with advanced simulation tools to represent the overall system-specific dynamics effectively. Using this model, we predict responses under varying weather conditions and hardware setups, translating these predictions into pre-trained surrogate models capable of accurately identifying failure risks and rapidly testing new system hardening measures. In this presentation, we will showcase preliminary results in capturing system dynamics through our customizable library of PV hardware configurations. Additionally, we will highlight how these new tools build upon PVade's established wind load modeling capabilities and foster the development of advanced AI/ML surrogates for improving system robustness.

97 MATHEMATICS AND COMPUTING↗

Accomplishments and Year-End Performance Report; Wind Energy Program: Fiscal Year 2021

The National Wind Technology Center (NWTC), located at the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) Flatirons Campus, has been a driving force in advancing wind energy technology research worldwide since its designation as a DOE national research center in 1992. Enabled by the Flatirons Campus's world-class facilities, scientists, engineers, analysts, and researchers are pushing the frontiers of science to pursue wind energy innovation. In Fiscal Year (FY) 2021, NREL continued to provide the technical expertise, research capabilities, and industry understanding to support DOE's ambitious climate action and research goals by advancing technology, addressing market and deployment barriers, and driving down costs with more efficient, reliable, and predictable wind energy systems. One of several highlights, NREL received an R&D 100 Special Recognition Award for its Thermoplastic Resin System for Wind Turbine Blades. This breakthrough in the wind turbine manufacturing process will enable the production of recyclable blades that are stronger, longer, and less expensive, while increasing energy capture, decreasing energy and transportation costs, and increasing blade reliability. In a year when the entire U.S. economy struggled to address workforce gaps, an NREL study compared wind industry needs, training programs, and hiring practices with perspectives from students and recent college graduates. Researchers hope that, by pinpointing areas of disconnect, the expectations of employers who have difficulty filling entry-level jobs can better align with the preparation of the potential applicants who find it hard to break into the field. The lab also made numerous new data and modeling resources available in FY 2021. Recent NREL releases include a modeling tool for predicting the power performance and structural loads of wind turbines within a wind farm (FAST.Farm), a computational framework for modeling golden eagle behavior near wind farms, and 20 years of offshore wind data. Updates were also made to the widely used Wind Plant Integrated Systems Design and Engineering Model (WISDEM), which couples engineering and cost models to examine system-level trade-offs. Now, bolstered by a renewed national commitment to tackle climate change and revitalize the U.S. economy through increased investment in clean energy - particularly in offshore wind energy - NREL stands poised to lead the way to a sustainable future that powers the United States with significant levels of reliable, low-cost, accessible wind energy. This report provides an overview of the achievements NREL made on behalf of DOE's Wind Energy Technologies Office (WETO) and other partners during FY 2021 (between Oct. 1, 2020, and Sept. 30, 2021).

Flatirons Campus↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗

Advancing Offshore Wind Resource Characterization Using Buoy-based Observations

As countries continue to implement sustainable and renewable energy goals, the need for affordable low-carbon technologies, including those related to offshore wind energy, is accelerating. The U.S. federal government recognizes the environmental and economic benefits of offshore wind development and is taking the necessary steps to overcome critical challenges facing the industry to realize these benefits. The U.S. Department of Energy (DOE) is investing in buoy-mounted lidar systems to facilitate offshore measurement campaigns that will advance our understanding of the offshore environment and provide the observational data needed for model validation, particularly at hub height where offshore observations are particularly lacking. On behalf of the DOE, Pacific Northwest National Laboratory manages a Lidar Buoy Program that facilitates meteorological and oceanographic data collection using validated methods to support the U.S. offshore wind industry. Since being acquired in 2014, two DOE lidar buoys have been deployed on the U.S. east and west coasts; and their data represent the first publicly available multi-seasonal hub height data to be collected in U.S. waters. In addition, the buoys have undergone performance testing, significant upgrades, and a lidar validation campaign to ensure the accuracy and reliability of the lidar data needed to support wind resource characterization and model validation. The Lidar Buoy Program is providing valuable offshore data to the wind energy community, while focusing data collection on areas of acknowledged high priority.

offshore wind energy, lidar buoy, wind resource ch↗

Wind Energy: Supply Chain Deep Dive Assessment

The report “America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition” lays out the challenges and opportunities faced by the United States in the energy supply chain as well as the federal government plans to address these challenges and opportunities. It is accompanied by several issue-specific deep dive assessments, including this one, in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. To inform the DOE team’s supply chain review, researchers at the National Renewable Energy Laboratory (NREL) conducted research and analyses that characterize supply chain strengths, weaknesses, opportunities, and threats within the wind industry, including both land-based and offshore wind. The team also conducted interviews with industry stakeholders and subject matter experts. This report documents these findings and provides a foundation for addressing the observed vulnerabilities and enhancing U.S. wind supply chain competitiveness.

17 WIND ENERGY↗

Plans and status of the NASA-Lewis Research Center wind energy project

Wind energy is investigated as a source of energy. The wind energy program that is managed by the NASA-Lewis Research Center is described. The Lewis Research Center's Wind Power Office, its organization, plans, and status are discussed. Major elements of the wind power project included are: an experimental 100 kW wind-turbine generator; first generation industry-built and user-operated wind turbine generators; and supporting research and technology tasks.

Thomas, R.↗

Electromagnetic Mass and Efficiency of Magnetic Gears for Electrified Aircraft

Magnetic gears are currently being developed for use in a variety of industries such as wind and automotive, because of their higher reliability and lower maintenance cost than their mechanical counterparts. The bulk of magnetic gear development to date has focused on maximizing the technology's volumetric torque density. In contrast, the primary performance metrics for an aircraft's gear box are its mass and efficiency. To that end this paper presents a study of the achievable electromagnetic specific torque and efficiency of concentric magnetic gears. NASA's second magnetic gear prototype is used as the baseline for this study. Achievable electromagnetic specific torque and efficiency trends are presented with respect to higher level design variables such as gear ratio and radius.

Tallerico, Thomas F.↗

Electromagnetic Efficiency and Mass of Magnetic Gears for Electrified Aircraft

Magnetic gears are currently being explored to replace mechanical gears in various industries such as wind and automotive due to their higher reliability and lower maintenance requirements. In these applications volume minimization has been the goal of magnetic gear development. In contrast, the primary performance metrics for electrified aircraft drives are mass and efficiency. This paper presents the first ever study of design tradeoffs between electromagnetic mass and efficiency of concentric magnetic gears and the feasibility of achieving the low mass and high efficiency required for electrified aircraft applications. Higher level design variables are considered, including gear ratio, number of magnetic pole pairs, and number of magnets per pole pair.

Tallerico, Thomas↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

Smart Process Planning for Automated Fiber Placement

Many industries, including aerospace, automotive, wind energy, maritime, and sporting goods, rely on strong, lightweight materials called composites. These materials are made by layering fibers, which can come in the form of narrow strips or wider sheets, and setting them in a polymer matrix. One of the most advanced ways to make these parts is through automated fiber placement, where a machine lays down the fibers in precise patterns. This method can create very efficient and strong designs, but it is complex, expensive, and often depends heavily on the experience of skilled engineers. Today, the design, manufacturing, and inspection stages of composite production are usually handled separately. This separation means that important information, such as how a part will be built or what defects might occur, is not always shared between stages. As a result, parts may not be as lightweight, strong, or defect-free as possible, and the process can take longer and cost more. This research develops a smart process planning system that connects design, manufacturing, and inspection into one continuous process. Built as software that works with existing tools, the system can automatically plan how the fibers are placed, predicting and reducing defects while improving both manufacturability and strength. The system optimizes not only individual layers but also how defects are distributed across all layers, preventing them from stacking up in ways that weaken the final part. It also uses inspection results from completed parts to improve future designs, creating a feedback loop where each stage informs the others. The system was tested by designing a composite panel using this new approach and comparing it to a panel made with state-of-the-art manual planning methods. The results showed that the system could intentionally control where defects appeared and increase the efficiency of the planning process. By unifying design, manufacturing, and inspection, this research shows a way to make advanced composite manufacturing more efficient, consistent, and cost-effective. This approach lowers the barrier to using automated fiber placement and opens the door for its wider adoption not only in aerospace but also in industries such as automotive, wind energy, maritime, and sporting goods, where strong and lightweight structures are essential.

Computer-Aided Process Planning↗

A review of utility issues for the integration of wind electric generators

A review of issues and concerns of the electric utility industry for the integration of wind electric generation is offered. The issues have been categorized in three major areas: planning, operations, and dynamic interaction. Representative studies have been chosen for each area to illustrate problems and to alleviate some concerns. The emphasis of this paper is on individual large wind turbines (WTs) and WT arrays for deployment at the bulk level in a utility system.

Reddoch, T. W.↗

Plans and status of the NASA-Lewis Research Center wind energy project

This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.

Thomas, R.↗

ARCUS Vertical-Axis Wind Turbine (Final Scientific/Technical Report)

While land-based wind energy has become economically competitive with traditional energy generation sources in the U.S., offshore wind is not. For floating offshore wind this difference is even more substantial where the levelized cost of energy (LCOE) is projected to be around 3-5 times more expensive than land-based wind. The turbine capital costs represent around 50% of the LCOE for land-based wind sites, but the increased system costs for floating offshore wind reduce this to 20%. The platform and mooring costs are the single largest contributor to the LCOE for floating offshore wind where their mass must counteract the overturning moment caused by the turbine’s thrust force. Despite the high costs of the platform and relatively low cost of the turbine, current offshore wind turbines are designed essentially the same as for land-based sites. Reducing the LCOE is the greatest challenge to realize the benefits of sustained development of floating offshore wind in the U.S. Reducing the complicated system costs of floating offshore wind will enable the industry to continue to grow and outpace current projections if reduced cost curves can be reached. The ideal wind energy system would remove all mass and cost that is not directly capturing energy from the wind. For floating offshore wind energy systems, this objective is even more significant as increased mass above the water level must be supported by larger and more expensive floating platforms. For this reason, vertical-axis wind turbines (VAWTs) are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWTs) at this scale. Large VAWTs offer opportunities for improved energy capture over HAWTs as single units and with reduced wind plant aerodynamic losses through enhanced wake recovery. Additionally, the platform-level placement of the VAWT drivetrain greatly reduces the demands placed on the floating platform and its mass and cost. The ARCUS vertical-axis wind turbine concept (U.S. 11,421,650 B2) is an iteration beyond traditional Darrieus-type VAWTs that replaces the rigid tower with blades that are bent into shape and held in place with tensioned center supports, like a bow. The ARCUS design has been shown to further decrease the VAWT rotor mass properties, with a 50% reduction over traditional Darrieus VAWTs quantified in the ATLANTIS program. The ARCUS VAWT’s efficient use of material for the rotor and turbine support structures combined with its lowered center of gravity enables a tension-leg platform (TLP) with simplified installation procedures. TLPs have been an emerging platform architecture in the Oil and Gas industry and demonstrated to have the lowest hull mass requirements while maintaining stability with minimal roll and pitch deflections in operation. A 22 MW ARCUS turbine has been designed with a three-column TLP that enables quayside integration of the turbine while maintaining system stability during tow-out and installation and having optimal mass and cost properties. A comprehensive analysis shows the optimal ARCUS TLP system design minimizes LCOE through efficient material usage and increased energy capture to yield a competitive LCOE estimate of $\$$55/MWh. A comparison with a reference HAWT, having the same swept area, quantifies the advantages that helped to produce this improved LCOE for the ARCUS concept: (1) 30% reduction in total turbine mass, (2) 70% reduction in turbine center of gravity, and (3) 45% increase in energy production over what is optimal for a HAWT. Intellectual property has been generated through the ATLANTIS program providing opportunities to further reduce the LCOE and improve the performance of the ARCUS turbine and TLP system, expanding the list of innovations to support commercial development of the ARCUS concept.

17 WIND ENERGY↗