Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wec”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Wave Prediction using X-Band Radar (Final Summary Report)

Model Predictive Control (MPC) is the best controls framework available to wave energy today. It allows for the maximization of energy yield from a WEC system while respecting various constraints and losses in the system. This type of constrained optimization is a critical capability for the techno-economic optimization of WEC devices and is difficult to do effectively with causal controls frameworks. MPC requires a future prediction of wave excitation forces, requiring wave prediction on a future time horizon of up to 30 seconds. The future horizon required is highly dependent on the WEC and PTO type available. To our knowledge no-one has been able to implement MPC on a WEC device at sea, due to the fact that phase-resolved wave-prediction is not a capability that has been sufficiently developed to date. The key objectives of this project are focused on developing “industry-ready” wave prediction technology building blocks that can be applied to a wide range of different wave energy conversion topologies. Our collaborative work with device developers has demonstrated that the level of improvement attainable for any particular device is heavily dependent on the device and PTO topology chosen. The range of annual average power capture improvements is on the order of 10% to over 100%. However, the important aspect is that we can get within about 10% of theoretical upper limits even when considering errors in the wave prediction and more importantly, we can optimize performance while respecting various constraints such as motion amplitude or peak structural loads. The combination of improved performance while limiting structural loads has a net effect of reducing the levelized cost of energy from these emerging technologies and allows us to design control laws that meet an economic optimum. Efforts under a previous project on controls has focused on developing a set of wave-prediction algorithms that work by leveraging a network of wave sensing measurement buoys that are equipped with real-time telemetry. The present work is focusing primarily on using X-band radar to measure the wave-field around the WEC to predict the future excitation forces on the structure and combining the measurements of these different sources to create improvements in the wave-prediction accuracy.

16 TIDAL AND WAVE POWER↗

Advanced Laboratory and Field Arrays: Technical Report for Performance Enhancement for Marine Energy Converter (MEC) Arrays (Task 5)

Task 5 consisted of two parts, wave energy converter (WEC) arrays and current energy converter (CEC) arrays. The two parts of the project were executed independently, and this report covers only the work on WECs. In this part of the task, the team characterized the behavior of and developed control schemes for wave energy converter (WEC) arrays that improved performance (i.e., maximized aggregate power generation and reduced the levelized cost of energy) over baseline, non-coordinated control approaches. Specifically, for WEC arrays: the team developed optimal layouts of arrays that considered the effect of WEC placement within an array on coordinated array control with real-time estimation schemes. The numerical codes developed through this task were made available to users for array design. These tools utilized existing commercial software as well as software developed within the project team.

13 HYDRO ENERGY↗

Real-Time Sea State Estimation for Wave Energy Converter Control via Machine Learning

Wave energy converters (WECs) harness the untapped power of ocean waves to generate renewable energy, offering a promising solution to sustainable energy. An optimal WEC control strategy is essential to maximize power capture that dynamically adjusts system parameters in response to rapidly changing sea states. This study presents a novel control approach that leverages neural networks to estimate sea states from onboard WEC measurements such as position, velocity, and force. Using a point absorber WEC device as a test platform, our proposed approach estimates sea states in real-time and subsequently adjusts PID controller gains to maximize energy extraction. Simulation results across diverse sea conditions demonstrate that our strategy eliminates the need for external wave monitoring equipment while maintaining power capture efficiency. The results show that our neural network-based control technique can improve power capture by 25.6% while significantly reducing system complexity. This approach offers a practical alternative for WEC deployments where direct wave measurements are either infeasible or cost prohibitive.

PIDcontrol↗

Investigations into Balancing Peak-to-Average Power Ratio and Mean Power Extraction for a Two-Body Point-Absorber Wave Energy Converter

The power harnessed by wave energy converters (WECs) in oceans is highly variable and, therefore, has a high peak-to-average power (PTAP) ratio. To minimize the cost of a WEC power take off (PTO) system, it is desirable to reduce the PTAP ratio while maximizing the mean power extracted by WECs. The important issue of how PTAP ratio reduction measures (such as adding an inertia element) can affect the mean power extracted in a reference model has not been thoroughly addressed in the literature. To investigate this correlation, this study focuses on the integration of the U.S. Department of Energy’s Reference Model 3, a two-body point absorber, with a slider-crank WEC for linear-to-rotational conversion. In the first phase of this study, a full-scale numerical model was developed that predicts how PTO system parameters, along with an advanced control algorithm, can potentially affect the proposed WEC’s PTAP ratio as well as the mean power extracted. In the second phase, an appropriate scaled-down model was developed, and extracted power results were successfully validated against the full-scale model. Finally, numerical and hardware-in-the-loop (HIL) simulations based on the scaled-down model were designed and conducted to optimize or make trade-offs between the operational performance and PTAP ratio. The initial results with numerical and HIL simulations reveal that gear ratio, crank radius, and generator parameters substantially impact the PTAP ratio and mean power extracted.

16 TIDAL AND WAVE POWER↗

Benchmark of numerical modeling approaches on the systematic performance evaluation of wave energy converters

Different numerical modeling methods have been developed and applied to evaluate a variety of performance indicators of wave energy converters (WECs), including the power performance, structural loads, levelized cost of energy, etc. Based on the modeling fidelity, the commonly used numerical modeling approaches can be classified as linear modeling, weakly nonlinear modeling and fully nonlinear modeling approaches. Each method differs in accuracy and computational efficiency, making them suitable for different stages of WEC design. However, the selection of modeling approach could significantly impact evaluation outcomes. For instance, simplified linear models may underestimate structural loads or overestimate energy production in some operational conditions, potentially leading to less cost-effective designs. Given the widespread utilization of these models, it is essential to understand the uncertainties brought by them in performance evaluations. This work is dedicated to benchmarking different linear-potential-flow-based numerical models for evaluating the systematic performance of WECs. Three representative numerical modeling approaches are considered in this work, including linear frequency-domain modeling, statistically linearized spectral-domain modeling and Cummins equation-based nonlinear time-domain modeling. A generic point absorber WEC is considered as the research reference in this work, and different sea sites are taken into account. The numerical models are utilized to predict critical performance indicators, including power performance, the annual energy production, the capacity factor, the levelized cost of energy and the PTO fatigue loads. By comparing the results, this work identifies the uncertainties associated with different modeling approaches in evaluating WEC performance.

Fatigue↗

Global wave energy resource classification system for regional energy planning and project development

Efforts to streamline and codify wave energy resource characterization and assessment for regional energy planning and wave energy converter (WEC) project development have motivated the recent development of resource classification systems. Given the unique interplay between WEC absorption and resource attributes, viz, available wave power frequency, directionality, and seasonality, various consensus resource classification metrics have been introduced. However, the main international standards body for the wave energy industry has not reached consensus on a wave energy resource classification system designed with clear goals to facilitate resource assessment, regional energy planning, project site selection, project feasibility studies, and selection of WEC concepts or archetypes that are most suitable for a given wave energy climate. In this work, a primary consideration of wave energy generation is the available energy that can be captured by WECs with different resonant frequency and directional bandwidths. Therefore, the proposed classification system considers combinations of three different wave power classifications: the total wave power, the frequency-constrained wave power, and the frequency-directionally constrained wave power. The dominant wave period bands containing the most wave power are sub-classification parameters that provide useful information for designing frequency and directionally constrained WECs. The bulk of the global wave energy resource is divided into just 22 resource classes representing distinct wave energy climates that could serve as a common language and reference framework for wave energy resource assessment if codified within international standards.

16 TIDAL AND WAVE POWER↗

The effect of current and lambda on white-etch-crack failures

White etching cracks (WECs) have been associated with premature failure of wind turbine roller bearings. Various drivers for the generation of WECs have been identified such as loading conditions, slip, steel quality, lubrication, hydrogen embrittlement, corrosion fatigue cracking, and stray electrical currents passing through the surface. Here, in this work, a benchtop test rig utilizing a three-ring-on-roller test configuration was used to investigate the effect of electrical current and operation in different lubricating regimes, defined by lambda (λ), on high-quality bearing steel samples tested in a commercially available power transmission EP gear lubricant. It was observed that there is an inverse correlation between the magnitude of electric current applied to the ring/ roller system and time-to-failure. Higher current magnitudes lead to shorter time-to-failure than lower current magnitudes, with macropitting as the main failure mode. Sub-surface investigation revealed the presence of WECs in all cases. For the same current magnitude, tests conducted in boundary and mixed lubrication regimes showed that time-to-failure increased as lambda increased, and the tests resulted in WEC related macropits, whereas tests conducted in near-hydrodynamic regime resulted in surface damage with no macropit. It was also noted that a shift toward near-hydrodynamic lubrication resulted in a distinct surface distress on the roller surface. Furthermore, there seems to be a transition in the mixed regime during which the surface distress occurred. The damage on the surface of the test samples resembled non-spatially, periodic, groove-like corrugations and, in some cases, crater-like depressions. Sub-surface imaging, performed by sequential sectioning, revealed the presence of WECs in all cases, and broad, branching cracks that were more prevalent under the more severe boundary conditions.

17 WIND ENERGY↗

Linking international technical specifications for acoustic characterization of marine energy converter sounds with environmental compliance criteria

As new ocean energy technologies emerge and are deployed for testing and operations, sound emissions are a potential concern for environmental effects to marine life. Consistent acoustic measurement and data analysis methods can help promote comparisons of technologies and transferability between project sites. In 2022, acoustic emissions from a prototype scale wave energy converter (WEC) were characterized for a range of environmental conditions and power generation states in the coastal waters off southern California using a set of international technical specifications. Results from the international technical specification analyses were applied to United States regulatory threshold criteria for acoustic impacts to marine mammals and examined in the context of European underwater noise monitoring guidelines. Weighted 24 hour cumulative sound exposure levels SEL24h calculated from the highest power generation state WEC sound pressure levels were often more than 20 dB below threshold criteria for temporary threshold shifts in five relevant marine mammal hearing groups. Following European Union recommendations for analyses and reporting, WEC sound characterization in third octave bands centered at 63 Hz and 125 Hz show clear spatial decay of WEC-generated noise, with more pronounced attenuation at 63 Hz, and a less marked but still detectable gradient at 125 Hz, collectively suggesting a relatively confined acoustic footprint under the observed conditions. The value of the international technical specification approach is highlighted by the isolation of WEC sounds from the surrounding soundscape. This allows for a robust characterization of acoustic emissions through a range of device power generation and sea states. Furthermore, in threshold-based regulatory contexts like the U.S., this facilitates direct evaluation of source contributions, while in broader monitoring frameworks used in the E.U. it provides a reproducible foundation for assessing the contribution of emerging ocean energy technologies to the underwater acoustic environment.

Haxel, Joseph H. (ORCID:0000000273864761)↗

Power Take-Off Design Study for a Small-Scale Oscillating Surge Wave Energy Converter for Powering the Blue Economy Applications

The power take-off (PTO) is an integral part of wave energy conversion, and the design process is nontrivial. Better PTOs, and better processes for selecting and designing PTO architectures for various applications, would benefit devices that assist in powering the blue economy by decreasing time and money spent on PTO design and increasing the overall energy capture performance of these devices. This paper chronicles the selection process of a PTO for a small-scale surge-type wave energy converter (WEC) for the purpose of informing future PTO selection processes. Three PTO architectures are evaluated in WEC-Sim: a hydraulic check valve PTO, a hydraulic active valving PTO, and a directly electrified PTO. Simple models of each PTO are constructed. Because a model for the small-scale device was initially unavailable, the PTOs are simulated on a large-scale device. The results are scaled down using Froude scaling and compared to results from directly simulating a small-scale model. Strong assumptions are made because this work is early in the design stages, and a coarse look at PTO options was desired. Specifically, the effectiveness of controls is investigated, along with the efficiency of energy conversion. However, energy capture is only part of the consideration; there are also logistic concerns to be considered when selecting a PTO. For example, components for large-scale WECs are so large and expensive that it may make sense to custom-build PTO components, but small-scale WECs would benefit from off-the-shelf availability because the cost of customization would be a significant portion of the total capital cost of deployment at a small scale. Submersible, off-the-shelf components are much easier to source for hydraulic PTOs. Because of highly effective controls, efficient energy conversion, and availability of marine-grade components, an active valving hydraulic PTO is selected for this small-scale surge-type WEC.

energy conversion/systems↗

Validation of simulated wave energy converter responses to focused waves

Focused waves are increasingly used as a design method to predict extreme loads for offshore structures, such as wave energy converters (WECs). However, the ability of computational methods to accurately simulate the prescribed focused waves and resulting wave structure interactions is not well validated. This study uses two computational fluid dynamic methods, WEC-Sim and STAR-CCM+, to evaluate the responses of two taut-moored WEC-like buoys to three different focused waves. WEC-Sim is a computationally efficient, mid-fidelity model, based on linearised potential flow theory. In contrast, STAR-CCM+ is a high-fidelity, three-dimensional, unsteady, Reynolds-averaged Navier–Stokes-based model. The two buoy geometries considered are a hemispherical-bottom cylinder and a truncated cylinder with a cylindrical moon pool. Three prescribed focused waves are generated in both codes, and the simulated displacements and mooring loads are obtained for each of the hydrodynamic bodies. The resulting STAR-CCM+ generated focused waves have approximately the same accuracy, in comparison with the analytic solution, as experimentally generated focused waves. The WEC-Sim simulated responses, when using viscous coefficients tuned to the measured displacements, are, on average, within 11.5% of experimentally measured values, whereas the STAR-CCM+ simulated responses are, on average, within 14.2% of the experimental values.

16 TIDAL AND WAVE POWER↗

Controls Optimization Final Report, Controls Algorithms Report, Control Optimization - SPA II: Heaving Buoy Test Results [Three reports]

The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners’ WEC devices, including; CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on an at-sea prototype that is to be custom-built and maturing the HW and SW required to successfully run our advanced controls code frameworks on at-sea systems. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to RT capability, robustness, and reliability.

16 TIDAL AND WAVE POWER↗

Impact of Biofouling on Point Absorber Wave Energy Converter Performance and Control

Biofouling is a well-documented problem in naval engineering, but little is known about its effect on wave energy converter (WEC) performance. In this study, the software WEC-Sim is used to simulate the performance of a point absorber WEC that has been biofouled by “hard” species (e.g., mussels, barnacles) to varying degrees. Specifically, biofouling is assumed to change the nonlinear drag forces acting on the WEC, which have quantifiable effects on key performance characteristics such as optimal damping conditions, power, peak displacement, and peak velocity. The results of this analysis are then used to discuss strategies for WEC control as it relates to biofouling. Furthermore, the results show that average power production can decrease by as much as 15% with heavy biofouling and require an adjustment of the optimal control law by up to 20%.

Biofouling↗

A Comparison of Power Take-Off Architectures for Wave-Powered Reverse Osmosis Desalination of Seawater with Co-Production of Electricity

Several power take-off (PTO) architectures for wave-powered reverse osmosis (RO) desalination of seawater are introduced and compared based on the annual average freshwater production and the size of the components, which strongly relate to the costs of the system. The set of architectures compared includes a novel series-type PTO architecture not previously considered. These seawater hydraulic PTO architectures are composed of a WEC-driven pump, an RO module, an intake charge pump driven by an electric motor, and a hydraulic motor driving an electric generator for electric power production. This study is performed using an efficient two-way coupled steady-state model for the average performance of the system in a given sea state, including freshwater permeate production, electric power production, and electric power consumption. A multi-objective design problem is formulated for the purposes of this comparative study, with the objectives of maximizing annual freshwater production, minimizing the displacement of the WEC-driven pump, and minimizing the installed RO membrane area. This establishes a framework for comparison in the absence of a mature techno-economic model. The requirement that the system produces enough electric power to meet its consumption is applied as a constraint on the operation of the system. The oscillating wave surge converter Oyster 1 is assumed as the WEC. Weights on performance of the system in a given sea state are based on historical data from Humboldt Bay, CA. This study finds that (1) architectures in a series configuration allow for a reduction in the WEC-driven pump size of 59–92% compared to prior work, (2) varying the displacement of the WEC-driven pump between sea conditions does not provide any significant advantage in performance, and (3) varying the active RO membrane area between sea condition offers improvements between 7% and 41% in each design objective.

Energy & Fuels↗

The Wave Energy Converter Design Process: Methods Applied in Industry and Shortcomings of Current Practices

Wave energy is among the many renewable energy technologies being researched and developed to address the increasing demand for low-emissions energy. The unique design challenges for wave energy converter design—integrating complex and uncertain technological, economic, and ecological systems, overcoming the structural challenges of ocean deployment, and dealing with complex system dynamics—have lead to a disjointed progression of research and development. There is no common design practice across the wave energy industry and there is no published synthesis of the practices that are used by developers. In this paper, we summarize the methods being employed in WEC design as well as promising methods that have yet to be applied. We contextualize these methods within an overarching design process. We present results from a survey of WEC developers to identify methods that are common in industry. From the review and survey results, we conclude that the most common methods of WEC design are iterative methods in which design parameters are defined, evaluated, and then changed based on evaluation results. This leaves a significant space for improvement of methods that help designers make better-informed decisions prior to sophisticated evaluation, and methods of using the evaluation results to make better design decisions during iteration. Despite the popularity of optimization methods in academic research, they are less common in industry development. We end this paper with a summary of the areas of WEC design in which the testing and development of new methods is necessary, and where more research is required to fully understand the influence of design decisions on WEC performance.

16 TIDAL AND WAVE POWER↗

Use of a Compliant Tether to Decouple Observation Buoy Motion for Auxiliary Wave Power

With the growth of the Blue Economy, the volume of data collection within the ocean environment has been rapidly increasing. Larger numbers of oceanographic, meteorological, and floating Light Detection And Ranging (LiDAR) buoys have been collecting high fidelity measurements while pushing against power budget limits. Power limitations lead to infrequent transmission of reduced data sets or recording data to local storage that must be physically collected when the buoy is serviced. Triton Systems, Inc. and its partners are developing a retrofittable wave energy converter (WEC) to provide auxiliary power to these observation buoys to increase mission duration and power budget, improve reliability, and reduce the need for service trips. One of the greatest challenges has been developing a method to interface Triton's WEC with these buoys without impacting measurement fidelity. This is especially critical for inertial wave and LiDAR wind measurements collected with sensors that could be adversely affected by additional buoy dynamics introduced by an integrated WEC. To address this, Triton and EOM Offshore developed a compliant tether to pair an observation buoy with a floating WEC while decoupling relative motion. Based on EOM's proven stretch hose technology, this compliant tether transmits power and data between the buoy-WEC system. In conclusion, modeling shows that the system has the potential to minimally adversely affect oceanographic, meteorological, wind resource characterization, and other measurements, with future testing scheduled to validate modeling efforts.

16 TIDAL AND WAVE POWER↗

Numerical Modelling of a Two-Body Point Absorber Featuring Variable Geometry

This work presents a novel wave energy converter (WEC) device concept that incorporates variable geometry modules into a two-body point absorber type WEC. The variable geometry modules consist of air inflatable bags in the surface float and a water inflatable ring in the reaction body. The variable geometry floats are able to provide greater control over the device hydrodynamics; they can be inflated or deflated to emphasize either power absorption or load shedding. The device geometry is controlled in a quasi-static fashion, while the power take-off (PTO) unit is controlled on a wave-to-wave timescale. The surface float is tethered directly to the submerged reaction body through PTO tether lines. A linear time-domain analysis, conducted using open-source Wave Energy Converter (WEC-Sim) software, was used to estimate the absorbed power of the WEC in sea states defined by the Wave Energy Prize. WEC power performance was weighted against the expected capital cost of building the load bearing structure of the device, providing an estimated ACE value. The inclusion of the variable geometry modules was shown to be effective in altering the device geometry to improve power capture with a near proportional increase in expected costs, providing a nearly constant power-to-cost ratio.

cost of energy↗

Review of Wave Energy Converter Power Take-Off Systems, Testing Practices, and Evaluation Metrics: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.

laboratory testing↗

Power Take-Off Design Study for a Small-Scale Oscillating Surge Wave Energy Converter for Powering the Blue Economy Applications: Preprint

The power take-off (PTO) is an integral part of wave energy conversion, and the design process is nontrivial. Better PTOs, and better processes for selecting and designing PTO architectures for various applications, would benefit devices that assist in powering the blue economy by decreasing time and money spent on PTO design and increasing the overall energy capture performance of these devices. This paper chronicles the selection process of a PTO for a small-scale surge-type wave energy converter (WEC) for the purpose of informing future PTO selection processes. Three PTO architectures are evaluated in WEC-Sim: a hydraulic check valve PTO, a hydraulic active valving PTO, and a directly electrified PTO. Simple models of each PTO are constructed. Because a model for the small-scale device was initially unavailable, the PTOs are simulated on a large-scale device. The results are scaled down using Froude scaling and compared to results from directly simulating a small-scale model. Strong assumptions are made because this work is early in the design stages, and a coarse look at PTO options was desired. Specifically, the effectiveness of controls is investigated, along with the efficiency of energy conversion. However, energy capture is only part of the consideration; there are also logistic concerns to be considered when selecting a PTO. For example, components for large-scale WECs are so large and expensive that it may make sense to custom-build PTO components, but small- scale WECs would benefit from off-the-shelf availability because the cost of customization would be a significant portion of the total capital cost of deployment at a small scale. Submersible, off-the-shelf components are much easier to source for hydraulic PTOs. Because of highly effective controls, efficient energy conversion, and availability of marine-grade components, an active valving hydraulic PTO is selected for this small-scale surge-type WEC.

electric PTO↗