Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Simulated Transmission of the Dengue Virus Across the US-Mexico Border Using Remotely Sensed and Ground Based Weather Data

Incidence of dengue fever, caused by a mosquito transmitted virus, have increased in the Americas during recent decades. In the US, local transmission has been reported in southern Texas and Florida. However, despite its close proximity to dengue endemic areas in Mexico and the presence of a primary mosquito vector, there are no reports of local transmission in Arizona. Many studies have demonstrated that weather influences dengue virus transmission by regulating vector development rates, vector habitat availability, and the duration of the virus extrinsic incubation period (EIP). The EIP, the period between mosquito infection and the ability for it to retransmit the virus, is especially important given its high sensitivity to temperature and the short lifespan of mosquitoes. Other studies, however, have suggested that human related factors such as socioeconomic status and herd immunity may explain much of the disparity in dengue incidence in the US‐Mexico border region. Using a meteorologically driven model of vector population dynamics and virus transmission we compare simulations of dengue fever cases in southern Arizona and northern Mexico. A Monte Carlo approach is employed to select parameter values by evaluating simulations in Hermosillo Mexico with reported dengue fever case data. Simulations that replicate the case data best are retained and rerun using remotely sensed climate data from other Arizona and Mexico locations to determine the relative influence of weather on virus transmission. Although human and environmental factors undoubtedly influence dengue transmission in the US‐Mexico border regions, weather is a major facilitator of the transmission process.

Dengue↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power HIL Validation of a MW-Scale Grid-Forming Inverter's Stabilization of Otherwise Unstable Cases of the Maui Transmission System

This presentation summarizes MW-scale power hardware-in-the-loop experiments using a 2.2 MW grid-forming inverter connected to a real-time electromagnetic transient simulation of the Maui transmission system. The hardware inverter used is a commercially available "off-the-shelf" inverter from a major manufacturer that is capable of operating in grid-forming mode or grid-following mode. The hardware inverter was connected via power hardware-in-the-loop to a real-time model of the year-2023 Maui power system, which consists of a networked transmission system with diverse generation sources. The results of the simulations indicate that with sufficient synchronous machines online, the system is stable without grid-forming inverters, but that as the amount of synchronous machines is reduced, the system becomes unstable. Changing the hardware inverter (scaled up to represent a 30 MW plant) into grid-forming mode mitigates the instability in various low-inertia cases, including a zero-inertia scenario with 100% of generation from PV and wind. This result broadly agrees with pure simulation results.

battery energy storage system↗

Prioritized LT Codes

The original Luby Transform (LT) coding scheme is extended to account for data transmissions where some information symbols in a message block are more important than others. Prioritized LT codes provide unequal error protection (UEP) of data on an erasure channel by modifying the original LT encoder. The prioritized algorithm improves high-priority data protection without penalizing low-priority data recovery. Moreover, low-latency decoding is also obtained for high-priority data due to fast encoding. Prioritized LT codes only require a slight change in the original encoding algorithm, and no changes at all at the decoder. Hence, with a small complexity increase in the LT encoder, an improved UEP and low-decoding latency performance for high-priority data can be achieved. LT encoding partitions a data stream into fixed-sized message blocks each with a constant number of information symbols. To generate a code symbol from the information symbols in a message, the Robust-Soliton probability distribution is first applied in order to determine the number of information symbols to be used to compute the code symbol. Then, the specific information symbols are chosen uniform randomly from the message block. Finally, the selected information symbols are XORed to form the code symbol. The Prioritized LT code construction includes an additional restriction that code symbols formed by a relatively small number of XORed information symbols select some of these information symbols from the pool of high-priority data. Once high-priority data are fully covered, encoding continues with the conventional LT approach where code symbols are generated by selecting information symbols from the entire message block including all different priorities. Therefore, if code symbols derived from high-priority data experience an unusual high number of erasures, Prioritized LT codes can still reliably recover both high- and low-priority data. This hybrid approach decides not only "how to encode" but also "what to encode" to achieve UEP. Another advantage of the priority encoding process is that the majority of high-priority data can be decoded sooner since only a small number of code symbols are required to reconstruct high-priority data. This approach increases the likelihood that high-priority data is decoded first over low-priority data. The Prioritized LT code scheme achieves an improvement in high-priority data decoding performance as well as overall information recovery without penalizing the decoding of low-priority data, assuming high-priority data is no more than half of a message block. The cost is in the additional complexity required in the encoder. If extra computation resource is available at the transmitter, image, voice, and video transmission quality in terrestrial and space communications can benefit from accurate use of redundancy in protecting data with varying priorities.

Woo, Simon S.↗

Real-Time Interactive 4D-STEM Phase-Contrast Imaging From Electron Event Representation Data: Less computation with the right representation

The arrival of direct electron detectors (DED) with high frame-rates in the field of scanning transmission electron microscopy has enabled many experimental techniques that require collection of a full diffraction pattern at each scan position, a field which is subsumed under the name four dimensional-scanning transmission electron microscopy (4D-STEM). DED frame rates approaching 100 kHz require data transmission rates and data storage capabilities that exceed commonly available computing infrastructure. Current commercial DEDs allow the user to make compromises in pixel bit depth, detector binning or windowing to reduce the per-frame file size and allow higher frame rates. This change in detector specifications requires decisions to be made before data acquisition that may reduce or lose information that could have been advantageous during data analysis. The 4D Camera, a DED with 87 kHz frame-rate developed at Lawrence Berkeley National Laboratory, reduces the raw data to a linear-index encoded electron event representation (EER). Here we show with experimental data from the 4D Camera that linear-index encoded EER and its direct use in 4D-STEM phase contrast imaging methods enables real-time, interactive phase-contrast from large-area 4D-STEM datasets. Furthermore, we detail the computational complexity advantages of the EER and the necessary computational steps to achieve real-time interactive ptychography and center-of-mass differential phase contrast using commonly available hardware accelerators.

4D-STEM↗

Powering Large Loads: Solutions Across Transmission, Utility, and Facility Scales

This report synthesizes current strategies for accommodating large load growth through a review of publicly available technical literature and media insights around the United States (U.S.). Solutions are organized across three implementation scales (transmission, utility, and facility) and categorized according to common implementation pathways (including structural expansion, operations and efficiency, upgrades, and planning and policy).

Valdez, Raquel Lynn [Sandia National Laboratories ↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

Searching for Interstellar Quantum Communications

The modern search for extraterrestrial intelligence began with the seminal publications of Cocconi & Morrison and Schwartz & Townes, who proposed searching for narrowband signals in the radio spectrum and optical laser pulses. Over the last six decades, more than 100 dedicated search programs have targeted these wavelengths, all with null results. All of these campaigns searched for classical communications, that is, for a significant number of photons above a noise threshold, with the assumption of a pattern encoded in time and/or frequency space. I argue that future searches should also target quantum communications. They are preferred over classical communications with regard to security and information efficiency, and they would have escaped detection in all previous searches. The measurement of Fock state photons or squeezed light would indicate the artificiality of a signal. I show that quantum coherence is feasible over interstellar distances and explain for the first time how astronomers can search for quantum transmissions sent by ETI to Earth using commercially available telescopes and receiver equipment.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Comparative analyses of space-to-space central power stations

The technological and economical impact of a large central power station in Earth orbit on the performance and cost of future spacecraft and their orbital transfer systems are examined. It is shown that beaming power to remote users cannot be cost effective if the central power station uses the same power generation system that is readily available for provision of onboard power and microwave transmission and reception of power through space for use in space is not cost competitive with onboard power or propulsion systems. Laser and receivers are required to make central power stations feasible. Remote power transmission for propulsion of orbital transfer vehicles promises major cost benefits. Direct nuclear pumped or solar pumped laser power station concepts are attractive with laser thermal and laser electric propulsion systems. These power stations are also competitive, on a mass and cost basis, with a photovoltaic power station.

Holloway, P. F.↗

Advanced Gas Turbine (AGT) powertrain system initial development report

The powertrain consists of a single shaft regenerated gas turbine engine utilizing ceramic hot section components, coupled to a slit differential gearbox with an available variable stator torque converter and an available Ford intergral overdrive four-speed automatic transmission. Predicted fuel economy using gasoline fuel over the combined federal driving cycle (CFDC) is 15.3 km/1, which represents a 59% improvement over the spark-ignition-powered baseline vehicle. Using DF2 fuel, CFDC mileage estimates are 17.43 km/1. Zero to 96.6 km/hr acceleration time is 11.9 seconds with a four-second accleration distance of 21.0 m. The ceramic radial turbine rotor is discussed along with the control system for the powertrain.

Source record↗