Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

LMI Automated Air Cargo Operations Market Research and Forecast

Air cargo companies and aircraft manufacturers are making significant investments to enable the movement of cargo via various levels of automated aircraft, such as aircraft with simplified operations requiring a pilot, remotely monitored or piloted aircraft, and fully autonomous aircraft. These investments will enable greater utilization of aircraft while unlocking new air markets traditionally served by ground transportation only. Many cargo companies and aerospace experts envision an operating environment where a single pilot can remotely pilot numerous aircraft for significant increases in aircraft utilization. The future operating environment is also expected to include air cargo companies flying smaller aircraft from airports and distribution centers outside of major U.S. cities directly to city centers, avoiding congested roads and increasing the velocity of cargo shipments, particularly those that are high-value, time-sensitive, and security sensitive (e.g., pharmaceuticals). These are just a few benefits and use cases cargo companies and aerospace experts see with the advancement of automated aircraft. To better understand industry’s direction, NASA asked the LMI team to research the forecasted market, timeline, risks, and opportunities for integrating unmanned air cargo vehicles into the National Airspace System (NAS) for the development and prioritization of the NASA Air Traffic Management Exploration’s research portfolio. To begin the market assessment, we gathered data via numerous interviews with key stakeholders and subject matter experts and literature reviews. We then incorporated the data into a custom-developed systems dynamics model and visualization dashboard. The systems dynamics model classifies the size of the market (e.g., overall fleet size of automated aircraft) for four distinct use cases over the next 20 years. The model projects the year in which various types of automated aircraft will enter the commercial cargo market based on our team’s collective research on when the aircraft will become viable due to manufacturing and certification timelines and the lifespan of current, traditional aircraft in service, to name a few factors. While this report defines our team’s estimated timeline of entry and growth, the model is dynamic—it enables NASA users to change variables based on future-year events. If the necessary technology does not mature in accordance with our assumptions, then NASA can change the entry of service point to a future year to evaluate the changes in market size in the out years. This flexibility will be key to deciding when and how NASA should invest in various areas.

air traffic management↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Operational Implications from Field Test Results: Sensorimotor Guidelines for Exploration Missions

Two key sensorimotor objectives of the joint NASA-Russian Field Test (FT) study were (1) to quantify functional performance on long duration crewmembers as close to landing as possible, and (2) to develop a recovery timeline back to preflight baseline. The purpose of this presentation is to provide an overview of the FT results and discuss the operational implications for future exploration missions. The NASA and Russian teams conducted a total of 48 Field Tests, including 18 using a reduced Pilot FT (PFT) protocol. The combined PFT/FT cohort included 14 first-time fliers, 4F, and nine cosmonauts who repeated FT during a second mission. The mission durations were 185 ± 42 days, mean ± std. Nominally, the initial postflight session was performed in the medical test at the Soyuz landing site or at the nearby airport (R+2.2 ± 1.3 hrs, mean ± std), and then repeated multiple times throughout the postflight recovery. The common tasks performed across PFT and full FT protocols included sit-to-stand, recovery from fall (prone to stand) and tandem walk, performed in that order of increasing difficulty. The full FT protocol also included seated tasks (eccentric gaze, dysmetria finger to nose, eye-hand coordination on a tablet, grip force discrimination), a standing posture test with an upper body perturbation, a timed up and go mobility test with obstacles, and a dynamic visual acuity task during vertical oscillations. While there was considerable variability in the postflight outcome measures across crewmembers, the level of vestibular/cerebellar and sensorimotor impairment was greater than previously observed during shorter spaceflight missions. Most striking was the higher incidence of motion sickness even without constraining the standard medical interventions. Motion sensitivity prevented some crewmembers from attempting and/or completing the early testing. The recovery timeline varied with task complexity, generally taking longer when either the basis of support was limited (e.g., tandem walk) or visual cues were deprived (eyes closed). Based on this evidence, mission planners need to expect a range of response across individuals and tasks following G-transitions. Individual health assessments are recommended along with development of pre-worked, prioritized content and timelines, with the ability to change roles depending on crew readiness. Handholds and balance aids are recommended to help stabilize the crewmembers to perform specific tasks (e.g., touch screen selection) or to allow the crewmember the ability to rest with onset of symptoms. Based on anecdotal reports and performance on computerized dynamic posturography, multiple testing on landing day appeared to be beneficial for some participants, while others may have pushed beyond their motion tolerance limit in an effort to complete more FT objectives. Instead of delaying planetary surface operations to allow for recovery, our results suggest that early mobility may be important. Early active self-administered retraining, individualized based on the level of initial impairment and motion sensitivity, will enable a more efficient motor learning and enhance crew performance.

S J Wood↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

Savannah River National Laboratory Collaborative Innovation Pilot Team - 17560

The Collaborative Innovation (COIN) program was established by the Savannah River National Laboratory (SRNL) in March 2016. The goal of the SRNL COIN program is to identify innovative options to significantly reduce program and project risks (improve safety, reduce schedule and cost) of high priority Department of Energy Environmental Management, National Nuclear Security Administration, and Nuclear Energy missions. The COIN Advisory Board selected as the target outcome of the first COIN effort a 50% improvement to the Savannah River Site (SRS) H-Canyon spent nuclear fuel (SNF) processing 'baseline,' or current plan, as defined in the SRS Nuclear Materials Planning Roadmap. A small team of SRNL and Savannah River Nuclear Solutions personnel with pertinent experience and expertise was co-located and largely sequestered for eight weeks to identify improvements to H-Canyon processing of SNF. Following the process defined in the SRNL COIN Charter, the COIN Pilot Team analyzed the baseline for processing SNF through H Canyon; generated alternative ideas; tested seemingly viable ideas by reaching out to other subject-matter experts; and identified options for consideration for implementation by the COIN Advisory Board. The COIN Pilot produced a number of important outcomes, including important lessons learned for subsequent COIN efforts. The two principal outcomes are these: 1. The COIN Pilot Team conducted a comprehensive examination of the individual unit operations, the integrated system, and external interfaces to produce a timeline of H-Canyon processing and sampling times that had not previously existed. The general timeline served as the baseline from which the Pilot Team identified processing improvements. In addition, the timeline has already been employed in other planning efforts. 2. The COIN Pilot Team determined that innovations to the H-Canyon Dissolving unit operation alone could increase the number of SNF bundles processed through H Canyon by the target of 50%, but with little margin for error. To ensure that the gains in throughput in the Dissolving unit operation would be maintained throughout the facility, the Pilot Team identified four additional improvements to create greater efficiency and flexibility in downstream H-Canyon unit operations. The COIN Pilot Team's innovations reduce the processing time of a single batch of SNF through H Canyon from about 70 days to about 50 days. This talk will review the COIN process and the results of the pilot of the process. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

A pilot oral history of plant synthetic biology

The whole field of synthetic biology (SynBio) is only about 20 years old, and plant SynBio is younger still. Nevertheless, within that short time, SynBio in general has drawn more scientific, philosophical, government, and private-sector interest than anything in biology since the recombinant DNA revolution. Plant SynBio, in particular, is now drawing more and more interest in relation to plants’ potential to help solve planetary problems such as carbon capture and storage and replacing fossil fuels and feedstocks. As plant SynBio is so young and so fast-developing, we felt it was too soon to try to analyze its history. Instead, we set out to capture the essence of plant SynBio's origins and early development through interviews with 8 of the field's founders, representing 5 countries and 3 continents. We then distilled these founders’ personal recollections and reflections into this review, centering the narrative on timelines for pivotal events, articles, funding programs, and quoting from interviews. We have archived the interview recordings and documented timeline entries. This work provides a resource for future historical scholarship.

59 BASIC BIOLOGICAL SCIENCES↗

MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication between all parties involved in the TP process increasing patient safety.

60 APPLIED LIFE SCIENCES↗

TH-A-204-00: Key Dosimetry Data - Impact of New ICRU Recommendations

The ICRU is currently finalizing a report on key data for radiation dosimetry. This multi-year review has resulted in a number of recommendations regarding “fundamental” data that are used in dosimetry related to radiation therapy. This educational session will explain the background for the ICRU committee’s work, the content and conclusions of the report and the impact on outputs, including NIST primary standards, ADCL calibration coefficients and clinical reference dosimetry. Parameters and beam modalities potentially affected by this report include: The mean excitation energy, I, for graphite, air, and water, The average energy required to create an ion pair in dry air (commonly referred to as W/e), The uncertainty in the determination of air kerma in kV xrays The absolute value of Co-60 and Cs-137 primary standards and the dissemination of calibration coefficients, The determination of air kerma strength for Ir-192 HDR brachytherapy sources Ion chamber kQ factors for linac MV beams Ion chamber kQ factors for proton beams. The changes in reference dosimetry that would result from adoption of the ICRU recommendations are of the order of 0.5% to 1%, an effect that will not impact clinical dose delivery but will be detectable in the clinical setting. This session will also outline how worldwide metrology is coordinated through the Convention of the Meter and therefore how the international dosimetry community will proceed with adopting these recommendations so that uniformity from country to country in reference dosimetry is maintained. Timelines and communications methods will also be discussed to ensure that users, such as clinical medical physicists, are not surprised when their chamber’s calibration coefficient apparently changes. Learning Objectives: Understand the background for the ICRU committee’s work on key dosimetry data. Understand the proposed changes to key data and the impacts on reference dosimetry. Understand the methodology and timeline for adoption of the ICRU recommendations.

07 ISOTOPE AND RADIATION SOURCES↗

TH-A-204-01: Part I - Key Data for Ionizing-Radiation Dosimetry

The ICRU is currently finalizing a report on key data for radiation dosimetry. This multi-year review has resulted in a number of recommendations regarding “fundamental” data that are used in dosimetry related to radiation therapy. This educational session will explain the background for the ICRU committee’s work, the content and conclusions of the report and the impact on outputs, including NIST primary standards, ADCL calibration coefficients and clinical reference dosimetry. Parameters and beam modalities potentially affected by this report include: The mean excitation energy, I, for graphite, air, and water, The average energy required to create an ion pair in dry air (commonly referred to as W/e), The uncertainty in the determination of air kerma in kV x-rays The absolute value of Co-60 and Cs-137 primary standards and the dissemination of calibration coefficients, The determination of air kerma strength for Ir-192 HDR brachytherapy sources Ion chamber kQ factors for linac MV beams Ion chamber kQ factors for proton beams. The changes in reference dosimetry that would result from adoption of the ICRU recommendations are of the order of 0.5% to 1%, an effect that will not impact clinical dose delivery but will be detectable in the clinical setting. This session will also outline how worldwide metrology is coordinated through the Convention of the Meter and therefore how the international dosimetry community will proceed with adopting these recommendations so that uniformity from country to country in reference dosimetry is maintained. Timelines and communications methods will also be discussed to ensure that users, such as clinical medical physicists, are not surprised when their chamber’s calibration coefficient apparently changes. Learning Objectives: Understand the background for the ICRU committee’s work on key dosimetry data. Understand the proposed changes to key data and the impacts on reference dosimetry. Understand the methodology and timeline for adoption of the ICRU recommendations.

60 APPLIED LIFE SCIENCES↗

TH-A-204-02: Part II - Worldwide Radiation Metrology

The ICRU is currently finalizing a report on key data for radiation dosimetry. This multi-year review has resulted in a number of recommendations regarding “fundamental” data that are used in dosimetry related to radiation therapy. This educational session will explain the background for the ICRU committee’s work, the content and conclusions of the report and the impact on outputs, including NIST primary standards, ADCL calibration coefficients and clinical reference dosimetry. Parameters and beam modalities potentially affected by this report include: The mean excitation energy, I, for graphite, air, and water, The average energy required to create an ion pair in dry air (commonly referred to as W/e), The uncertainty in the determination of air kerma in kV x-rays The absolute value of Co-60 and Cs-137 primary standards and the dissemination of calibration coefficients, The determination of air kerma strength for Ir-192 HDR brachytherapy sources Ion chamber kQ factors for linac MV beams Ion chamber kQ factors for proton beams. The changes in reference dosimetry that would result from adoption of the ICRU recommendations are of the order of 0.5% to 1%, an effect that will not impact clinical dose delivery but will be detectable in the clinical setting. This session will also outline how worldwide metrology is coordinated through the Convention of the Meter and therefore how the international dosimetry community will proceed with adopting these recommendations so that uniformity from country to country in reference dosimetry is maintained. Timelines and communications methods will also be discussed to ensure that users, such as clinical medical physicists, are not surprised when their chamber’s calibration coefficient apparently changes. Learning Objectives: Understand the background for the ICRU committee’s work on key dosimetry data. Understand the proposed changes to key data and the impacts on reference dosimetry. Understand the methodology and timeline for adoption of the ICRU recommendations.

60 APPLIED LIFE SCIENCES↗

Methodology to Compare Twitter Reaction Trends between Disinformation Communities, to COVID related Campaign Events at Different Geospatial Granularities

With still ongoing COVID pandemic, there is an immediate need for a deeper understanding of how Twitter discussions (or chatters) in disinformation spreading communities get triggered. More specifically, the value is in monitoring how such trigger events in Twitter discussion do align with the timelines of relevant influencing events in the society (indicated in this work as campaign events). For campaign events in regards to COVID pandemic, we consider both NPI (Nonpharmaceutical Interventions) campaigns and disinformation spreading campaigns together. In this short paper we have presented a novel methodology to quantify, compare and relate two Twitter disinformation communities, in terms of their reaction patterns to the timelines of major campaign events. We have also analyzed these campaigns at their three geospatial granularity contexts: local county, state, and country/ federal. We have conducted a novel dataset collection on campaigns (NPI + Disinformation) at these different geospatial granularities. Then, with collected dataset on Twitter disinformation communities, we have performed a case study to validate our proposed methodology.

De, Debraj↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for Radioisotope Power Systems for Nuclear-Enabled Launches

The use of radioisotope power systems (RPSs) for nuclear-enabled National Aeronautics and Space Administration (NASA) missions is made possible through a long-standing arrangement between the Department of Energy (DOE) and NASA. The requirements for the power system come from NASA, but DOE performs the procurement, fueling, testing, and delivery. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling have always been delayed until the final selection of a mission. The timeline for a New Frontiers–class mission leaves approximately 5 to 6 years from the time of final mission selection to the actual launch date. The number of RPSs used for a New Frontiers–class mission can be one to three units. If one or two units are needed, the timeline from the decision point to the launch date is a challenge, but it is achievable. The activities taking place include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires three RPSs, the logistics of accomplishing all activities during the 5–6 years is problematic. The challenge involves obtaining the necessary resources for plutonium production, heat source production, and assembly/testing operations. Typically, the time between RPS-enabled missions requires staffing reduction down to 65%–75% of peak staffing levels to reduce costs. Coupling the ~2 year duration needed for hiring, training, and obtaining the appropriate security clearances for the required staff with the requirement for the RPS to arrive at Kennedy Space Center 6 months before the launch erodes much of the 5–6 years available to comfortably support the use of three RPSs. To provide better support for NASA RPS missions, a different approach for the production of heat sources was devised—constant rate production. This involves a higher level of base capability at DOE national laboratories to provide a stabilized workforce. This will enable 10–15 heat sources to be produced annually and placed into a stable intermediate form to enable storage for up to several years leading to quick production of general purpose heat source modules when a mission is selected. The upfront production of 238 Pu is maintained so material is constantly in the pipeline. Production of key specialized components is also maintained using this model.

42 ENGINEERING↗

Strategic styles of hardware product development could accelerate commercialization in cleantech startups

Hardware-based startups risk having longer times-to-market, deterring investment in the clean technologies that are critical to a sustainable future. We interviewed 55 leaders at hardware startups, 20 of which are cleantech, mapped their development timelines, and found prototyping to be the longest development step (median of 19 weeks per prototype) regardless of prototype complexity or iteration. Qualitative interview analysis reveals the prototyping team’s choice of development style is a major factor affecting timeline. We define two development styles: natural and structured, typified by free-form exploration and rule-based execution, respectively. On average, natural development takes 35% less time than structured, and is thus preferred for early iterations, but adopting structure at strategic points is needed for timely commercialization. Critical points of transition to a structured style include adding new team members or engaging external partners, which demand clear communication and expectations. When pivoting to a new product or market, returning to a natural style is beneficial.

Looney, Erin (ORCID:0000000168959312)↗