Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “temperature verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Remote sounding of cloudy atmospheres. II - Multiple cloud formations

The dual frequency-range principle developed in Part I (Chahine, 1974) for infrared remote sounding of atmospheric temperature profiles in the presence of a single cloud layer is extended here to the case of multiple cloud formations. The approach requires no a priori knowledge of the spectral properties of the clouds or the number of cloud layers in the fields of view. The method of solution requires measurements over adjacent fields of view and leads to the determination of the clear-column atmospheric temperature profiles with the same degree of accuracy and vertical resolution permitted under cloudless conditions. Numerical verifications are carried out to illustrate the stability and accuracy of the method using simulated radiance data, from the 4.3 and 15 micron CO2 bands in the terrestrial atmosphere, in the presence of up to three cloud layers in the fields of view.

Chahine, M. T.↗

Hot-spot heating in central-station arrays

Hot spot tests performed on the Sacramento Municipal Utility District (SMUD) verificaton array show that current imbalance occurs, resulting in significant hot spot heating. One cause of current imbalance is differences in the average shunt resistances of parallel cell strings due to cell shunt resistance variations. In depth hot spot tests are performed on the verification array with bypass diodes. The tests had several objectives: (1) a comparison of hot spot temperatures achieved under field conditions with those obtained with the present laboratory hot spot test using similar modules; (2) an assessment of current imbalance versus cross tie frequency; and (3) an assessment of different shadow patterns and shadow densities. Instrumented modules are used to vary the number of cross ties and to measure the test-cell current and back-bias voltage. The widths, lengths, and densities of the shadows are varied to maximize the back bias voltage at maximum power current. An infrared camera is used to indicate the existence of hot spots and estimate temperature increases in conjunction with thermocouples. The results of these hot spot tests indicate a sensitivity of back bias heating to the shadow size (amount of cell coverage) and density.

Gonzalez, C. C.↗

Fire safety experiments on MIR Orbital Station

The process of heterogeneous combustion of most materials under zero-g without forced motion of air is practically impossible. However, ventilation is required to support astronauts' life and cool equipment. The presence of ventilation flows in station compartments at accidental ignition can cause a fire. An additional, but exceedingly important parameter of the fire risk of solid materials under zero-g is the minimum air gas velocity at which the extinction of materials occurs. Therefore, the conception of fire safety can be based on temporarily lowering the intensity of ventilation and even turning it off. The information on the limiting conditions of combustion under natural conditions is needed from both scientific and practical points of view. It will enable us to judge the reliability of results of ground-based investigations and develop a conception of fire safety of inhabited sealed compartments of space stations to by provided be means of nontraditional and highly-effective methods without both employing large quantities of fire-extinguishing compounds and hard restrictions on use of polymers. In this connection, an experimental installation was created to study the process of heterogeneous combustion of solid non-metals and to determine the conditions of its extinction under microgravity. This installation was delivered to the orbital station 'Mir' and the cosmonauts Viktorenko and Kondakova performed initial experiments on it in late 1994. The experimental installation consists of a combustion chamber with an electrical systems for ignition of samples, a device for cleaning air from combustion products, an air suction unit, air pipes and a control panel. The whole experiment is controlled by telemetry and recorded with two video cameras located at two different places. Besides the picture, parameters are recorded to determine the velocity of the air flow incoming to the samples, the time points of switching on/off the devices, etc. The combustion chamber temperature is also controlled. The main objectives of experiments of this series were as follows: (1) verification of the reliability of the installation in orbital flight; (2) verification of the experimental procedure; and (3) investigation of combustion of two types of materials under microgravity at various velocities of the incoming air flow.

Egorov, S. D.↗

Scatterometer-Calibrated Stability Verification Method

The requirement for scatterometer-combined transmit-receive gain variation knowledge is typically addressed by sampling a portion of the transmit signal, attenuating it with a known-stable attenuation, and coupling it into the receiver chain. This way, the gain variations of the transmit and receive chains are represented by this loop-back calibration signal, and can be subtracted from the received remote radar echo. Certain challenges are presented by this process, such as transmit and receive components that are outside of this loop-back path and are not included in this calibration, as well as the impracticality for measuring the transmit and receive chains stability and post fabrication separately, without the resulting measurement errors from the test set up exceeding the requirement for the flight instrument. To cover the RF stability design challenge, the portions of the scatterometer that are not calibrated by the loop-back, (e.g., attenuators, switches, diplexers, couplers, and coaxial cables) are tightly thermally controlled, and have been characterized over temperature to contribute less than 0.05 dB of calibration error over worst-case thermal variation. To address the verification challenge, including the components that are not calibrated by the loop-back, a stable fiber optic delay line (FODL) was used to delay the transmitted pulse, and to route it into the receiver. In this way, the internal loopback signal amplitude variations can be compared to the full transmit/receive external path, while the flight hardware is in the worst-case thermal environment. The practical delay for implementing the FODL is 100 s. The scatterometer pulse width is 1 ms so a test mode was incorporated early in the design phase to scale the 1 ms pulse at 100-Hz pulse repetition interval (PRI), by a factor of 18, to be a 55 s pulse with 556 s PRI. This scaling maintains the duty cycle, thus maintaining a representative thermal state for the RF components. The FODL consists of an RF-modulated fiber-optic transmitter, 20 km SMF- 28 standard single-mode fiber, and a photodetector. Thermoelectric cooling and insulating packaging are used to achieve high thermal stability of the FODL components. The chassis was insulated with 1-in. (.2.5-cm) thermal isolation foam. Nylon rods support the Micarta plate, onto which are mounted four 5-km fiber spool boxes. A copper plate heat sink was mounted on top of the fiber boxes (with thermal grease layer) and screwed onto the thermoelectric cooler plate. Another thermal isolation layer in the middle separates the fiberoptics chamber from the RF electronics components, which are also mounted on a copper plate that is screwed onto another thermoelectric cooler. The scatterometer subsystem fs overall stability was successfully verified to be calibratable to within 0.1 dB error in thermal vacuum (TVAC) testing with the fiber-optic delay line, while the scatterometer temperature was ramped from 10 to 30 C, which is a much larger temperature range than the worst-case expected seasonal variations.

McWatters, Dalia A.↗

NEXT Thruster Component Verification Testing

Component testing is a critical part of thruster life validation activities under NASA s Evolutionary Xenon Thruster (NEXT) project testing. The high voltage propellant isolators were selected for design verification testing. Even though they are based on a heritage design, design changes were made because the isolators will be operated under different environmental conditions including temperature, voltage, and pressure. The life test of two NEXT isolators was therefore initiated and has accumulated more than 10,000 hr of operation. Measurements to date indicate only a negligibly small increase in leakage current. The cathode heaters were also selected for verification testing. The technology to fabricate these heaters, developed for the International Space Station plasma contactor hollow cathode assembly, was transferred to Aerojet for the fabrication of the NEXT prototype model ion thrusters. Testing the contractor-fabricated heaters is necessary to validate fabrication processes for high reliability heaters. This paper documents the status of the propellant isolator and cathode heater tests.

Pinero, Luis R.↗

Toward Improved Land Surface Initialization in Support of Regional WRF Forecasts at the Kenya Meteorological Department

Flooding and drought are two key forecasting challenges for the Kenya Meteorological Department (KMD). Atmospheric processes leading to excessive precipitation and/or prolonged drought can be quite sensitive to the state of the land surface, which interacts with the boundary layer of the atmosphere providing a source of heat and moisture. The development and evolution of precipitation systems are affected by heat and moisture fluxes from the land surface within weakly-sheared environments, such as in the tropics and sub-tropics. These heat and moisture fluxes during the day can be strongly influenced by land cover, vegetation, and soil moisture content. Therefore, it is important to represent the land surface state as accurately as possible in numerical weather prediction models. Enhanced regional modeling capabilities have the potential to improve forecast guidance in support of daily operations and high-end events over east Africa. KMD currently runs a configuration of the Weather Research and Forecasting (WRF) model in real time to support its daily forecasting operations, invoking the Nonhydrostatic Mesoscale Model (NMM) dynamical core. They make use of the National Oceanic and Atmospheric Administration / National Weather Service Science and Training Resource Center's Environmental Modeling System (EMS) to manage and produce the WRF-NMM model runs on a 7-km regional grid over eastern Africa. Two organizations at the National Aeronautics and Space Administration Marshall Space Flight Center in Huntsville, AL, SERVIR and the Short-term Prediction Research and Transition (SPoRT) Center, have established a working partnership with KMD for enhancing its regional modeling capabilities. To accomplish this goal, SPoRT and SERVIR will provide experimental land surface initialization datasets and model verification capabilities to KMD. To produce a land-surface initialization more consistent with the resolution of the KMD-WRF runs, the NASA Land Information System (LIS) will be run at a comparable resolution to provide real-time, daily soil initialization data in place of interpolated Global Forecast System soil moisture and temperature data. Additionally, real-time green vegetation fraction data from the Visible Infrared Imaging Radiometer Suite will be incorporated into the KMD-WRF runs, once it becomes publicly available from the National Environmental Satellite Data and Information Service. Finally, model verification capabilities will be transitioned to KMD using the Model Evaluation Tools (MET) package, in order to quantify possible improvements in simulated temperature, moisture and precipitation resulting from the experimental land surface initialization. The transition of these MET tools will enable KMD to monitor model forecast accuracy in near real time. This presentation will highlight preliminary verification results of WRF runs over east Africa using the LIS land surface initialization.

Case. Jonathan↗

Real-Time Kennedy Space Center and Cape Canaveral Air Force Station High-Resolution Model Implementation and Verification

Customer: NASA's Launch Services Program (LSP), Ground Systems Development and Operations (GSDO), and Space Launch System (SLS) programs. NASA's LSP, GSDO, SLS and other programs at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) use the daily and weekly weather forecasts issued by the 45th Weather Squadron (45 WS) as decision tools for their day-to-day and launch operations on the Eastern Range (ER). For example, to determine if they need to limit activities such as vehicle transport to the launch pad, protect people, structures or exposed launch vehicles given a threat of severe weather, or reschedule other critical operations. The 45 WS uses numerical weather prediction models as a guide for these weather forecasts, particularly the Air Force Weather Agency (AFWA) 1.67 kilometer Weather Research and Forecasting (WRF) model. Considering the 45 WS forecasters' and Launch Weather Officers' (LWO) extensive use of the AFWA model, the 45 WS proposed a task at the September 2013 Applied Meteorology Unit (AMU) Tasking Meeting requesting the AMU verify this model. Due to the lack of archived model data available from AFWA, verification is not yet possible. Instead, the AMU proposed to implement and verify the performance of an ER version of the AMU high-resolution WRF Environmental Modeling System (EMS) model (Watson 2013) in real-time. The tasking group agreed to this proposal; therefore the AMU implemented the WRF-EMS model on the second of two NASA AMU modeling clusters. The model was set up with a triple-nested grid configuration over KSC/CCAFS based on previous AMU work (Watson 2013). The outer domain (D01) has 12-kilometer grid spacing, the middle domain (D02) has 4-kilometer grid spacing, and the inner domain (D03) has 1.33-kilometer grid spacing. The model runs a 12-hour forecast every hour, D01 and D02 domain outputs are available once an hour and D03 is every 15 minutes during the forecast period. The AMU assessed the WRF-EMS 1.33-kilometer domain model performance for the 2014 warm season (May-September). Verification statistics were computed using the Model Evaluation Tools, which compared the model forecasts to observations. The mean error values were close to 0 and the root mean square error values were less than 1.8 for mean sea-level pressure (millibars), temperature (degrees Kelvin), dewpoint temperature (degrees Kelvin), and wind speed (per millisecond), all very small differences between the forecast and observations considering the normal magnitudes of the parameters. The precipitation forecast verification results showed consistent under-forecasting of the precipitation object size. This could be an artifact of calculating the statistics for each hour rather than for the entire 12-hour period. The AMU will continue to generate verification statistics for the 1.33-kilometer WRF-EMS domain as data become available in future cool and warm seasons. More data will produce more robust statistics and reveal a more accurate assessment of model performance. Once the formal task was complete, the AMU conducted additional work to better understand the wind direction results. The results were stratified diurnally and by wind speed to determine what effects the stratifications would have on the model wind direction verification statistics. The results are summarized in the addendum at the end of this report. In addition to verifying the model's performance, the AMU also made the output available in the Advanced Weather Interactive Processing System II (AWIPS II). This allows the 45 WS and AMU staff to customize the model output display on the AMU and Range Weather Operations AWIPS II client computers and conduct real-time subjective analyses. In the future, the AMU will implement an updated version of the WRF-EMS model that incorporates local data assimilation. This model will also run in real-time and be made available in AWIPS II.

Numerical Weather Prediction↗

Improvement in the Thermal-to-Structural Model Mapping Process for Integrated Modeling for the Roman Space Telescope

Integrated Modeling has been a key component of verifying optical requirements for the Nancy Grace Roman Space Telescope (RST) that are either impossible or impractical to verify exclusively through ground testing. Two major areas for integrated Modeling are Jitter and Thermal Distortion that require the exchanges of model performance predictions across disciplines. In both cases, distortions are impressed on optical models to evaluate the impact on boresight alignment and wave front error. In the case of Jitter, the disturbances are driven by reactions to motions most often from actuators; however, in the case of thermal distortion, the motions are driven by thermal expansion or contraction as a result of changing temperatures. This then requires a link further upstream to the thermal model, which is used to predict the thermal performance and temperature gradients and stability. The process for mapping temperatures from a thermal model to a corresponding structural model has been performed numerous times through the RST project lifecycle, with improvements in the accuracy, verification, and effort sought throughout. This paper describes some of the recent improvements to the process, including: capture of the visualization parameters, automatic generation of the mapped images for both the thermal and structural model groupings, and reduction in the effort to assemble the full set of mapped temperatures. These upgrades have greatly reduced the manual effort associated with thermal mapping and allowed for faster turn-around of Integrated Modeling predictions.

Thermal Mapping↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method developed to verify commercial printed-circuit boards for a Shuttle orbital flight is discussed. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Temperature definition and vibration tests are performed next. Final assembly testing is performed to simulate the Shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 h of trouble-free operation. Verification is successful when all components and final assemblies have passed each test. This method was very successful in verifying that commercial printed-circuit boards will survive in the Shuttle environment.

Foster, William M., II↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.

Foster, William M., II↗

Pressure and heat transfer investigation of a modified NASP baseline configuration at M = 6

A cooperative NASA Langley-Boeing investigation was conducted in the Langley eight-Foot High Temperature Tunnel to obtain hypersonic pressure and heat transfer data. In this investigation a large scale (1/20), modified version of the National Aero-Space Plane configuration known as the 'Government Baseline' was tested at a nominal Mach number of 6; at two Reynolds numbers (0.6 and 1.6 million per foot); and at angles of attack from about 0 to 15 deg. There were several purposes for the investigation: to provide a windward and leeward pressure and heat transfer data base for a realistic configuration for verification of computational methods, to provide these data for a large-scale model, and to provide these data for true temperature conditions because of concern about data from low temperature tunnels.

Reubush, David E.↗

Considerations in STS payload environmental verification

Considerations regarding the Space Transportation System (STS) payload environmental verification are reviewed. It is noted that emphasis is placed on testing at the subassembly level and that the basic objective of structural dynamic payload verification is to ensure reliability in a cost-effective manner. Structural analyses consist of: (1) stress analysis for critical loading conditions, (2) model analysis for launch and orbital configurations, (3) flight loads analysis, (4) test simulation analysis to verify models, (5) kinematic analysis of deployment/retraction sequences, and (6) structural-thermal-optical program analysis. In addition to these approaches, payload verification programs are being developed in the thermal-vacuum area. These include the exposure to extreme temperatures, temperature cycling, thermal-balance testing and thermal-vacuum testing.

Keegan, W. B.↗

Upper atmospheric section

Research, technology and monitoring of the upper atmosphere are summarized. Temperature response and polyatomic molecule decomposition in the stratosphere during a geomagnetic storm and the fabrication and verification of software for the atmospheric emissions photometric imager on Spacelab are described.

Source record↗

Development of a static feed water electrolysis system

A one person level oxygen generation subsystem was developed and production of the one person oxygen metabolic requirements, 0.82 kg, per day was demonstrated without the need for condenser/separators or electrolyte pumps. During 650 hours of shakedown, design verification, and endurance testing, cell voltages averaged 1.62 V at 206 mA/sq cm and at average operating temperature as low as 326 K, virtually corresponding to the state of the art performance previously established for single cells. This high efficiency and low waste heat generation prevented maintenance of the 339 K design temperature without supplemental heating. Improved water electrolysis cell frames were designed, new injection molds were fabricated, and a series of frames was molded. A modified three fluid pressure controller was developed and a static feed water electrolysis that requires no electrolyte in the static feed compartment was developed and successfully evaluated.

Schubert, F. H.↗

Determination of the horizontal and vertical distribution of clouds from infrared satellite sounding data

A numerical algorithm, based on a physical inversion of the radiative transfer equation, is developed to retrieve the global distribution of the horizontal cloud cover, the cloud-top pressure levels and their temperature. The algorithm makes use of infrared and microwave temperature sounding data to derive the clear-column vertical temperature profiles and then uses the same infrared sounding data to obtain the corresponding cloud parameters. Experimental verification of this method is carried out using data from the High resolution Infrared Sounder (HIRS) and the Microwave Sounding Unit (MSU) operating on the NOAA weather satellite system.

Chahine, M. T.↗

Orbital maneuvering vehicle thermal design and analysis techniques

This paper describes the OMV thermal design that is required to maintain components within temperature limits for all mission phases. A key element in the OMV thermal design is the application of a motorized thermal shade assembly that is a replacement for the more conventional variable conductance heat pipes or louvers. The thermal shade assembly covers equipment module radiator areas, and based upon the radiator temperature input to onboard computer, opens and closes the shade, varying the effective radiator area. Thermal design verification thermal analyses results are presented. Selected thermal analyses methods, including several unique subroutines, are discussed. A representation of enclosure Script F equations, in matrix form, is also included. Personal computer application to the development of the OMV thermal design is summarized.

Chapter, J.↗

Marshall Space Flight Center head development program

This report summarizes the results of the candidate head evaluation for the new long-life magnetic head per the SOW of Contract No. NAS8-39407, MSFC Head Development Program. The original program plans were to test a candidate head, fabricate a new head, then qualify the new head. These activities were scheduled to be carried out between March 1993 and March 1994. The program was halted after the evaluation of the candidate head by NAS8-39407 Amendment No. 4. MSFC has provided and authorized the use the MARS-2000 SRB QUAL Recorder PN 10400-0677-801 - Serial Number 200004 (Datatape PN 591000 - Serial Number 1004), Reproduce Amplifier Module (RAM) Datatape PN 533040 - Serial Number 2006, associated cables, and magnetic tape on special SRB/DFI tapered reels to Datatape for this program. All the testing that has been done for the candidate head evaluation was done at Datatape's facility in Pasadena,CA. The testing was performed in a Class 100,000 particle counts clean room at ambient temperature, except for the thermal testing which was conducted in a different area at Datatape. The Performance Verification Test Procedure PVT-11004-4 (PVT) and Acceptance Test Procedure ATP-11004-09 (ATP) procedures were used when tests were conducted on the recorder.

Harrer, Jim↗

Research capabilities of the NASA Langley 8-foot high temperature tunnel

The NASA Langley Research Center's 8-Foot High Temperature Tunnel (8' HTT) has been modified to facilitate the testing of hypersonic airbreathing propulsion systems in addition to aerothermal load definition and structural concept verification at Mach 4, 5, and 7. The 8' HTT simulates flight from 60 to 125 kft with run times of 1 to 2 min. The 8-ft diameter and 12-ft-long free jet length enables the testing of large engines or multiple subscale engines. Methane and air combustion products provide the true temperature environment; an oxygen system enriches the combustion products to the same volume fraction of oxygen as air to enable the testing of airbreathing engines. A hydrogen system provides model fuel for cooling and combustion. High use tunnel components have been upgraded or replaced.

Puster, Richard L.↗