X-66 Sustainable Flight Demonstrator: A Government/Industry Partnership to Mature Transonic Truss Braced Wing Technology
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The U.S. coal industry is experiencing a sharp increase in the numbers of retired and/or decommissioned coal-fired power plants across the U.S. In the years between 2010-2019, around 102 gigawatts (GW) of coal-fired generating capacity has been announced to be decommissioned, representing more than 546 coal-fired power plant units, and an additional 17 GW is planned to be decommissioned by 2025. This change in the energy production landscape presents an impact on the social, environmental, and economic prospects of coal-dependent communities. This report examined the role of communities in the coal power plant decommissioning process and provided community-identified best practices to ensure an equitable process. The experiences of four coal-dependent communities—Wise County, VA, Muskegon, MI, Anderson County, TN, and Becker, MN—are presented as case studies to understand the impacts of the decommissioning process, and associated best practices, from the communities’ perspective. The report results highlight the need to recognize that the decommissioning decision-making process must be community-based to be equitable. Each community’s input is key to the transition away from coal power because there is no one-size-fits-all development plan. In other words, each community’s trajectory through the decommissioning process—from the retirement decision-making stage to the final site redevelopment phase—is unique because each community has distinct needs and wants from the energy transition. What is best for one community may not be suited for another. Ultimately, the framework for site development and community revitalization post-decommissioning cannot be universal because each community’s profile—from a social, cultural, and economic perspective—is different. Community impacts of power plant decommissioning are not limited to job and revenue losses. Communities are likely to be impacted culturally, socially, environmentally, and have long-term health-based impacts that should be acknowledged and addressed in post-retirement plans. Commonly identified decommissioning best practices include: Early and continued engagement throughout, with a number of mediums for communication and feedback (e.g., in-person sessions, virtual meetings, written comment opportunities); Early planning of post-decommissioning projects to replace lost jobs, revenue, and economic activity; Recognition (and mitigation, if possible) of social impacts on the community due to plant closure; Transparency throughout the process, with trusted information being provided about the decommissioning process and timeline; potential impacts on the workforce, economy, and environment; and the feasibility of alternative site uses; Identification of funding sources, technical experts, and/or strategic partnerships to support decommissioning and the affected communities upfront; and, Acknowledgment of communities as stakeholders who have a role in the conversation and right to determine their futures. Three key areas for assisting coal-dependent communities affected by the energy transition: Technical assistance: assessment of site feasibility for alternative uses or to repower with new technologies; Cross-partnership engagement and collaboration: facilitate knowledge-sharing of “lessons learned” about the decommissioning process between communities and provide guidance for decision-making processes; and, Financial assistance: access to grant and/or loan programs to assist with redevelopment survey, bolster community economic security through job creation, and cover environmental clean-up costs. Technical assistance, cross-partnership engagement, and financial aid can be mobilized to help communities throughout various stages of the decommissioning process, including the retirement decision, the site reclamation phase, and eventual revitalization of the site and surrounding community.
Introduction: The National Aeronautics and Space Administration (NASA) is embarking on a bold journey to return humankind to the Moon and onward to Mars with innovative commercial, international, and academic partnerships. Under the Artemis series of missions, NASA seeks to establish sustained human exploration of deep space through an objectives-based approach. This approach drives the identification of needed system functionality and the current and future capabilities which will eventually allow humanity to sustainably live beyond Earth. Providing evolvable and scalable habitation is a cornerstone function that calls for the collection and integration of current, developmental, and future technologies that can meet near-term exploration needs while growing into long-term sustained presence. NASA is advancing in-space habitation through its Next Space Technologies for Exploration Partnerships (NextSTEP) model while designing lunar, Mars transit, and Mars surface habitat government reference concepts for Artemis missions. These efforts have unveiled possible near-term opportunities for the in-space resource utilization community if human habitation is considered a future customer of space resources. NextSTEP Habitation Development: NASA is closely working with commercial partners under its NextSTEP Appendix A model to advance habitation systems in the arena of inflatable and composite habitation structures. Such efforts promise efficiencies in volumetric packaging and overall spacecraft mass respectively. Recent testing by commercial partners have helped to quantify possible failure mechanisms for inflatable structures while advancing their technology towards eventual flight certification. The advancement of such Class II habitation structures, in which the habitat is only fully deployed once in-space or on a planetary surface, is critical to providing increased habitable volume for long-duration missions with no additional mass penalties. The progression of such technology is infused into NASA’s government reference concepts for notional deep space habitation concepts. Current Government Reference Concepts: To best inform the formulation of future collaborative solicitations, NASA employs the practice of internally developing reference concepts for future exploration elements. These concepts aid in identifying the functions and capabilities needed to complete NASA missions as well as feasible solutions within the timeframe needed. Government reference concepts for a lunar Surface Habitat, Mars Transit Habitat, and Mars Sur-face Habitat are continuously being developed and updated to better guide the Agency’s overall exploration architecture. Lunar Surface Habitat. As NASA returns to the Moon, it is evaluating possible lunar surface habitation concepts. The Surface Habitat (SH) reference concept entails a hybrid metallic-inflatable structure capable of initially housing two crew for surface stays of up to 30 days in duration. While initial missions may span ~7 days in duration, consideration is being given to expanding SH’s capability to support a crew of four for up to 60 days over its 15-year design life. Functionally, the SH serves as a ‘hub’ for all Artemis crewed surface operations, providing internal volume for maintenance, medical, logistics, science utilization, and extravehicular activity (EVA) support in addition to core habitation functionality such as environmental control and life support (ECLS) and power generation and distribution among many others. Additionally, NASA has entered a study agreement with the Italian Space Agency (Agenzia Spaziale Italiana – ASI) to investigation a possible Multi-Purpose Habitat (MPH) as an additional or augmenting habit-able element for the lunar surface. Mars Transit Habitat. NASA’s current architectural concept for initial human missions to Mars entails the utilization of a transit habitat (TH) to transport a four-person crew to and from Mars orbit, departing from and returning to a lunar near-rectilinear halo orbit (NRHO), over the course of a ~1,200-day mission. While holding a similar 15-year design lifetime, TH will also support a series of analog mission activities in NRHO to gradually test the systems and interaction with lunar surface elements, some of which may be adapted for Mars surface exploration. Holding similar functional capabilities as SH, TH is sized to support much longer durations in space and greater logistical independence. Mars Surface Habitat. NASA is still exploring the concept of operations for initial crewed missions to Mars. As such, the Mars Surface Habitat (MSH) concept is still in its infancy as options for mobile, pressurized habitation and stationary habitats are being explored. It is expected MSH will leverage heavily from the lunar SH and possible lunar pressurized rover, however the very different Martian environment will likely necessitate modifications. ISRU Opportunities: Despite the advancements under NASA’s NextSTEP habitation work and continually optimized reference concepts, NASA is facing near-term mass and power challenges that may create opportunities to the ISRU community by providing yet another possible customer for space resources. While NASA desires to use regenerative ECLS systems (ECLSS) for all habitation concepts, their operation comes with initial mass penalties and maintenance overheads when compared to simpler open-loop architectures. Because of this, NASA is currently pro-posing an open-loop, consumables-based architecture for its surface habitats to achieve initial launch and delivery lander mass targets while scarring for the in-corporation of regenerative ECLSS to meet longer mission durations and sustained presence. With such an architecture, oxygen and potable water are needed consumables, which initial ISRU systems may be able to provide in a pilot capacity. Although the TH is expecting to utilize regenerative ECLSS, advancements in lunar surface-based ISRU and possible re-supply of spacecraft in lunar or Mars orbit could significantly reduce the logistical need for ECLSS related spares on TH and possibly allow a similar open-loop and consumables-based architecture. In addition to ECLSS mass concerns, the SH is facing challenges with energy storage to support operations over periods of darkness exceeding 100 hours. Both battery and fuel cell-based power architectures are being traded, opening options for external power generation and energy storage. One possibility is ISRU-produced H2 and O2 feeding external primary fuel cell systems which could supplement habitation power generation while reducing initial mass and volume until much more powerful fission power systems might be deployed. Conclusion: Significant advancements are being made in evolvable habitation concepts that span from near-term technologies, such as inflatable structures under NextSTEP, to potentially revolutionary capabilities like the lunar surface construction as funded through the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project. As NASA investigates both heritage capabilities and rap-idly advancing, disruptive technologies, there are likely many near-term opportunities for initial ISRU capabilities to significantly aid human habitation and increase self-sufficiency beyond Earth.
Introduction: The National Aeronautics and Space Administration (NASA) is embarking on a bold journey to return humankind to the Moon and onward to Mars with innovative commercial, international, and academic partnerships [1]. Under the Artemis series of missions, NASA seeks to establish sustained human exploration of deep space through an objectives-based approach [2]. This approach drives the identification of needed system functionality and the current and future capabilities which will eventually allow humanity to sustainably live beyond Earth. Providing evolvable and scalable habitation is a cornerstone function that calls for the collection and integration of current, developmental, and future technologies that can meet near-term exploration needs while growing into long-term sustained presence. NASA is advancing in-space habitation through its Next Space Technologies for Exploration Partnerships (NextSTEP) model while designing lunar, Mars transit, and Mars surface habitat government reference concepts for Artemis missions. These efforts have unveiled possible near-term opportunities for the in-space resource utilization community if human habitation is considered a future customer of space resources. NextSTEP Habitation Development: NASA is closely working with commercial partners under its NextSTEP Appendix A model to advance habitation systems in the arena of inflatable and composite habitation structures. Such efforts promise efficiencies in volumetric packaging and overall spacecraft mass respectively. Recent testing by commercial partners have helped to quantify possible failure mechanisms for inflatable structures while advancing their technology towards eventual flight certification. The advancement of such Class II habitation structures, in which the habitat is only fully deployed once in-space or on a planetary surface [3], is critical to providing increased habitable volume for long-duration missions with no additional mass penalties. The progression of such technology is infused into NASA’s government reference concepts for notional deep space habitation concepts. Current Government Reference Concepts: To best inform the formulation of future collaborative solicitations, NASA employs the practice of internally developing reference concepts for future exploration elements. These concepts aid in identifying the functions and capabilities needed to complete NASA missions as well as feasible solutions within the timeframe needed. Government reference concepts for a lunar Surface Habitat, Mars Transit Habitat, and Mars Sur-face Habitat are continuously being developed and updated to better guide the Agency’s overall exploration architecture. Lunar Surface Habitat. As NASA returns to the Moon, it is evaluating possible lunar surface habitation concepts. The Surface Habitat (SH) reference concept entails a hybrid metallic-inflatable structure capable of initially housing two crew for surface stays of up to 30 days in duration [4]. While initial missions may span ~7 days in duration, consideration is being given to expanding SH’s capability to support a crew of four for up to 60 days over its 15-year design life [5]. Functionally, the SH serves as a ‘hub’ for all Artemis crewed surface operations, providing internal volume for maintenance, medical, logistics, science utilization, and extravehicular activity (EVA) support in addition to core habitation functionality such as environmental control and life support (ECLS) and power generation and distribution among many others. Additionally, NASA has entered a study agreement with the Italian Space Agency (Agenzia Spaziale Italiana – ASI) to investigation a possible Multi-Purpose Habitat (MPH) as an additional or augmenting habit-able element for the lunar surface [6]. Mars Transit Habitat. NASA’s current architectural concept for initial human missions to Mars entails the utilization of a transit habitat (TH) to transport a four-person crew to and from Mars orbit, departing from and returning to a lunar near-rectilinear halo orbit (NRHO), over the course of a ~1,200-day mission [5]. While holding a similar 15-year design lifetime, TH will also support a series of analog mission activities in NRHO to gradually test the systems and interaction with lunar surface elements, some of which may be adapted for Mars surface exploration. Holding similar functional capabilities as SH, TH is sized to support much longer durations in space and greater logistical independence. Mars Surface Habitat. NASA is still exploring the concept of operations for initial crewed missions to Mars. As such, the Mars Surface Habitat (MSH) concept is still in its infancy as options for mobile, pressurized habitation and stationary habitats are being explored. It is expected MSH will leverage heavily from the lunar SH and possible lunar pressurized rover, however the very different Martian environment will likely necessitate modifications. ISRU Opportunities: Despite the advancements under NASA’s NextSTEP habitation work and continually optimized reference concepts, NASA is facing near-term mass and power challenges that may create opportunities to the ISRU community by providing yet another possible customer for space resources. While NASA desires to use regenerative ECLS systems (ECLSS) for all habitation concepts, their operation comes with initial mass penalties and maintenance overheads when compared to simpler open-loop architectures. Because of this, NASA is currently pro-posing an open-loop, consumables-based architecture for its surface habitats to achieve initial launch and delivery lander mass targets while scarring for the in-corporation of regenerative ECLSS to meet longer mission durations and sustained presence. With such an architecture, oxygen and potable water are needed consumables, which initial ISRU systems may be able to provide in a pilot capacity. Although the TH is expecting to utilize regenerative ECLSS, advancements in lunar surface-based ISRU and possible re-supply of spacecraft in lunar or Mars orbit could significantly reduce the logistical need for ECLSS related spares on TH and possibly allow a similar open-loop and consumables-based architecture. Table 1 Notional ECLSS consumables per mission use for SH and TH [5]. SH (28-day) Open Loop: Water (kg) 288 | Oxygen (kg) 30 TH (1110-day) Closed-Loop: Water (kg) 182 | Oxygen (kg) 123 In addition to ECLSS mass concerns, the SH is facing challenges with energy storage to support operations over periods of darkness exceeding 100 hours. Both battery and fuel cell-based power architectures are being traded, opening options for external power generation and energy storage. One possibility is ISRU-produced H2 and O2 feeding external primary fuel cell systems which could supplement habitation power generation while reducing initial mass and volume until much more powerful fission power systems might be deployed. Conclusion: Significant advancements are being made in evolvable habitation concepts that span from near-term technologies, such as inflatable structures under NextSTEP, to potentially revolutionary capabilities like the lunar surface construction as funded through the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project [7]. As NASA investigates both heritage capabilities and rap-idly advancing, disruptive technologies, there are likely many near-term opportunities for initial ISRU capabilities to significantly aid human habitation and increase self-sufficiency beyond Earth.
The Advance Manufacturing Technology (AMT) Project supports multiple activities within the Administration's National Manufacturing Initiative. A key component of the Initiative is the Advanced Manufacturing National Program Office (AMNPO), which includes participation from all federal agencies involved in U.S. manufacturing. In support of the AMNPO the AMT Project supports building and Growing the National Network for Manufacturing Innovation through a public-private partnership designed to help the industrial community accelerate manufacturing innovation. Integration with other projects/programs and partnerships: STMD (Space Technology Mission Directorate), HEOMD, other Centers; Industry, Academia; OGA's (e.g., DOD, DOE, DOC, USDA, NASA, NSF); Office of Science and Technology Policy, NIST Advanced Manufacturing Program Office; Generate insight within NASA and cross-agency for technology development priorities and investments. Technology Infusion Plan: PC; Potential customer infusion (TDM, HEOMD, SMD, OGA, Industry); Leverage; Collaborate with other Agencies, Industry and Academia; NASA roadmap. Initiatives include: Advanced Near Net Shape Technology Integrally Stiffened Cylinder Process Development (launch vehicles, sounding rockets); Materials Genome; Low Cost Upper Stage-Class Propulsion; Additive Construction with Mobile Emplacement (ACME); National Center for Advanced Manufacturing.
Recently, NASA Kennedy Space Center, Hawaii's state aerospace agency PISCES, and two Hawaii high schools Iolani and Kealakehe have come together in a unique collaboration called MoonRIDERS. This strategic partnership will allow Hawaii students to participate directly in sending a science experiment to the surface of the moon. The MoonRIDERS project started in the spring of 2014, with each institution responsible for its own project costs and activities. PISCES, given its legislative direction in advancing planetary surface systems, saw this collaboration as an important opportunity to inspire a young generation and encourage STEM (Science, Technology, Engineering, and Mathematics) learning. Under the guidance of PISCES and NASA, the students will be involved hands-on from start to finish in the engineering, testing, and validation of a space technology called the Electrodynamic Dust Shield (EDS). Dust is a critical issue for space exploration, as evidenced by the Apollo lunar missions and Mars rovers and landers. Dust creates a number of problems for humans and hardware, including inhalation, mechanical interference, wear and tear on spacesuits, inhibition of heat transfer on radiators, and reduced efficiency of solar panels. To address this, the EDS is designed to work on a variety of materials, and functions by generatingelectrodynamic fields to clear away the dust. The Google Lunar XPRIZE (GLXP), a space competition "designed to inspire pioneers to do robotic space transport on a budget," serves as a likely method for the MoonRIDERS to get their project to the moon. The EDS would potentially be flown as a hosted payload on a competitor's lander (still to be chosen). This briefing will provide an overview of the technology, the unique partnership, progress update and testing leading to this flight opportunity.
The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.
Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.
Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.
Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent notions of the “things” being self-descriptive. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, identifying faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework that can verify compliance of products with semantic interoperability specifications. This strategic approach is designed to accelerate the timeline for adoption of semantic interoperability standards. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies as a necessary step in achieving an energy efficient smart grid future.
The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.
Produced water (PW) is a byproduct of oil and gas (O&G) production. Obtained alongside the more valuable energy products, PW is usually characterized by high levels of salinity and often contains many contaminants (chemicals, soluble and insoluble oil, organics, etc.) making it unsuitable for release without substantial treatment. Couple this with the fact that PW is typically obtained at multiple times the rate of oil or gas, and the added transport, treatment, and disposal costs become a serious challenge for operators. These realities have led to ad-hoc practices including cooperation between industry competitors to recycle, share, or otherwise mitigate PW costs. The National Energy Technology Laboratory (NETL) in partnership with the Ground Water Protection Council (GWPC) is pursuing novel technology solutions to address PW issues that complement or improve ad-hoc practices adopted by operators. In this paper, we observe that well-established market management practices used in electrical power generation have natural analogues in the PW supply chain. These parallels open up a new line of research where we view PW management as a market equilibrium problem, and explore solutions that foster active and data-based collaboration among operators through market structures similar to power markets, with the ultimate objective of improving PW management costs and recycling rates. Here, we make a case for our observations, present a PW market clearing optimization model that shows how such a market system could operate in the O&G space, and provide an illustrative case study for demonstration.
The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.
NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.
NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.
The project objectives were to develop demonstrate a high-efficiency high-output natural gas diesel micro-pilot stoichiometric engine operating with diesel pilot contribution of less than 5% on a medium duty engine. The program’s outcomes achieve in a partnership between Michigan Technological University and Westport Power Inc. were very successful. The engine platform was a 6.7L I6 engine with a compression ratio of 15:1 and achieved 24 bar BMEP and 41% brake thermal efficiency at lambda. Simulation and modeling with an improved turbocharger and combustion chamber improvements demonstrated a clear path to 43% BTE. The operational stoichiometric range was from 5 to 24 bar with minimal throttling. Diesel contribution over the cycle was 4.6%. The results achieved in this program are well above the best in-class baseline natural gas spark ignition engines of 19.5 bar BMEP and 40% BTE.
Operational flexibility is desired in today’s coal-fired power plants to balance power grids by compensating for the variable electricity supply from renewable energy sources and distributed gensets. This demanding requirement accelerates materials degradation and makes in-situ health monitoring essential. Life monitoring of components and subsystems is thus seen as essential in assessing material and mechanical behavior to estimate system reliability, move to a conditionbased maintenance strategy and determine time to failure of the units in their actual operating conditions. Vibration monitoring can be exploited for blade tip timing to measure blade vibration amplitude and tip clearance to detect any deterioration taking place in the condition of steam turbine blades. A failure of a rotating blade can lead to severe turbine damage followed by extensive repairs and loss of power production. A blade vibration monitoring system can help early detection of abnormal blade vibration behavior. In conjunction with a health monitoring system, the vibration characteristics can be analyzed to support a pro-active maintenance and inspection schedule. While the feasibility of this inspection technique has been amply demonstrated, there is a need to install induction probes to magnetize the blade for signal output. Siemens, in partnership with Raytheon Technologies Research Corporation (RTRC), proposes a holistic approach to develop embedded sensors to utilize radio frequency for not only coupling to sensors, but as the sensing modality. The goal of this project is to “embed” the novel sensing approach by using either additively manufactured or extruded waveguides on rotating blades for recording, evaluation and monitoring of blade vibrations in Low Pressure turbines, with applications extending to aero engines
This document provides a comprehensive example of the microgrid hardening framework and the Sandia developed Microgrid Hardening Design Toolkit v0.27 using a census tract in a coastal area of southern Puerto Rico as a case study. The census tract (72123953100) is located in the municipality of Salinas. Currently, the La Margarita neighborhood within this census tract is part of the Department of Energy’s Cohort 5 of the Energy Technology Innovation and Partnership Program (ETIPP). The neighborhood’s local energy cooperative, Abeyno Coop, has been operating several residential solar photovoltaic (PV) and battery energy storage system (BESS) installations (with around 30 rooftop solar systems as of 2026). As part of the ETIPP project, Abeyno Coop is planning to integrate a larger microgrid into the existing distribution feeder in the area, including solar PV and BESS to supply energy for homes and critical loads such as the medical facilities and the community center that provides emergency shelter and backup power during outages.