A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗

VOLTTRON-enabled Home Energy Management System

Home Energy Management Systems (HEMS) consist of software and hardware systems that provide communication, control, and management among different electronic devices, such as heating, ventilation, and air-conditioning (HVAC) systems. HEMS are a growing market sector in the era of smart grids and smart homes. HEMS can help both homeowners and utilities save money and energy by monitoring and controlling smart devices in a house. Based on the Department of Energy (DOE) Building Energy Data Book, 41% of the energy consumed in the United States is used by buildings (see Figure 1). This shows the importance of saving energy in the building sector. This report introduces two approaches that existing HEMS vendors can use to leverage VOLTTRON as their control and interoperability engine. The goal of this project is to make open-source, user-friendly HEMS available to the market so that everyone can benefit from them. The HEMS introduced as a result of this study should satisfy HEMS specifications such as device monitoring and control, seamless communication between devices, DR, intelligence, data management, and security.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Space Shuttle GN and C Development History and Evolution

Completion of the final Space Shuttle flight marks the end of a significant era in Human Spaceflight. Developed in the 1970 s, first launched in 1981, the Space Shuttle embodies many significant engineering achievements. One of these is the development and operation of the first extensive fly-by-wire human space transportation Guidance, Navigation and Control (GN&C) System. Development of the Space Shuttle GN&C represented first time inclusions of modern techniques for electronics, software, algorithms, systems and management in a complex system. Numerous technical design trades and lessons learned continue to drive current vehicle development. For example, the Space Shuttle GN&C system incorporated redundant systems, complex algorithms and flight software rigorously verified through integrated vehicle simulations and avionics integration testing techniques. Over the past thirty years, the Shuttle GN&C continued to go through a series of upgrades to improve safety, performance and to enable the complex flight operations required for assembly of the international space station. Upgrades to the GN&C ranged from the addition of nose wheel steering to modifications that extend capabilities to control of the large flexible configurations while being docked to the Space Station. This paper provides a history of the development and evolution of the Space Shuttle GN&C system. Emphasis is placed on key architecture decisions, design trades and the lessons learned for future complex space transportation system developments. Finally, some of the interesting flight operations experience is provided to inform future developers of flight experiences.

Zimpfer, Douglas↗

Time managed virtualization for simulating systems of systems

Software is an integral part of almost every non-trivial system. Yet simulation technologies to understand how software affects system performance lag behind what is available to understand physical behavior. This is not surprising. An abstract model of software tells us what it is supposed to do, not what it actually does. In this respect software is very different from a physical system. Kirchhoff’s laws predict the behavior of an electrical circuit with great precision. The mathematics of fluids do an adequate job of anticipating how a wing will perform in flight. Only the software itself, observed in operation, can tell us how it behaves.

97 MATHEMATICS AND COMPUTING↗

AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

Hanley, Lionel↗

Package Testing Program Process for Validation and Verification of Software

The purpose of this document is to define the process for validation and verification (V&V) of software used to test the thermal data acquisition equipment in the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) as part of the testing configuration(s). This process adheres to all applicable ORNL Standards Based Management System requirements and correlates with the PTP Quality Management System and the Software Quality Assurance Plan.

97 MATHEMATICS AND COMPUTING↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

An Integrated Approach To Payload System Simulation

This paper describes a payload system simulation implemented at JPL as part of a comprehensive mission simulation facility. The flight software function includes communication with other process modules, instrument control, and data management. The payload system simulation software consists of: a camera subsystem, a virtual world, and a mission visualization toolset.

dynamics model photometric model geological model ↗

Performance of an RPM based on Gd-lined plastic scintillator for neutron and gamma detection [ANIMMA--2015-IO-372]

A Radiation Portal Monitor (RPM) was developed by the Istituto Nazionale di Fisica Nucleare (INFN) and Ansaldo Nucleare (ANN) within the FP7 SCINTILLA European project. The system was designed to detect both gamma and neutron radiation with a single technology. It is conceived to monitor vehicle and cargo containers in transits across borders or ports, to find radioactive elements and to avoid illegal trafficking of strategic nuclear materials. The system is based on a {sup 3}He-free neutron detection technology using plastic scintillators coupled to Gadolinium to detect and discriminate gamma from neutron signals. During the 3 years of the SCINTILLA project the construction and test of the first two prototypes drove the definition of the final layout of a full RPM system consisting of two twin pillars as a portal for vehicle and cargo container scan. A custom System Control Software (SCS) manages the electronics of the RPM, the ancillary devices and the data analysis. The combination of the detector layout and of the software functionalities enables both to distinguish neutrons and gammas and to identify the energy range of a detected gamma source. The system was initially characterized via static tests with gamma and neutron sources in the INFN laboratory. These measurements were used to calibrate the detector, evaluate the response of the single pillars as well as of the full system, and optimize the RPM configuration and discrimination algorithm. During this phase, specific tests were performed to study the stability over time of the system, monitoring the measured the neutron and gamma count rates over periods of several weeks. The results allow us to demonstrate the reliability and robustness of the RPM. In a second time the RPM performance was studied via dynamic tests performed during the SCINTILLA test and benchmark campaigns. These measurements took place in the JRC ITRAP+10 facility at Ispra (Varese-Italy). The laboratory is equipped with an experimental set-up for dynamic tests of multiple systems according to international standards. The performed measurements utilized radioactive sources with activities selected according to ANSI and IEC standards to test the detector alarm performances in terms of gamma and neutron response, sensitivity to high gamma fields, sensitivity to moderated neutron sources as well as false alarm rates (FAR). In addition, the RPM was tested in challenging configurations exceeding the requirements set by international standards to determine the real limits of the system. The results obtained during these campaigns demonstrated that the system detection efficiency is not only compliant to international standards for its category, but often exceeds them, demonstrating the validity of the chosen technology and of the implemented layout. The positive performance also showed the effectiveness of the SCS and of its functionalities. To further demonstrate the system capabilities, a test in a real-life environment of the RPM is planned to happen in a near future by installing the detectors in a seaport. In this presentation I will give an overview of the RPM characteristics, of its performances as determined in the test campaign mentioned above and of future plans, to demonstrate how this technology can be an effective choice for the realization of {sup 3}He-free RPM detectors. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Central Data Processing System (CDPS) user's manual: Solar heating and cooling program

The software and data base management system required to assess the performance of solar heating and cooling systems installed at multiple sites is presented. The instrumentation data associated with these systems is collected, processed, and presented in a form which supported continuity of performance evaluation across all applications. The CDPS consisted of three major elements: communication interface computer, central data processing computer, and performance evaluation data base. Users of the performance data base were identified, and procedures for operation, and guidelines for software maintenance were outlined. The manual also defined the output capabilities of the CDPS in support of external users of the system.

Source record↗

Evaluation of Job Queuing/Scheduling Software: Phase I Report

The recent proliferation of high performance work stations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, the national Aerodynamic Simulation (NAS) supercomputer facility compiled a requirements checklist for job queuing/scheduling software. Next, NAS began an evaluation of the leading job management system (JMS) software packages against the checklist. This report describes the three-phase evaluation process, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still insufficient, even in the leading JMS's. However, by ranking each JMS evaluated against the requirements, we provide data that will be useful to other sites in selecting a JMS.

Jones, James Patton↗

XCPU2 process management system

Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

97 MATHEMATICS AND COMPUTING↗

Architectures and Evaluation for Adjustable Control Autonomy for Space-Based Life Support Systems

In the past five years, a number of automation applications for control of crew life support systems have been developed and evaluated in the Adjustable Autonomy Testbed at NASA's Johnson Space Center. This paper surveys progress on an adjustable autonomous control architecture for situations where software and human operators work together to manage anomalies and other system problems. When problems occur, the level of control autonomy can be adjusted, so that operators and software agents can work together on diagnosis and recovery. In 1997 adjustable autonomy software was developed to manage gas transfer and storage in a closed life support test. Four crewmembers lived and worked in a chamber for 91 days, with both air and water recycling. CO2 was converted to O2 by gas processing systems and wheat crops. With the automation software, significantly fewer hours were spent monitoring operations. System-level validation testing of the software by interactive hybrid simulation revealed problems both in software requirements and implementation. Since that time, we have been developing multi-agent approaches for automation software and human operators, to cooperatively control systems and manage problems. Each new capability has been tested and demonstrated in realistic dynamic anomaly scenarios, using the hybrid simulation tool.

Malin, Jane T.↗

Content Documents Management

The Content Documents are created and managed under the System Software group with. Launch Control System (LCS) project. The System Software product group is lead by NASA Engineering Control and Data Systems branch (NE~C3) at Kennedy Space Center. The team is working on creating Operating System Images (OSI) for different platforms (i.e. AIX, Linux, Solaris and Windows). Before the OSI can be created, the team must create a Content Document which provides the information of a workstation or server, with the list of all the software that is to be installed on it and also the set where the hardware belongs. This can be for example in the LDS, the ADS or the FR-l. The objective of this project is to create a User Interface Web application that can manage the information of the Content Documents, with all the correct validations and filters for administrator purposes. For this project we used one of the most excellent tools in agile development applications called Ruby on Rails. This tool helps pragmatic programmers develop Web applications with Rails framework and Ruby programming language. It is very amazing to see how a student can learn about OOP features with the Ruby language, manage the user interface with HTML and CSS, create associations and queries with gems, manage databases and run a server with MYSQL, run shell commands with command prompt and create Web frameworks with Rails. All of this in a real world project and in just fifteen weeks!

Muniz, R.↗

Space Shuttle development update

The development efforts, since the STS-4 flight, in the Space Shuttle (SS) program are presented. The SS improvements introduced in the last two years include lower-weight loads, communication through the Tracking and Data Relay Satellite, expanded extravehicular activity capability, a maneuvering backpack and the manipulator foot restraint, the improvements in thermal projection system, the 'optional terminal area management targeting' guidance software, a rendezvous system with radar and star tracker sensors, and improved on-orbit living conditions. The flight demonstrations include advanced launch techniques (e.g., night launch and direct insertion to orbit); the on-orbit demonstrations; and added entry and launching capabilities. The entry aerodynamic analysis and entry flight control fine tuning are described. Reusability, improved ascent performance, intact abort and landing flexibility, rollout control, and 'smart speedbrakes' are among the many improvements planned for the future.

Brand, V.↗

EMOS (Energy Management Optimization System) [SWR-21-46]

EMOS software performs a real-time hierarchal optimal control for energy systems like multi-port electric vehicles charging site with distributed energy resources (DERs) and energy storage systems (ESSs). It gathers information in real-time from electric vehicles, power grid, and DERs, solves a multi-objective energy management optimization problem, and output setpoint for chargers, ESS converters, DERs converters, and grid converters. The software incorporates a novel integration of two control tasks: a) An Energy Management Optimization (EMO), which is the brain of EMOS controller that gathers information in real-time from EVs [e.g., battery size, state-of-charge (SOC), desired SOC, and charge acceptance curve], grid (e.g., electricity price, allowed feeder capacity, ramp rate limit, and reactive power), and DERs (e.g., prediction for solar generation for PV systems). It solves a control optimization problem in real-time to find optimal setpoint for ESSs power dispatch, EVs charging rate, and grid inverters. The objectives are to (1) minimize the charging cost considering grid energy, demand charges, and battery energy, (2) minimize charging time to meet fast charging criterion, (3) keep high energy level on ESSs at the end of an operating period, while satisfying constraints related to grid, EVs, and power converters. b) Real-Time Energy Management System (RT-EMS) is a rule-based algorithm that has faster response than EMO. It receives optimal setpoint from EMO and actual measurements from the system and modify the setpoint to compensate for any fast disturbance in the system, until a new optimum solution is received. Fast disturbances may include vehicle connect/disconnect, unpredicted variation in DERs profiles, variation in grid voltage, errors in PV generation prediction, and others. In addition, RT-EMS regulates voltage at point of common coupling (PCC) by managing reactive power of grid converters.

Mohamed, Ahmed↗