International Applications for Floating Solar PV (FPV) [Slides]

Floating solar is a comparatively new concept. Floating solar is about to form a third pillar in the market for solar energy next to ground mounted and rooftop solar. The Asia-Pacific region already dominates the fast-emerging market in floating solar PV (FPV), and it looks set to build on that position as more nations get on board and costs fall. Asia-Pacific is set to increase its market share from 74% in 2020 to 87% in 2026 in terms of global installed FPV capacity. However, since floating solar systems are still a new application, there is a lack of information on its performance, cost, technical complexity, and operations and maintenance (O&M). This seminar series seeks to partially remedy that through presenting case studies that highlight the benefits, challenges, and applications of FPV in South and Southeast Asia.

14 SOLAR ENERGY↗

CCD camera systems and support electronics for a White Light Coronagraph and X-ray XUV solar telescope

Two instruments, a White Light Coronagraph and an X-ray XUV telescope built into the same housing, share several electronic functions. Each instrument uses a CCD as an imaging detector, but due to different spectral requirements, each uses a different type. Hardware reduction, required by the stringent weight and volume allocations of the interplanetary mission, is made possible by the use of a microprocessor. Most instrument functions are software controlled with the end use circuits treated as peripherals to the microprocessor. The instruments are being developed for the International Solar Polar Mission.

Harrison, D. C.↗

Parker Solar Probe Observations of High Plasma β Solar Wind From the Streamer Belt

In general, slow solar wind from the streamer belt forms a high plasma β equatorial plasma sheet around the heliospheric current sheet (HCS) crossing, namely, the heliospheric plasma sheet (HPS). Current Parker Solar Probe (PSP) observations show that the HCS crossings near the Sun could be full or partial current sheet (PCS) crossings, and they share some common features but also have different properties. In this work, using the PSP observations from encounters 4–10, we identify streamer belt solar wind from enhancements in plasma β, and we further use electron pitch angle distributions to separate it into HPS solar wind around the full HCS crossings and PCS solar wind in the vicinity of PCS crossings. Based on our analysis, we find that the PCS solar wind has different characteristics as compared with HPS solar wind: (a) the PCS solar wind could be non-pressure-balanced structures rather than magnetic holes, and the total pressure enhancement mainly results from the less reduced magnetic pressure; (b) some of the PCS solar wind is mirror-unstable; and (c) the PCS solar wind is dominated by very low helium abundance but varied alpha–proton differential speed. We suggest that the PCS solar wind could originate from coronal loops deep inside the streamer belt, and it is pristine solar wind that still actively interacts with ambient solar wind; thus, it is valuable for further investigations of the heating and acceleration of slow solar wind.

Slow solar wind↗

Impacts of Climate Change on the Generation Potential of Solar and Wind Energy Systems in India

Low-carbon energy sources like wind and solar are essential for decarbonizing the electricity sector. In addition, the cost of electricity generated from these sources has plummeted over the last decade. Therefore, these energy sources are poised to take a significant share of the total installed capacity soon. However, they are susceptible to the impacts of climate change as their generation potential depends on the weather conditions. Estimating the installed capacity requirements of solar and wind energy to decarbonize the power sector without accounting for these possible changes in generation potential could lead to missing out on the set climate goals and meeting future electricity demand. This study evaluates the effect of climate change on the generation potential of wind and solar energy systems in India for two future periods, 2050 and 2070, under two climate scenarios or Shared Socioeconomic Pathway (SSP): SSP245 and SSP585. Almost all regions show a decrease, and most regions show a significant decline (>5%) in the generation potential of solar Photovoltaic (PV) as compared to 2010 levels under both climate scenarios and future periods. The changes in the generation potential of wind energy are more significant (>10%), and the majority of regions show a decline in generation potential. Southwestern and central regions show an increase in wind generation potential for 2070 as compared to 2050 levels under the SSP245 scenario and the SSP585 scenario, respectively.

climate change↗

Dome craters on Ganymede

Voyager observations reveal impact craters on Ganymede that are characterized by the presence of broad, high albedo, topographic domes situated within a central pit. Fifty-seven craters with central domes were identified in images covering approx. 50% of the surface. Owing to limitations in resolution, and viewing and illumination angles, the features identified are most likely a subset of dome craters. The sample appears to be sufficiently large to infer statistically meaningful trends. Dome craters appear to fall into two distinct populations on plots of the ratio of dome diameter to crater rim diameter, large-dome craters and small-dome craters. The two classes are morphologically distinct from one another. In general, large dome craters show little relief and their constituent landforms appear subdued with respect to fresh craters. The physical attributes of small-dome craters are more sharply defined, a characteristic they share with young impact craters of comparable size observed elsewhere in the solar system. Both types of dome craters exhibit central pits in which the dome is located. As it is difficult to produce domes by impact and/or erosional processes, an endogenic origin for the domes is reasonably inferred. Several hypotheses for their origin are proposed. These hypotheses are briefly reviewed.

Moore, J. M.↗

Infrared Spectroscopy of the Dust in Comets and Relationships to Interstellar Dust

Infrared spectroscopy of the dust in comets reveals a complex mix of silicate materials, including both crystalline and non-crystalline components of both olivine (forsterite) and pyroxene composition. These various components do not necessarily share a common origin. Since comets formed in cold regions of the solar nebula, pre-solar grains in the nebula could have been accreted into comets with little alteration. Some of the cometary silicates may be of circumstellar (formed in circumstellar outflows of evolved stars) or interstellar (formed in dense region of the interstellar medium) origin. Spectral similarities to both circumstellar and interstellar silicates are seen in comet spectra. the short-period Kuiper Belt comets) show weak or no spectral features. The lack of features is generally explained as a particle size effect: the small silicate grains are embedded in larger, optically thick particles. However, compositional differences cannot be ruled out. For example, no unambiguous signature of forsterite has yet been seen in the spectrum of a short-period comet. Thus, the Stardust sample from short-period comet P/Wild 2 will be extremely valuable. Not only grain by grain composition and isotopic ratios but also grain morphology, irradiation history, and evidence of organic refractory mantles are important for understanding their origin. The relative abundance and distinguishing characteristics of the various crystalline and non-crystalline silicate components needs to be established. While some comets, such as Hale-Bopp, display a rich infrared spectrum, others (particularly

Hanner, Martha S.↗

The Asteroid Frontier

There are many ways of studying the Asteroid Frontier as a scientist. In my career, I have used large telescopes atop a 14,000 ft mountain top observatory in Hawaii, used the Hubble Space Telescope in orbit around the Earth, traveled to Antarctica to collect meteorites sitting on the ice waiting for them to be recovered by scientists for scientific investigation, walked the desert with 50 students from University of Khartoum searching for fragments of an asteroid that collided with earth, exploded in the upper atmosphere and rained fragments on the desert floor. Most recently, I have looked at one of the largest Main Belt Asteroids named (4) Vesta through the eyes of a robotic spacecraft named Dawn, exploring the asteroid frontier. I will share my adventures, place the thrill of scientific exploration through NASA's solar system exploration program in context and provide opportunities for students to engage in NASA's exciting missions to expand scientific understanding of Earth and the Universe in which we live

Mcfadden, Lucyann A.↗

Aspiring is Not Enough

this article is an invitation to imagine that a different Puerto Rico is possible. However, I don’t believe that we have to wait until 2052 to discuss Puerto Rico’s future. We Puerto Ricans can start talking, planning, and building it now! My experience, being raised in the mountains of the big island of Puerto Rico, is that many versions of Puerto Rico exist at the same time—that there are many hearts, many visions, many struggles, and many longings. So, what should the Puerto Rico that we want to live in look like? What do we want to share with future generations?

14 SOLAR ENERGY↗

Development of a Practical Secondary Control for Hardware Microgrids

Practical, vendor-agnostic interoperability guidelines for the secondary control architecture of microgrids (MGs) with multiple grid-forming (GFM) inverter-based resources (IBRs) have not yet been developed. Therefore, this paper proposes a generic and vendor-agnostic secondary control architecture that operates with all GFM IBRs and synchronous generators. This secondary control does not require the use of additional measurement devices in the MG and utilizes the inherent communication systems of the GFM units, such as Modbus TCP/IP. The practical challenges of Modbus registers, such as packet loss and quantization error, and their detrimental impacts on secondary control actions are investigated. The proposed three-stage modification for any secondary control architecture to mitigate these impacts includes: 1) averaging the data read, 2) situational event-triggering of the controller, and 3) finite iteration of the controlling action. The proposed method is validated using a three-phase electric power, 480 V, 60 Hz, 500 kVA laboratory hardware microgrid with commercial two GFM IBRs and one diesel generator. The experimental results corroborates the fact the proposed modification in the secondary control architecture is advantageous for practical usage under erroneous measurements.

grid-forming inverter↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

Optoelectronic property comparison for isostructural Cu 2 BaGeSe 4 and Cu 2 BaSnS 4 solar absorbers

To target mitigation of anti-site defect formation in Cu 2 ZnSnS 4–x Se x , a new class of chalcogenides, for which Ba or Sr (group 2) replace Zn (group 12), has recently been introduced for prospective solar absorber application. Cu 2 BaGeSe 4 (CBGSe) and Cu 2 BaSnS 4 (CBTS) are two such compounds, which share a common trigonal crystal structure (P3 1 space group) and similar quasi-direct band gap (~2 eV). While CBTS-based films have already been studied, there are no reports yet on films and solar cells based on related CBGSe. To identify key differences and similarities in the electronic properties between these two materials, electronic characteristics (e.g., carrier concentration, mobility, electron affinity, defect levels, recombination, and charge carrier kinetics) of vacuum-deposited CBGSe and CBTS films are compared using a variety of characterization methods. Hall effect measurements reveal that CBGSe films have relatively higher hole carrier concentration and lower mobility (3 × 10 15 cm –3 , 0.6 cm 2 V –1 s –1 ) compared to CBTS (5 × 10 12 cm –3 , 3.5 cm 2 V –1 s –1 ). Photoelectron spectroscopy yields low electron affinity values for both CBGSe (3.7 eV) and CBTS (3.3 eV), pointing to the necessity of pursuing low electron affinity buffer materials for both types of absorbers. At low temperatures, CBGSe films show free-exciton photoluminescence, as well as pronounced deep-level emission at ~1.4 eV, while CBTS films exhibit a strong bound-exciton signal with noticeably less intense deep-level emission than for CBGSe. Charge carrier kinetics, transport, and recombination properties of both types of films are also analyzed using optical-pump terahertz-probe spectroscopy and time-resolved microwave conductivity. The first CBGSe prototype solar cells (using chemical bath deposited CdS as a buffer layer) show a maximum of 1.5% efficiency with ~0.62 V open-circuit voltage. Furthermore, the measured properties point to possible limiting factors for CBGSe and related films for PV and optoelectronics and provide insights on possible approaches for improvement within this multinary chalcogenide family.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

2009 International Year of Astronomy (IYA2009)

400 years ago, Galileo first turned a telescope to the sky, and to honor that historic moment, 2009 has been designated the International Year of Astronomy (IYA2009). This session will feature two scientists who have used the telescope to understand our solar system and well beyond to yield fantastic new discoveries. Jennifer Wiseman will share the work she does with NASA, presenting beautiful and tantalizing images from the Hubble Space Telescope and discussing how space astronomy can inspire all ages.

Wiseman, Jennifer↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation into Sizing Photovoltaic with Energy Storage for Off-Grid Transactive Scenarios

In this study, a novel sizing methodology was developed for centralized and interconnected operating strategies of transactive microgrids and several variables were investigated including starting month, initial charge of battery, load variability, unit cost of solar panels and energy storage, number of systems, climate, and required reliability to determine their effect on total cost. The centralized strategy improved cost by seven to ten percent compared to the isolated strategy in every case. The interconnected strategy saved an incremental amount of money consistently compared to the isolated standard. The number of connected systems was not a strong effect. It was thought that increasing the number of systems would increase the benefit of energy sharing. Climate zones studied (“Cold”; “Hot-Dry/Mixed Dry”; “Mixed Humid”; and “Cold but with lower solar irradiation”) showed a large variation on cost with the Hot-Dry/Mixed Dry being the least expensive and Cold, with lower solar irradiation being the most expensive. Cost sensitivity analysis was performed showing that the unit cost of solar has a greater effect on the total cost. Required reliability of power, measured in outage hours, exhibited an inverse relation with cost.

14 SOLAR ENERGY↗

STS-43 Space Shuttle mission report

The STS-43 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-second flight of the Space Shuttle Program and the ninth flight of the Orbiter Vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-47 (LWT-40); three Space Shuttle main engines (SSME's) (serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-045. The primary objective of the STS-43 mission was to successfully deploy the Tracking and Data Relay Satellite-E/Inertial Upper Stage (TDRS-E/IUS) satellite and to perform all operations necessary to support the requirements of the Shuttle Solar Backscatter Ultraviolet (SSBUV) payload and the Space Station Heat Pipe Advanced Radiator Element (SHARE-2).

Fricke, Robert W.↗

Co-Benefits of Mitigating Aerosol Pollution to Future Solar and Wind Energy in China Toward Carbon Neutrality

The climate commitment to achieving carbon neutrality before 2060 in China has been announced recently. In the context of pursuing carbon neutrality, sharing similar sources as greenhouse gases, aerosol particle and precursor emissions are projected to substantially decrease in China, which can potentially have a great impact on climate. Here, we investigate the effects of future aerosol reductions, because of achieving carbon neutrality, on solar and wind energy in China by using an earth system model. We show that significant reductions in aerosol emissions, particularly in eastern China, lead to increases in the surface downwelling shortwave radiation, surface air temperature and wind speed, which can further enhance the potential of solar and wind energy production. The findings underline that the pursuit of carbon neutrality can yield co-benefits of not only mitigating climate change and air pollution but also fortifying the stability of renewable energy sources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗