Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

Bull, John S.↗

Design and implementation of two two-week Teacher Enhancement Institutes

During this summer, I have been part of a four team effort that planned and executed two two-week Teacher Enhancement Institutes (TEI) for 40 K-8 teachers from this area. The TEI was designed to enhance teachers' background in aeronautics and technology so that they would be better equipped to encourage and to train students in the mathematics, science, and technology fields. The teachers were given a stipend and three graduate credits from Christopher Newport University for their participation in this program. The four ASEE fellows worked together to develop objectives and a schedule of activities for each two-week session based on the program outline given in the grants that were funding this effort. We divided the responsibilities in coordinating and implementing each part of the TEI based on the specific strengths and background of each ASEE fellow. My specific responsibilities were: (1) to develop the course syllabus and generally handle all matters involved with the graduate course; (2) coordinate the follow-up sessions; and (3) design and manage half of the technology sessions that we had scheduled (approximately 30% of the TEI was devoted to technology). Because the first two responsibilities were primarily administrative in nature, I will address only the last. The technology sessions were divided into computer-only and other technologies (e.g., television and digital technology including scanning, digital photography and CD-ROM). I had responsibility for the computer-only technology sessions. The emphasis of these sessions was on use of the Internet specifically to locate and use educational resources. To maximize learning, these sessions were hands-on with two teachers at each computer. Each teacher received instruction in, and actually used, the most popular tools available on the Internet: email (they were given temporary accounts at NASA LaRC), anonymous ftp and archie, gopher and veronica, mosaic, and telnet. Teachers participated in hands-on workshops to learn about these programs, but were also given time during the two-week session to explore on their own and to find resources on the Net that specifically met their needs. In order to ensure that Internet access continues after their return to the classroom, aIl teachers who did not have them also applied for Learning Link accounts (from WHRO, the local public television station) and Virginia Pen accounts (from the Department of Education of Virginia), both of which allow textbased access to Internet. In addition to getting exposure to and practice with Internet tools, teachers were aIso given a hands-on seminar (and also given practice time) on ClarisWorks, an integrated word processing, spreadsheet, database, and paint package. The technology sessions (and TEI as a whole) were enthusiastically received by both new and more experienced teachers as extremely helpful in improving their ability to use technology in developing lesson pIans.

Lambert, Lynn↗

Kensor: Coordinated Intelligence from Co-Located Sensors

Internet of Things (IoT) is becoming more pervasive in many installations, including homes, manufacturing plants, and industrial facilities of all kinds. The data that IoT produces is a reflection of usual behavior such as daily routines and scheduled tasks, but also from unexpected behavior due to unintentional or undesirable abnormalities. Here, we focus on achieving coordinated intelligence about normal and abnormal phenomena from multiple sensors that are geographically colocated in close proximity, monitoring and controlling a set of co-located devices. Given a set of co-located sensors, we seek an intelligent approach that would automatically determine the “normal” patterns of behaviors among the correlated sensors. After normal behavior is extracted, later monitoring should detect any deviant variations over time. An example application is an entry monitoring and alert system for facilities such as nuclear reactors, where badge readers, door locks, lights, weight trackers and other co-located sensors at the entry point are collectively tracked. To address this problem, we identify the possible solution approach that can be used to solve its different variants. The implemented model is developed as a combination of rules and Markov Chain methods.

Kotevska, Olivera↗

Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

integrated arrival/departure/surface operations↗

Earth orientation from lunar laser range-differencing

For the optimal use of high precision lunar laser ranging (LLR), an investigation regarding a clear definition of the underlying coordinate systems, identification of estimable quantities, favorable station geometry and optimal observation schedule is given.

Leick, A.↗

EPOXI and Stardust NExT: The Management Challenges of Two Comet Flybys in Three Months

The EPOXI and Stardust NExT missions were missions of opportunity utilizing the Deep Impact and Stardust spacecraft, respectively. These new missions took advantage of the cost savings of utilizing spacecraft that were already flying for new science investigations. Both were retargeted to fly by an additional comet. EPOXI visited Hartley 2, significantly smaller than the other Jupiter family comets visited previously. Stardust NExT flew by Tempel 1, providing a second look at the comet previously studied by Deep Impact in 2005. Both projects were part of NASA's Discovery Program. In order to further save costs, the projects were combined into a single project office at JPL. This provided some efficiencies due to the similarity of the missions, but having the flybys space only three months apart posed challenges for the project management team to ensure each project was ready for its critical event and ensuring each received the proper support from the management team. The project office relied on an integrated calendar for tracking and scheduling meetings, reviews, and other key events. The project management team also coordinated their availability for both projects to maintain involvement with each team to ensure effective risk identification and management.

NExT (New Exploration of Tempel 1)↗

Tools for Coordinated Planning Between Observatories

With the realization of NASA's era of great observatories, there are now more than three space-based telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to observations using only one single observatory. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. At present, multi-observatory programs are conducted by submitting observing proposals separately to each concerned observatory. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. Due to the lack of automated tools for coordinated observations, this process is time consuming, error-prone, and the outcome of the requests is not certain until the very end. To increase observatory operations efficiency, such manpower intensive processes need to undergo re-engineering. To overcome this critical deficiency, Goddard Space Flight Center's Advanced Architectures and Automation Branch is developing a prototype effort called the Visual Observation Layout Tool (VOLT). The main objective of the VOLT project is to provide visual tools to help automate the planning of coordinated observations by multiple astronomical observatories, as well as to increase the scheduling probability of all observations.

Jones, Jeremy↗

Coordinated observations of X-ray bright BL Lacertae objects

No new International Ultraviolet Explorer (IUE) observations were scheduled. The work on the spectral extraction routine was continued. The computer code was adapted from the RDAF PDP 11/44 computer to a VAX 11/750, in order that it run more quickly. A chapter on ultraviolet observations of blazars for a book celebrating the scientific accomplishment of IUE was written in colloboration. A copy of the final draft is attached.

Urry, C. M.↗

Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

Swenson, Harry N.↗

Effects of restricted feeding schedules on circadian organization in squirrel monkeys

Free running circadian rhythms of motor activity, food-motivated lever-pressing, and either drinking (N = 7) or body temperature (N = 3) were recorded from 10 squirrel monkeys maintained in constant illumination with unlimited access to food. Food availability was then restricted to a single unsignaled 3-hour interval each day. The feeding schedule failed to entrain the activity rhythms of 8 monkeys, which continued to free-run. Drinking was almost completely synchronized by the schedule, while body temperature showed a feeding-induced rise superimposed on a free-running rhythm. Nonreinforced lever-pressing showed both a free-running component and a 24-hour component that anticipated the time of feeding. At the termination of the schedule, all recorded variables showed free-running rhythms, but in 3 animals the initial phase of the postschedule rhythms was advanced by several hours, suggesting relative coordination. Of the remaining 2 animals, one exhibited stable entrainment of all 3 recorded rhythms, while the other appeared to entrain temporarily to the feeding schedule. These results indicate that restricted feeding schedules are only a weak zeitgeber for the circadian pacemaker generating free-running rhythms in the squirrel monkey. Such schedules, however, may entrain a separate circadian system responsible for the timing of food-anticipatory changes in behavior and physiology.

Non-NASA Center↗

A Method for Integrating Thrust-Vectoring and Actuated Forebody Strakes with Conventional Aerodynamic Controls on a High-Performance Fighter Airplane

A method, called pseudo controls, of integrating several airplane controls to achieve cooperative operation is presented. The method eliminates conflicting control motions, minimizes the number of feedback control gains, and reduces the complication of feedback gain schedules. The method is applied to the lateral/directional controls of a modified high-performance airplane. The airplane has a conventional set of aerodynamic controls, an experimental set of thrust-vectoring controls, and an experimental set of actuated forebody strakes. The experimental controls give the airplane additional control power for enhanced stability and maneuvering capabilities while flying over an expanded envelope, especially at high angles of attack. The flight controls are scheduled to generate independent body-axis control moments. These control moments are coordinated to produce stability-axis angular accelerations. Inertial coupling moments are compensated. Thrust-vectoring controls are engaged according to their effectiveness relative to that of the aerodynamic controls. Vane-relief logic removes steady and slowly varying commands from the thrust-vectoring controls to alleviate heating of the thrust turning devices. The actuated forebody strakes are engaged at high angles of attack. This report presents the forward-loop elements of a flight control system that positions the flight controls according to the desired stability-axis accelerations. This report does not include the generation of the required angular acceleration commands by means of pilot controls or the feedback of sensed airplane motions.

Lallman, Frederick J.↗

Reasoning abstractly about resources

r describes a way to schedule high level activities before distributing them across multiple rovers in order to coordinate the resultant use of shared resources regardless of how each rover decides how to perform its activities. We present an algorithm for summarizing the metric resource requirements of an abstract activity based n the resource usages of its potential refinements.

abstraction planning rovers multiple agents↗

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Adapting Project Management Practices to Research-Based Projects

From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

Bahr, P.↗

Future foundries: A convergent manufacturing platform

This article introduces the Future Foundries platform developed at Oak Ridge National Laboratory, a first-generation research system designed to demonstrate convergent manufacturing. Convergent manufacturing brings together additive, subtractive, and transformative processes in a digitally interconnected environment to enable end-to-end production workflows. By linking traditionally discrete steps, convergent platforms accelerate production, improve repeatability, and support high-mix, low-volume manufacturing. The Future Foundries platform exemplifies this vision in practice by combining four modular, vendor-agnostic process cells that include robotic WAAM, induction heating, optical metrology, and machining, coordinated through an automated pallet handler and a ROS 2-based digital thread. This architecture provides the flexibility and scalability needed for agile production in small and medium-sized manufacturing enterprises and for field deployable manufacturing. Two case studies illustrate the platform’s capabilities. The first presents an integrated workflow for fabricating, transforming, and repairing critical replacement components, showing how consolidated thermal, additive, inspection, and machining operations reduce manual part handling and streamline process flow. The second case study highlights coordinated multi-part production enabled by automated pallet logistics and multi-cell scheduling. Together, these examples showcase convergent manufacturing as a practical and scalable strategy for strengthening domestic casting and forging capacity, improving supply-chain resilience, and enabling rapid, adaptable production of mission-critical components.

Convergent manufacturing↗

Urban-Scale Control of School Bus Fleet Charging and Discharging Strategies Using Single and Multi-Stage Optimization

This paper presents a dual-strategy approach to optimizing charging and discharging schedules for school bus fleets, using the limited charging infrastructure effectively. We aim to ensure that each bus is fully charged for daily operations and aids in grid stability during peak demand. The first strategy utilizes linear programming to schedule overnight charging at available station sockets and strategic discharging during peak periods, efficiently coordinating limited resources. The second strategy employs metaheuristic techniques for continuous optimization, focusing on precise power requirements and offering greater flexibility than the linear model.

Selim, Alaa↗

HDU Pressurized Excursion Module (PEM) Prototype Systems Integration

The Habitat Demonstration Unit (HDU) project team constructed an analog prototype lunar surface laboratory called the Pressurized Excursion Module (PEM). The prototype unit subsystems were integrated in a short amount of time, utilizing a skunk-works approach that brought together over 20 habitation-related technologies from a variety of NASA centers. This paper describes the system integration strategies and lessons learned, that allowed the PEM to be brought from paper design to working field prototype using a multi-center team. The system integration process included establishment of design standards, negotiation of interfaces between subsystems, and scheduling fit checks and installation activities. A major tool used in integration was a coordinated effort to accurately model all the subsystems using CAD, so that conflicts were identified before physical components came together. Some of the major conclusions showed that up-front modularity that emerged as an artifact of construction, such as the eight 45 degree "pie slices" making up the module whose steel rib edges defined structural mounting and loading points, dictated much of the configurational interfaces between the major subsystems and workstations. Therefore, 'one of the lessons learned included the need to use modularity as a tool for organization in advance, and to work harder to prevent non-critical aspects of the platform from dictating the modularity that may eventually inform the fight system.

Gill, Tracy R.↗

MSL relay coordination and tactical planning in the era of InSight, MAVEN, and TGO

This study examines an approach for optimizing the scheduling of regular relay communications between the Mars Science Laboratory (MSL) rover and the non-sun-synchronous Mars orbiters MAVEN and TGO as well as the impacts of the approaching InSight landing on MSL relay and tactical planning. Rover operations require knowledge of recently executed activities, termed decisional data, in order to inform tactical activity planning. As a result, timely and routine data return is critical for nominal rover operations. Mars orbiters are used as relay assets to achieve such timeliness.

Thomas, Steven↗