Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Evaluating Space Network (SN) scheduling operations concepts through statistical analysis

The Network Control Center (NCC) currently uses the NCC Data System (NCCDS) to schedule customer spacecraft communication requests for the Space Network (SN). The NCC/Request Oriented Scheduling Engine (NCC/ROSE), which implements an operational concept called flexible scheduling, is being tested as a potential replacement for the NCCDS scheduler in an effort to increase the efficiency of the NCC scheduling operations. This paper describes the high fidelity benchmark tests being conducted on NCC/ROSE, the evaluation techniques used to compare schedules, and the results of the tests. This testing will verify the increases in efficiency and productivity that can help the NCC meet the anticipated scheduling loads well into the next century.

Kwadrat, Carl↗

Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.

Short, Nick, Jr.↗

Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

Liebowitz, Jay↗

NASA scheduling technologies

This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

Adair, Jerry R.↗

Planning as a Precursor to Scheduling for Space Station Payload Operations

Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

Howell, Eric↗

A System for Automatically Generating Scheduling Heuristics

The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

Morris, Robert↗

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.↗

Mission Operations Planning and Scheduling System (MOPSS)

MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

Wood, Terri↗

Assessment of New Load Schedules for the Machine Calibration of a Force Balance

New load schedules for the machine calibration of a six-component force balance are currently being developed and evaluated at the NASA Ames Balance Calibration Laboratory. One of the proposed load schedules is discussed in the paper. It has a total of 2082 points that are distributed across 16 load series. Several criteria were applied to define the load schedule. It was decided, for example, to specify the calibration load set in force balance format as this approach greatly simplifies the definition of the lower and upper bounds of the load schedule. In addition, all loads are assumed to be applied in a calibration machine by using the one-factor-at-a-time approach. At first, all single-component loads are applied in six load series. Then, three two-component load series are applied. They consist of the load pairs (N1, N2), (S1, S2), and (RM, AF). Afterwards, four three-component load series are applied. They consist of the combinations (N1, N2, AF), (S1, S2, AF), (N1, N2, RM), and (S1, S2, RM). In the next step, one four-component load series is applied. It is the load combination (N1, N2, S1, S2). Finally, two five-component load series are applied. They are the load combination (N1, N2, S1, S2, AF) and (N1, N2, S1, S2, RM). The maximum difference between loads of two subsequent data points of the load schedule is limited to 33 % of capacity. This constraint helps avoid unwanted load "jumps" in the load schedule that can have a negative impact on the performance of a calibration machine. Only loadings of the single- and two-component load series are loaded to 100 % of capacity. This approach was selected because it keeps the total number of calibration points to a reasonable limit while still allowing for the application of some of the more complex load combinations. Data from two of NASA's force balances is used to illustrate important characteristics of the proposed 2082-point calibration load schedule.

wind tunnel testing↗

Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

MSL↗

Systematic Hybrid Network Scheduling for Multiple Traffic Classes with Host Timing and Phase Constraints

Systems and methods for systematic hybrid network scheduling for multiple traffic classes with host timing and phase constraints are provided. In certain embodiments, a method of scheduling communications in a network comprises scheduling transmission of virtual links pertaining to a first traffic class on a global schedule to coordinate transmission of the virtual links pertaining to the first traffic class across all transmitting end stations on the global schedule; and scheduling transmission of each virtual link pertaining to a second traffic class on a local schedule of the respective transmitting end station from which each respective virtual link pertaining to the second traffic class is transmitted such that transmission of each virtual link pertaining to the second traffic class is coordinated only at the respective end station from which each respective virtual link pertaining to the second traffic class is transmitted.

Varadarajan, Srivatsan↗

Scheduling and Operations of the Orbiting Carbon Observatory-3 Mission

This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) Orbiting Carbon Observatory-3 (OCO-3) Mission. OCO-3 measures atmospheric carbon dioxide from space. Made from the spare instrument built as a backup to the Orbiting Carbon Observatory-2 (OCO-2), OCO-3 extends the rich set of data collected by OCO-2. OCO-3 is outfitted with an agile Pointing Mirror Assembly (PMA) that allows for more detailed types of observations and rapid mode transitions. The mission uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system for scheduling nominal operations, as well as a separate automated scheduling system developed for scheduling observations for the calibration of the PMA. CLASP is used to schedule the four types of observational modes: Nadir, Glint, Target, and Snapshot Area Map. OCO-3 has a variety of complex mission-specific geometric constraints that were incorporated into CLASP to produce schedules that ensure instrument safety.

Moy, Alan↗

Ground and Onboard Automated Scheduling for the Mars 2020 Rover Mission

The Mars 2020 Rover mission is using automated scheduling in two capacities. As of March 2021 a ground-based scheduler automatically schedules rover wake/sleep and preheats to support Mars 2020 daily operations. Included in the ground system is an explainable scheduling tool that allows users in-sight into the schedule developed by the automated scheduler. An onboard scheduler that will allow the rover autonomously better account for variations in execution is in development for use later in the mission.

Towey, Shannon↗

SatNet: A Benchmark for Satellite Scheduling Optimization

Satellites provide essential services such as networking and weather tracking, and the number of near-earth and deep space satellites are expected to grow rapidly in the coming years. Communications with terrestrial ground stations is one of the critical functionalities of any space mission. Satellite scheduling is a problem that has been scientifically investigated since the 1970s. A central aspect of this problem is the need to consider resource contention and satellite visibility constraints as they require line of sight. Due to the combinatorial nature of the problem, prior solutions such as linear programs and evolutionary algorithms require extensive compute capabilities to output a feasible schedule for each scenario. Machine learning based scheduling can provide an alternative solution by training a model with historical data and generating a schedule quickly with model inference. We present SatNet, a benchmark for satellite scheduling optimization based on historical data from the NASA Deep Space Network. We propose formulation of the satellite scheduling problem as a Markov Decision Process and use reinforcement learning (RL) policies to generate schedules. The nature of constraints imposed by SatNet differ from other combinatorial optimization problems such as vehicle routing studied in prior literature. Our initial results indicate that RL is an alternative optimization approach that can generate candidate solutions of comparable quality to existing state-of-the-practice results. However, we also find that RL policies overfit to the training dataset and do not generalize well to new data, thereby necessitating continued research on reusable and generalizable agents.

Wilson, Brian↗

Energy-efficient cooperative resource allocation and task scheduling for Internet of Things environments

Offloading Internet of Things (IoT) tasks to the cloud for further processing might not always lead to an optimal execution time, particularly in situations such as resource contention, under-provisioning, over-provisioning, and fragmentation. In addition, dynamically optimizing the number of Virtual Machines (VMs) for resource scheduling in order to meet application requirements remains a major research challenge. Further, existing resource scheduling algorithms focus primarily on minimizing operational costs while maximizing resource sharing and utilization. Considering energy utilization as part of the resource allocation and scheduling process as an optimization objective for maintaining load balancing has often been neglected. To address these challenges and more, we propose a cooperative energy-aware resource allocation and scheduling strategy based on a Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) multi-criteria decision-making method. Here we used the Grid Workloads Archive dataset to evaluate our proposed approach named TOPREAL. Experimental results with respect to the allocation of VM resources when considering processing a large segment of tasks indicate that TOPREAL outperforms existing algorithms in terms of energy savings, with an average improvement of 40.25%, while maintaining an average improvement of 16.21% when it comes to execution time. Results also demonstrate that our method can save an average of 78.06 processing hours and 63,215kJ of energy when compared to existing scheduling algorithms. These results demonstrate the effectiveness of our proposed model and the viability of using multi-criteria decision-making techniques such as TOPSIS to solve the resource allocation and scheduling problem in edge environments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Numerical study of the effect of propped surface area and fracture conductivity on shale gas production: Application for multi-size proppant pumping schedule design

Hydraulic fracturing is a technique extensively used in the oil and gas industry, where water, proppant (sand) and additives are injected into unconventional reservoirs to enhance the recovery of shale hydrocarbon. Although some previous studies have developed pumping schedules that maximize gas production for a single-size proppant, there are very few studies that consider the effect of varying proppant diameters across pumping stages on shale gas production. Motivated by this, we carried out an extensive sensitivity analysis to determine the effect of different proppant diameters on the average fracture conductivity (FC), average propped surface area (PSA) and cumulative shale gas production volume. We found out that the cumulative shale gas production volume depends on both the average PSA and average FC. We also found out that small-diameter proppant resulted in higher average PSA and lower average FC, whereas large-diameter proppant resulted in lower average PSA and higher average FC. Hence, we designed a multi-size proppant pumping schedule considering both of these parameters into account for simultaneously propagating multiple fractures to maximize shale gas production from unconventional reservoirs. Since the size of injected proppant particles determines the average PSA and average FC for the propped hydraulic fractures, we developed a novel framework called Sequentially Interlinked Modeling Structure (SIMS) to predict the average PSA, average FC and cumulative shale gas production volume at the end of 10 years for a given pumping schedule. Then, we used this SIMS framework to obtain a multi-size proppant pumping schedule that maximizes shale gas production. In closing, we demonstrated that the obtained pumping schedule gives a cumulative shale gas production volume greater than the values obtained from the existing pumping schedules.

03 NATURAL GAS↗

Optimal charging scheduling and management for a fast-charging battery electric bus system

Herein we discuss how battery electric buses (BEBs) are rapidly being embraced by public transit agencies because of their environmental and economic benefits. To address the problems of limited driving range and time-consuming charging for BEBs, manufacturers have developed rapid on-route charging technology that utilizes typical layovers at terminals to charge buses in operation using high power. With on-route fast-charging, BEBs are as capable as their diesel counterparts in terms of range and operating time. However, on-route fast-charging makes it more challenging to schedule and manage charging events for a BEB system. First, on-route fast-charging may lead to high electricity power demand charges. Second, it may increase electricity energy charges because of charging that occurs during on-peak hours. Without careful charging scheduling and management, on-route fast-charging may significantly increase fuel costs and reduce the economic attractiveness of BEBs. The present study proposes a network modeling framework to optimize the charging scheduling and management for a fast-charging BEB system, effectively minimizing total charging costs. The charging schedule determines when to charge a BEB, while the charging management strategically controls the actual charging power. Charging costs include both electricity demand charges and energy charges. The charging scheduling and management problem is first formulated as a nonlinear nonconvex program with time-continuous variables. A discretizing method and a linear reformulation technique are then adopted to reformulate the model as a linear program, which can be easily solved using off-the-shelf solvers, even for large-scale problems. Finally, the model is demonstrated with extensive numerical studies based on two real-world bus networks. The results demonstrate that the proposed model can effectively determine the optimal charging scheduling and management for a fast-charging BEB system, which carries the potential for use in large-scale real-world bus networks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗