Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Validation of Self-Scheduling Countermeasures in NASA's HERA Campaign 6

Enhancing crew capabilities for planning and scheduling activities is critical for periods of increased crew autonomy in future long-duration missions where communication delays preclude real-time ground support from Earth. Our study focuses on how to empower astronauts to manage their timelines independently from the experts in the mission control center (MCC). Our objective was to evaluate the impact of scheduling countermeasures on crew scheduling performance, workload, and usability in an analog mission environment. The study involved 16 crew members across four missions in the Limited Autonomy phase of Human Exploration Research Analog (HERA) Campaign 6. Crew members used Playbook to schedule one operational day for the entire crew. Half the participants accessed scheduling aids, and we compared their performance to a control group with no aids. Performance, workload, and usability were assessed using time on task, violation counts, NASA Task Load Index (NASA-TLX), and System Usability Scale (SUS). Participants using scheduling aids completed sessions 20% faster and committed 33% fewer violations. While these differences were not statistically significant due to the study’s operational limitations, trends indicate that scheduling aids may reduce errors and improve efficiency. These results can inform the design of scheduling tools to enhance astronauts’ autonomy in long-duration space missions, contributing to improved crew performance and reduced reliance on ground support.

space robotics↗

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

Mixed-integer programming models for optimal constellation scheduling given cloud cover uncertainty

We introduce the problem of scheduling observations on a constellation of remote sensors, to maximize the aggregate quality of the collections obtained. While automated tools exist to schedule remote sensors, they are often based on heuristic scheduling techniques, which typically fail to provide bounds on the quality of the resultant schedules. To address this issue, we first introduce a novel deterministic mixed-integer programming (MIP) model for scheduling a constellation of one to n satellites, which relies on extensive pre-computations associated with orbital propagators and sensor collection simulators to mitigate model size and complexity. Our MIP model captures realistic and complex constellation-target geometries, with solutions providing optimality guarantees. We then extend our base deterministic MIP model to obtain two-stage and three-stage stochastic MIP models that proactively schedule to maximize expected collection quality across a set of scenarios representing cloud cover uncertainty. Our experimental conclusions on instances of one and two satellites demonstrate that our stochastic MIP models yield significantly improved collection quality relative to our base deterministic MIP model. We further demonstrate that commercial off-the-shelf MIP solvers can produce provably optimal or near-optimal schedules from these models in time frames suitable for sensor operations.

47 OTHER INSTRUMENTATION↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

End-Use Savings Shapes Measure Documentation: Dispatch Schedule Generation for Demand Flexibility Measures

This supplemental document describes the methodology used for determining the dispatch timing of various EUSS demand flexibility measures. Demand flexibility measures are designed to reduce/dispatch electricity demand in buildings during especially beneficial/critical times. The method used in this work utilizes predictions of building loads to generate a schedule that reflects the periods when the building's daily peak load occurs to support decision making in demand flexibility measures. The dispatch schedule generation method described in this document creates an hourly schedule that includes a load dispatch (peak) window for each day for a whole year based on load prediction, with options using different prediction methods: perfect prediction, bin-sampling method, fixed schedule, and outdoor air temperature (OAT)-based prediction method. The perfect prediction method performs a simulation to obtain the annual load profile as predicted load, representing the scenario of perfect load prediction. The bin-sampling method (1) categorizes days into representative bins by temperature characteristics, (2) performs simulations on sample days from each of those bins to create representative (or predicted) load, and (3) assigns representative loads for all days in a year based on the bin categorization. The fixed schedule method defines uniform start and end time of peak window with assumed fixed daily peak time, for all days in a season or a year. The OAT-based prediction method uses the statistics of OAT (minimum and maximum) as the indicators of peak load, with specified delay response time from building loads to temperature. Given the load prediction, daily peak periods are determined as a time window with specified length in each day that include the predicted daily peak load and with a secondary rule such as maximizing energy saving potential. The dispatch schedule generation method is not a standalone measure and is intended to be combined with other demand flexibility measures that could leverage the peak schedule and apply demand controls on specific systems or devices for demand response, such as measures described in "Measure Documentation - Thermostat Control for Load Shedding" and "Measure Documentation - Thermostat Control for Load Shifting".

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OctoFAS: A Two-Level Fair Scheduler That Increases Fairness in Network-Based Key-Value Storage

We identified a fairness problem in a network-based key-value storage system using Intel Storage Performance Development Kit (SPDK) in a multitenant environment. In such an environment, each tenant’s I/O service rate is not fairly guaranteed compared to that of other tenants. To address the fairness problem, we propose OctoFAS, a two-level fair scheduler designed to improve overall throughput and fairness among tenants. The two-level scheduler of OctoFAS consists of (i) inter-core scheduling and (ii) intra-core scheduling. Through inter-core scheduling, OctoFAS addresses the load imbalance problem that is inherent in SPDK on the storage server by dynamically migrating I/O requests from overloaded cores to underloaded cores, thereby increasing overall throughput. Intra-core scheduling prioritizes handling requests from starving tenants over well-fed tenants within core-specific event queues to ensure fair I/O services among multiple tenants. OctoFAS is deployed on a Linux cluster with SPDK. Through extensive evaluations, we found that OctoFAS ensures that the total system throughput remains high and balanced, while enhancing fairness by approximately 10% compared to the baseline, when both scheduling levels operate in a hybrid fashion.

97 MATHEMATICS AND COMPUTING↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

Separation Assurance and Scheduling Coordination in the Arrival Environment

Separation assurance (SA) automation has been proposed as either a ground-based or airborne paradigm. The arrival environment is complex because aircraft are being sequenced and spaced to the arrival fix. This paper examines the effect of the allocation of the SA and scheduling functions on the performance of the system. Two coordination configurations between an SA and an arrival management system are tested using both ground and airborne implementations. All configurations have a conflict detection and resolution (CD&R) system and either an integrated or separated scheduler. Performance metrics are presented for the ground and airborne systems based on arrival traffic headed to Dallas/ Fort Worth International airport. The total delay, time-spacing conformance, and schedule conformance are used to measure efficiency. The goal of the analysis is to use the metrics to identify performance differences between the configurations that are based on different function allocations. A surveillance range limitation of 100 nmi and a time delay for sharing updated trajectory intent of 30 seconds were implemented for the airborne system. Overall, these results indicate that the surveillance range and the sharing of trajectories and aircraft schedules are important factors in determining the efficiency of an airborne arrival management system. These parameters are not relevant to the ground-based system as modeled for this study because it has instantaneous access to all aircraft trajectories and intent. Creating a schedule external to the CD&R and the scheduling conformance system was seen to reduce total delays for the airborne system, and had a minor effect on the ground-based system. The effect of an external scheduler on other metrics was mixed.

function allocation↗

Human Factors Assessment of Disturbances to Scheduled Performance-Based Navigation Arrival Operations

The introduction of Performance-Based Navigation (PBN) specifications to air traffic management has resulted in many benefits during nominal operations, including shorter flight paths, reduced fuel costs, and improved terminal area arrival rates. However, these benefits become less noticeable during off-nominal operations where aircraft are routinely interrupted from staying on PBN procedures due to disturbances such as missed approaches. This human-in-the-loop (HITL) study used multiple types of disturbance events to perturb the arrival schedule. Perturbed schedules were managed with different types of schedule adjustments, including a condition with no adjustments. The study collected data on a host of dependent variables, including human factors measures on controller workload and system performance measures such as schedule nonconformance (nc). Initial analyses showed strong correlations between aggregated controller workload and aggregated nc, as well as benefits of both automatic and manual schedule adjustments for increasing system performance, such as reduced PBN procedure interruptions. The goal of this paper is to further test these initial findings. The results indicated that an increase in schedule nonconformance correlated with an increase in controller workload at specific time intervals, and automated schedule adjustments consistently reduced controller workload associated with nonconformance.

Human factors↗

Towards a Characterization of Scheduling Task Complexity

Future long-duration missions will require astronauts to act more autonomously, manage their schedules, and replan timelines as anomalies and discoveries occur. Astronauts are not professional planners, however, and the complexity of schedules that novice planners can complete successfully is not fully understood. To identify the primary factors which contribute to scheduling task complexity, we conducted a human-in-the-loop study and developed planning algorithms to investigate how the type and amount of constraints affect the difficulty of scheduling and rescheduling. We created rankings of difficulty using a combination of human performance metrics from experimental planning tasks and metrics describing the final plans that participants scheduled. Using the results of our scheduling and rescheduling algorithm algorithms, we created a similar ranking with which to compare. We created rankings which compared well between the experimental and algorithm results for the scheduling task, but the rescheduling task proved more difficult to estimate.

scheduling↗

Towards a Characterization of Scheduling Task Complexity

Future long-duration missions will require astronauts to act more autonomously, manage their schedules, and replan timelines as anomalies and discoveries occur. Astronauts are not professional planners, however, and the complexity of schedules that novice planners can complete successfully is not fully understood. To identify the primary factors which contribute to scheduling task complexity, we conducted a human-in-the-loop study and developed planning algorithms to investigate how the type and amount of constraints affect the difficulty of scheduling and rescheduling. We created rankings of difficulty using a combination of human performance metrics from experimental planning tasks and metrics describing the final plans that participants scheduled. Using the results of our scheduling and rescheduling algorithm algorithms, we created a similar ranking with which to compare. We created rankings which compared well between the experimental and algorithm results for the scheduling task, but the rescheduling task proved more difficult to estimate.

scheduling↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗

Load‐balanced and locality‐aware scheduling for data‐intensive workloads at extreme scales

Summary Data‐driven programming models such as many‐task computing (MTC) have been prevalent for running data‐intensive scientific applications. MTC applies over‐decomposition to enable distributed scheduling. To achieve extreme scalability, MTC proposes a fully distributed task scheduling architecture that employs as many schedulers as the compute nodes to make scheduling decisions. Achieving distributed load balancing and best exploiting data locality are two important goals for the best performance of distributed scheduling of data‐intensive applications. Our previous research proposed a data‐aware work‐stealing technique to optimize both load balancing and data locality by using both dedicated and shared task ready queues in each scheduler. Tasks were organized in queues based on the input data size and location. Distributed key‐value store was applied to manage task metadata. We implemented the technique in MATRIX, a distributed MTC task execution framework. In this work, we devise an analytical suboptimal upper bound of the proposed technique, compare MATRIX with other scheduling systems, and explore the scalability of the technique at extreme scales. Results show that the technique is not only scalable but can achieve performance within 15% of the suboptimal solution. Copyright © 2015 John Wiley & Sons, Ltd.

Wang, Ke↗

Improving logistic efficiency of WEEE collection through dynamic scheduling using simulation modeling

Highlights: • Latest EU regulation on WEEE require more flexible logistics models. • The implementation of dynamic scheduling is evaluated for WEEE collection. • A hybrid simulation model compares dynamic (pure and “mixed”) and static collection schemes. • Results confirm the higher flexibility and efficiency of dynamic systems. • Dynamic scheduling “mixed” solutions result more efficient than pure ones. - Abstract: The complexity of collection systems for Waste from Electric and Electronic Equipment (WEEE) in the EU is increasing, due to the latest directive that sets new collection targets and modes. The high variability and the uncertainty of reverse flows require innovative logistic approaches. One recent option for increasing efficiency and responsiveness in waste collection services, boosted by new technological solutions for waste level monitoring, is to adopt a dynamic collection scheme, where the collection frequency is not established a priori (based on a fixed plan), but it is based on the actual filling levels of waste bins. This option can allow the service provider to plan the collection service following the actual demand, resulting in a more responsive service, while improving the logistic efficiency. This paper evaluates the implementation of dynamic scheduling schemes for the collection of WEEE. A hybrid simulation model has been developed in order to support researchers and practitioners in assessing quantitative impacts of adopting dynamic scheduling in WEEE collection. Three logistic alternatives (a fixed collection schedule scheme, a pure dynamic scheme and a mixed one) have been compared in a test case based on data of an Italian municipality; collection services for different types of WEEE (i.e. large appliances and small items) have been analyzed. Results show a promising performance of dynamic schedules compared to the fixed one, revealing, for the specific test case, how a mixed solution can combine the advantages of dynamic and fixed scheduling, gaining flexibility towards customer demand while improving truck resource utilization.

42 ENGINEERING↗

HPC Digital Twins for Evaluating Scheduling Policies, Incentive Structures and their Impact on Power and Cooling

Schedulers are critical for optimal resource utilization in high-performance computing. Traditional methods to evaluate sched- ulers are limited to post-deployment analysis, or simulators, which do not model associated infrastructure. In this work, we present the first-of-its-kind integration of scheduling and digital twins in HPC. This enables what-if studies to understand the impact of parameter configurations and scheduling decisions on the physical assets, even before deployment, or regarching changes not easily realizable in production. We (1) provide the first digital twin framework extended with scheduling capabilities, (2) integrate various top-tier HPC systems given their publicly available datasets, (3) implement extensions to integrate external scheduling simulators. Finally, we show how to (4) implement and evaluate incentive structures, as- well-as (5) evaluate machine learning based scheduling, in such novel digital-twin based meta-framework to prototype scheduling. Our work enables what-if scenarios of HPC systems to evaluate sustainability, and the impact on the simulated system.

Maiterth, Matthias [ORNL] (ORCID:000000018698460X)↗

Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

Craft, R.↗

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

Guaranteed properties of gain scheduled control for linear parameter-varying plants

Gain scheduling has proven to be a successful design methodology in many engineering applications. However, in the absence of a sound theoretical analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain scheduled design. This paper presents such an analysis for one type of gain scheduled system, namely, a linear parameter-varying plant scheduling on its exogenous parameters. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled design. These conditions confirm and formalize popular notions regarding gain scheduled design, such as the scheduling variable should 'vary slowly'.

Shamma, Jeff S.↗