Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reuse”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2009 through October 31, 2010. The report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Groundwater monitoring data • Status of compliance activities • Discussion of the facility’s environmental impacts During the 2010 permit year, approximately 164 million gallons of wastewater were discharged to the Cold Waste Pond. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters were below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

99 GENERAL AND MISCELLANEOUS↗

2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

99 GENERAL AND MISCELLANEOUS↗

2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

99 GENERAL AND MISCELLANEOUS↗

2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

2012↗

2012 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2011 through October 31, 2012. The report contains the following information: • Facility and system description, • Permit required effluent monitoring data and loading rates, • Groundwater monitoring data, • Status of compliance activities, • Noncompliance issues, and • Discussion of the facility’s environmental impacts. During the 2012 permit year, approximately 183 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters were below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

2012 wastewater reuse report↗

2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.

2013 annual wastewater reuse report↗

2013 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2012–October 31, 2013. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates • Groundwater monitoring data; (3) Status of compliance activities; (4) Noncompliance issues; and (5) Discussion of the facility’s environmental impacts. During the 2013 permit year, approximately 238 million gallons of wastewater was discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters are below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US Potable Water Reuse System Costs

This submission contains a set of U.S.-specific potable reuse capital and operations and maintenance (O&M) cost data ($2020) found in published presentations and reports from engineering consulting firms, utility and water agency press releases or websites, and literature. For any unbuilt facilities, the reported costs found in technical documents are mostly engineer estimates and may be subject to change as construction proceeds. This data set contains a mix of both facility specific and total capital costs, which include conveyance infrastructure. Note that this dataset does not include detailed cost breakdowns for each of the facilities. This submission also contains the sources used to build this dataset in pdf format.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High‐Efficiency Solar Cells Grown on Spalled Germanium for Substrate Reuse without Polishing

Abstract Radical reduction of III–V device costs requires a multifaceted approach attacking both growth and substrate costs. Implementing device removal and substrate reuse provides an opportunity for substrate cost reduction. Controlled spalling allows removal of thin devices from the expensive substrate; however, the fracture‐based process currently generates surfaces with significant morphological changes compared to polished wafers. 49 single junction devices are fabricated across the spalled surface of full 50 mm germanium wafers without chemo‐mechanical polishing before epitaxial growth. Device defects are identified and related to morphological spalling defects—arrest lines, gull wings, and river lines—and their impact on cell performance using physical and functional characterization techniques. River line defects have the most consistent and detrimental effect on cell performance. Devices achieve a single junction efficiency above 23% and open‐circuit voltage of 1.01 V, demonstrating that spalled germanium does not need to be returned to a pristine, polished state to achieve high‐quality device performance.

14 SOLAR ENERGY↗

$\mathrm{PPT}$-Multicore: performance prediction of Open$\mathrm{MP}$ applications using reuse profiles and analytical modeling

In this report we present PPT-Multicore, an analytical model embedded in the Performance Prediction Toolkit (PPT) to predict parallel applications’ performance running on a multicore processor. PPT-Multicore builds upon our previous work towards a multicore cache model. We extract LLVM basic block labeled memory trace using an architecture-independent LLVM-based instrumentation tool only once in an application’s lifetime. The model uses the memory trace and other parameters from an instrumented sequentially executed binary. We use probabilistic and computationally efficient reuse profiles to predict the cache hit rates and runtimes of OpenMP programs’ parallel sections. We model Intel’s Broadwell, Haswell, and AMD’s Zen2 architectures and validate our framework using different applications from PolyBench and PARSEC benchmark suites. The results show that PPT-Multicore can predict cache hit rates with an overall average error rate of 1.23% while predicting the runtime with an error rate of 9.08%.

97 MATHEMATICS AND COMPUTING↗

Analysis of backwash settings to maximize net water production in an engineering-scale ultrafiltration system for water reuse

Ultrafiltration (UF) has been widely utilized as water pretreatment for different applications especially in water reuse. The UF system operation is characterized by a filtration phase, where particles accumulate on the membrane surface resulting in an increase in the transmembrane pressure (TMP) and a cleaning phase, where foulants are removed through cleaning cycles including physical backwash and chemical-enhanced backwash (CEB). In this study, data from an engineering-scale UF system treating reclaimed wastewater were used to assess the impact of backwashing on the filtration process. TMP backwash trigger, backwash duration, and CEB frequency were purposely varied for a cycle-by-cycle investigation on the net water production, water recovery, initial operating TMP, and filtration cycle duration. As the TMP backwash trigger was varied between 62 and 145kPa, the maximum net water production (63 m 3 /d) was achieved at 103kPa and water recovery remained relatively constant at approximately 92%. Backwash durations of 45, 65, and 85s were performed where both net water production and water recovery yielded similar results (~63 m 3 /d and ~ 91%) compared with 103kPa TMP backwash trigger. The CEB frequency was also lowered from one every three backwashes (1/3) to 1/6 and 1/12 and resulted in decreased net water production and water recovery while the initial TMP increased. Interestingly, the total number of CEBs remained approximately constant regardless of their frequency. In conclusion, results suggest that CEB is an important fouling control process to maximize water production.

42 ENGINEERING↗

Seeding Advanced Treated Wastewater for Purposes of Direct Potable Reuse

Direct potable reuse (DPR) is a promising solution to address water scarcity. However, a better understanding of how introducing advanced treated water (ATW) affects microbial communities present in distribution systems is needed. Here, in this study, we measured changes to the microbial water quality in simulated distribution systems that were conditioned using treated, unimpaired surface water (SW) and then transitioned to ATW. In addition, we investigated whether adding a biological filtration step would seed the microbial community of the ATW and whether the influence would persist in the simulated distribution systems. We found that the bulk water in the ATW-fed distribution systems had lower cell counts and ATP concentrations and a distinct microbial community (based on 16S amplicon sequencing) compared to the SW-fed or the seeded ATW-fed systems. However, biofilm community composition and biomass remained consistent regardless of the feedwater. Increased microbial biomass and diversity were present in the seeded ATW, with several amplicon sequence variants identified as being introduced by the biological filter. Our results suggest that directly introducing ATW to distribution systems could disturb the existing microbial community. Preparing ATW for distribution via biological filtration may deliver more predictable and stable microbial water quality than introducing unseeded ATW.

16S↗

Radiological Monitoring Results For Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: May 1, 2010-October 31, 2010

This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond (#LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

54 ENVIRONMENTAL SCIENCES↗

Radiological Monitoring Results For Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: November 1, 2010-October 31, 2011

This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond (No.LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2014 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2013, through October 31, 2014. The report contains, as applicable, the following information; Site description; Facility and system description; Permit required monitoring data and loading rates; Status of compliance conditions and activities; and Discussion of the facility’s environmental impacts. The current permit expires on March 16, 2015. A permit renewal application was submitted to Idaho Department of Environmental Quality on September 15, 2014. During the 2014 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. Seepage testing of the three lagoons was performed between August 26, 2014 and September 22, 2014. Seepage rates from Lagoons 1 and 2 were below the 0.25 inches/day requirement; however, Lagoon 3 was above the 0.25 inches/day. Lagoon 3 has been isolated and is being evaluated for future use or permanent removal from service.

2014 Annual Wastewater Reuse Report Central Facili↗

2014 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2013–October 31, 2014. The report contains the following information; Facility and system description; Permit required effluent monitoring data and loading rates; Permit required groundwater monitoring data; Status of compliance activities; Noncompliance issues; and Discussion of the facility’s environmental impacts. During the 2014 permit year, approximately 238 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters are below the Ground Water Quality Rule Secondary Constituent Standards in the downgradient monitoring wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗