Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Ascorbic Acid Stability and pH Testing to Support RWM-018 Pilot Scale Wellhead Treatment System Feasibility Determination

A multitude of groundwater remediation techniques for chlorinated volatile organic compounds (cVOCs) have been conducted at the A/M-Areas of the Savannah River Site (SRS). Historical in-situ chemical oxidation (ISCO) injections of potassium permanganate and sodium persulfate conducted in 2018 and 2020, have left residual oxidant concentrations in the A/M-Area groundwater system. ISCO events targeted dense non-aqueous phase liquids (DNAPLs) through the injection of strong oxidants within plume zones upgradient of current groundwater recovery wells RWM-008 and RWM-018. These residual oxidants could significantly impede the operation of the mercury removal system needed to meet National Pollutant Discharge Elimination System (NPDES) permit requirements for the ongoing pump-and-treat system that hydraulically controls potions of the A/M-Area plume. Effluent treated groundwater from this system is discharged to surface water at the receiving outfall of the M-1 Air Stripper. To prevent interference of the M-1 Air Stripper system by residual oxidants, groundwater recovery has been ceased at well RWM-018. Modeling of oxidant transport in A/M-Area from ISCO estimated that the potential oxidant load contributed by RWM-018 could be as high as 120 mg/L. It is also possible that oxidants may be contributed via pumping at well RWM-008 in the near future as residual oxidants within the aquifer migrate toward its zone of influence. Savannah River National Laboratory (SRNL) has conducted research to investigate potential pre-treatment chemicals to neutralize these residual oxidants, before reaching the M-1 Air Stripper, to allow for resumed groundwater recovery at RWM-018 and continued pumping at RWM-008. Deployment of ascorbic acid for neutralization of residual oxidants at RWM-018 (and possibly RWM-008) is recommended based on results from previous reductant testing (SRNL, 2021). For a maximum estimated oxidant load at RWM-0018, a well-head treatment system would need to dose about 400 gallons of ascorbic acid each month to ensure complete neutralization. A second system with additional reagent should also be considered for deployment at RWM-008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Single Spoke Resonator (SSR) Cryomodules Assembly Tooling and Procedure for PIP-II

This report is a resume of the activities in which I was involved during my internship at Fermilab Particle Physics and Accelerator Laboratory in Batavia. The project at whom my work is connected is the PIP-II (Proton Improvement Plan – II), in particular I worked on the SSR cryomodules. The main task of my training program was to write an Engineering Note concerning the design of the lifting holders for the SSR1 and SSR2 string assembly. In the meanwhile, I was also commissioned to design some additional components that will take part actively in the project as well. During the initial phase I was lightly trained about the project and its general design, then I was supervised on my specific tasks. I want to thank primarily Jacopo Bernardini that was my supervisor, he attempted to create a favorable workplace, suggesting, listening and meeting all the requests, without his help achieving the result would have been greatly harder. Donato Passerelli and Mattia prise deserve a special thanks too for being always available for support and source of motivation. I had also the chance to share my work during the "Weekly Students Meetings" dealing with other bright engineers and students such as Colin Narug and Caleb Denton. I want also to express my gratitude to Simone Donati, Giorgio Bellettini and Emanuela Barzi that make this unique experience possible organizing this program for decades.

42 ENGINEERING↗

MPEX AI Digital Twins

All magnetically confined plasma fusion power plant concepts (Tokamak, Spherical Tokamak, Stellarator, Mirror, ...) must exhaust the heat and plasma from the core confinement region to the material walls. The primary channel for this exhaust is through a plasma divertor which directs plasma along open magnetic field lines to a material target. The Material Plasma Exposure eXperiment (MPEX) illustrated in Figure 1, is a high-power, steady-state linear plasma device designed to produce the plasma material interaction (PMI) conditions of the divertor of future magnetic confinement fusion power plants: energy flux 20MW/m 2 , ion fluence 1031/m 2 , pulse duration 106 sec. These goals of plasma exposure in MPEX are well beyond those achieved in magnetic fusion experimental devices. Successfully achieving these high power steady state conditions for long pulses requires operational control of the heating and particle sources and the plasma flux to the walls and target. The MPEX AI Hot Spot Controller, proposed in this project, will help achieve the operational milestones of MPEX. The MPEX device will begin commissioning at the end of FY26. A smaller proto-MPEX was operated for 14,666 plasma discharges and will resume operation in September of 2025 as proto-MPEX-lite, with reduced capability, to test a new window for the Helicon plasma source. The proto-MPEX data has undergone surrogate modeling with machine learning methods (R. Archibald, 2022 IEEE International Conference on Big Data). This proto-MPEX data will be used to begin development of the AI digital twins described in this white paper. The scientific mission of MPEX is to qualify materials of different composition for use in the high energy and plasma flux conditions of a fusion power plant. The materials exposed in MPEX will in some cases be exposed to high neutron fluxes at other ORNL facilities to measure the changes to their PMI properties. The targets exposed in MPEX will be transported under vacuum to a Surface Analysis Station (SAS). The SAS will be equipped with the following diagnostics: Focused Ion Beam (FIB) for trench milling, 100-400 angstrom resolution scanning electron microscope (SEM), surface mapping x-ray spectrometer, high resolution camera, and a future upgrade to a laser induced breakdown spectroscopy quadruple mass spectrometer (LIBS-QMS). The MPEX experiments will generate diverse pre- and post-exposure measurement data of detailed material properties down to the crystal grain level in 3D for post-exposure assessment of PMI damage (e.g. cracking, melting, erosion and redeposition of the material). Physics models for the PMI, and how the material composition and manufacturing impact its performance under high energy plasma exposure, need to be validated with MPEX data to guide the selection of new candidate materials. Our vision for the MPEX AI Digital Twins project is to supply experimental and physics model simulation data to train Artificial Intelligence (AI) models for data processing, analysis, operational control, PMI and materials simulation to maximize the scientific output of the MPEX device. Ultimately, an AI digital twin of MPEX material assessment metrics for tested and synthetic material types with simulated PMI will be trained by the AI Modeling Teams on the experimental and physics simulation data submitted to the American Science Cloud by this project. A purely empirical search for the best material is inefficient given the finite number of samples that can be tested on MPEX. In order to expand the material properties database for training the MPEX Material Assessment AI Digital Twin, and to gain physics understanding of the PMI processes, physics models of the material properties and PMI processes are required. The physics simulations provide detailed simulation data, like impact angles for plasma ions, sputtering yields, transport of the ionized sputtered target material in the plasma, and redeposition locations. This simulation data expands the measurement data for deeper physics understanding. The experimental data is essential to validate the PMI and material structure simulation models. The validated models can then be used to generate new simulation data of MPEX material assessments for synthetic material compositions that have not been exposed in MPEX. These predictive simulations, plus the whole experimental dataset, will be used to train the MPEX Material Assessment AI Digital Twin allowing a rapid generative AI search for new materials with reduced PMI damage by interpolating the domain of the training set. These new optimum materials can be simulated with the physics codes and/or tested in MPEX. The ability of AI neural networks to interpolate multi-dimensional parameter spaces and generate virtual data is exploited for a more efficient search for optimum materials. The advent of the Transformational AI Models Consortium (TAIMC) is an opportunity to engage with state of the art private and public AI developers to achieve the goals of the AI digital twins and AI accelerated physics models proposed in this project. Our partners at ORNL from the Advance Scientific Computing Research (ASCR) organization will collaborate in accelerating the integrated plasma material interaction simulation framework. This simulation framework will provide a platform for generating simulation data across a range of physical fidelities, including hybrid methods that produce multi-fidelity results. This data will be leveraged for AI model development, both for generation of surrogates and the automation of simulation campaigns. A part of the research below will include collaborative efforts with the TAIMC to (i) adapt data storage approaches to ensure AI-readiness, (ii) provide a protypical exemplar to inform and exercise constructed workflows, and (iii) generate and share data, using the TAIMC unified AI data standard, for foundational models that will be trained from multiple sources across the DOE complex. We will also collaborate with the TAIMC, as well as the planned AI modeling teams, to develop approaches for reducing the cost of data generation. These include tailored multi-fidelity approaches as well as fine-tuning strategies to augment general, large-scale foundational models.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Report on Retrieval of the Reactor Pressure Vessel A-60 Surveillance Capsule from Palisades Nuclear Generating Station

Located on the shores of Lake Michigan, the Palisades Nuclear Generating Station (PNGS) was a nuclear power plant that operated in Covert Township, Michigan. The plant had a single pressurized water reactor that produced electricity for the region. The PNGS was shut down in 2022 after more than four decades of service. The PNGS included in its surveillance program a surveillance capsule, designated A-60, containing specimens of a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. The capsule was removed from its surveillance position in the early 1995 and has been resident in the spent fuel pool since that time. This capsule was irradiated to a fluence of 1.87×10 20 n/cm 2 (E> 1MeV) that is equivalent for more than 120 effective full power year (EFPY) for the US reactor pressure vessel (RPV) fleet. The material is also of special interest because of its very high nickel content and potential for development of NiMnSi (nickel-manganese-silicon) precipitates. Combination of very high fluence and very high Ni and Cu content makes the material in this capsule of the great interest as benchmark for currently developing embrittlement trend curves (ETC) aiming to predict embrittlement at high fluences. Thus, several years ago the Light Water Reactor Sustainability Program (LWRSP) initiated negotiations with Entergy to harvest this high fluence capsule since it did not present any regulatory interest for PNGS but could play a very important role for LWRSP efforts for developing ETC for very long-term operation. The negotiations resumed once PNGS ownership moved to the Holtec International in June 2022 which was very supportive to the LWRSP efforts to harvest the A-60 capsule from the spent fuel pool. As a result, the contract was placed with the Westinghouse Electric Company (WEC) to come to PNGS site, retrieve the A-60 capsule, bring it to WEC Churchill hot cell facility, open the capsule and send all surveillance specimens in the capsule to ORNL for future characterization. These specimens from the PNGS A-60 capsule have arrived to ORNL in July 2023 and this report summarizes activities to retrieve and deliver specimens to ORNL site for future evaluation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Stockpile Stewardship and Nuclear Testing: A Technical Assessment

Since 1992, the United States has retained confidence in its nuclear weapon stockpile without performing any tests that produce nuclear yield. Instead, it has invested in a stockpile stewardship program (SSP) based on the same approach that was validated through fifty years of experience during the nuclear testing era. As the test moratorium continues and new information becomes available, it is both necessary and appropriate to periodically revisit the question of whether or not nuclear testing should resume. In a recent article by Dr. Mark Schneider, he asserts that the United States should return to nuclear testing to address the issues that negatively affect our country’s nuclear deterrent. A serious, technically informed evaluation of the most significant of the issues Dr. Schneider has raised is provided in this paper. The conclusion of this evaluation is that the strategy of a well-funded SSP coupled with rigorous assessments to identify if there is a specific need for a nuclear test is sound and cost-effective approach. Any decision otherwise needs to take into careful consideration all the classified SSP successes and data pertaining to the particular issues in question.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Precursor Analysis Report: Ryuk Ransomware Attack on Universal Health Services 2020

The Ryuk Ransomware Attack on Universal Health Services (UHS) 2020 Precursor Analysis Report leverages publicly available information about the 2020 UHS cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. UHS manages over 400 hospitals and is one of the largest healthcare providers in the United States with 3.5 million patients each year. On 27 September 2020, UHS suffered a widespread ransomware attack that resulted in a denial of service to critical internet-dependent healthcare systems including workstations, phones, and data centers. Employees resorted to filing patient details with pen and paper, while other facilities had to redirect ambulances and urgent patients to other facilities for adequate care. Adversaries carried out the attack with Ryuk, a ransomware that encrypts data and generates a RyukReadMe.txt ransom note with the ransom fee to decrypt the data, varying from 15 Bitcoin (BTC) to 50 BTC, equivalent to roughly $\$$353,892 to $\$$964,617. UHS did not pay the ransom and was able to recover data through backups, but still reported an impact of $\$$67 million dollars in recovery costs. On 29 October, one month after the attack, UHS made an official statement that their systems had been restored and they were resuming normal operations. Researchers and analysts identified 18 unique techniques (used in a sequence of 19 steps) utilized during the attack with a total of 185 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Fourteen of the identified techniques used during the UHS cyber attack were precursors to the triggering event. Analysis identified 106 observables associated with these precursor techniques, 82 of which were assessed to have an increased likelihood of being perceived in the 30 days to two hours preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A novel open-source cultivation system helps establish the first full cycle chemosynthetic symbiosis model system involving the giant ciliate Zoothamnium niveum

Symbiotic interactions drive species evolution, with nutritional symbioses playing vital roles across ecosystems. Chemosynthetic symbioses are globally distributed and ecologically significant, yet the lack of model systems has hindered research progress. The giant ciliate Zoothamnium niveum and its sulfur-oxidizing symbionts represent the only known chemosynthetic symbiosis with a short life span that has been transiently cultivated in the laboratory. While it is experimentally tractable and presents a promising model system, it currently lacks an open-source, simple, and standardized cultivation setup. Following the FABricated Ecosystems (EcoFABs) model, we leveraged 3D printing and polydimethylsiloxane (PDMS) casting to develop simple flow-through cultivation chambers that can be produced and adopted by any laboratory. The streamlined manufacturing process reduces production time by 86% and cuts cost by tenfold compared to the previous system. Benchmarking using previously established optimal growth conditions, the new open-source cultivation system proves stable, efficient, more autonomous, and promotes a more prolific growth of the symbiosis. For the first time, starting from single cells, we successfully cultivated the symbiosis in flow-through chambers for 20 days, spanning multiple generations of colonies that remained symbiotic. They were transferred from chamber to chamber enabling long-term cultivation and eliminating the need for continuous field sampling. The chambers, optimized for live imaging, allowed detailed observation of the synchronized growth between the host and symbiont. Highlighting the benefit of this new system, we here describe a new step in the first hours of development where the host pauses growth, expels a coat, before resuming growth, hinting at a putative symbiont selection mechanism early in the colony life cycle. With this simple, open-source, cultivation setup, Z. niveum holds promises for comparative studies, standardization of research and wide adoption by the symbiosis research community.

59 BASIC BIOLOGICAL SCIENCES↗

diffReplication - An Energy-Aware Fault Tolerance Model for Silent Error Detection and Mitigation in Heterogeneous Extreme-scale Computing Environment

At extreme scale, the frequency of silent errors – a class of errors that remain undetected by low-level error detection mechanisms – increases significantly with the computational complexity of the application and the scale of the computing infrastructure. As hardware and software advances are made to usher in the next scientific era of computing, developing new approaches to mitigate the impact of silent errors remains a challenging problem. In this work, we propose an energy-aware fault-tolerance model, referred to diffReplication to overcome silent errors. In the proposed model, the main process is associated with one replica that executes at the same rate as the main process, and one diffReplica that is executed at a fraction of the main process' execution rate. If the main and its replica reach consensus at the end of a computation phase, the state of the diffReplica is updated and computation is resumed. If the synchronization attempt results in a disagreement, however, the diffReplica increases its execution speed to complete the computation and quickly reach the synchronization barrier. Assuming a single error over any given synchronization interval, a majority voting is used to reach consensus and tolerate silent errors. To further enhance its performance, diffReplication is augmented with speculative execution, whereby the main or its fast replica is selected to continue execution without waiting for the diffReplica. The selection process is based on the previous behaviour of the main and its replica. A performance analysis study is carried out to assess the performance of diffReplication, in terms of the energy saving and time-to-completion reduction achieved by the diffReplication scheme. The experiment shows that speculative execution reduces the time to completion with additional energy, and dynamic decision-making balances the energy consumption and time to completion.

97 MATHEMATICS AND COMPUTING↗

Mind the crosscap: $τ$-scaling in non-orientable gravity and time-reversal-invariant systems

Spectral statistics of quantum chaotic systems are governed by random matrix universality. In many cases of interest, time-reversal symmetry selects the Gaussian Orthogonal Ensemble (GOE) as the relevant universality class. In holographic CFTs, this is mirrored by the presence of non-orientable geometries in the dual gravitational path integral. In this work, we analyze general properties of these matrix models and their gravitational counterparts. First, we develop a formalism to express the universal level statistics in the canonical ensemble for arbitrary spectral curves, leading to a topological expansion with finite radius of convergence in the late-time $τ$-scaling limit. Then, we focus on topological gravity and study topological recursion on the moduli space of non-orientable surfaces. We find that the Weil-Petersson volumes display non-analytic behaviour multiplying polynomials in the boundary lengths. The volumes give rise to wormholes with late-time divergences, in contrast with the orientable case, which is finite. We identify systematic cancellations among WP volumes implied by the consistency and finiteness of the $τ$-scaling limit. In particular, the cancellation of late-time divergences requires a nontrivial genus resummation. Working in the gravitational microcanonical ensemble, we derive and resum all orders of the topological expansion matching the GOE matrix model in the high-energy regime.

Chaotic Dynamics (nlin.CD)↗

Towards an all-orders calculation of the electroweak bubble wall velocity

We analyze Higgs condensate bubble expansion during a first-order electroweak phase transition in the early Universe. The interaction of particles with the bubble wall can be accompanied by the emission of multiple soft gauge bosons. When computed at fixed order in perturbation theory, this process exhibits large logarithmic enhancements which must be resummed to all orders when the wall velocity is large. We perform this resummation both analytically and numerically at leading logarithmic accuracy. The numerical simulation is achieved by means of a particle shower in the broken phase of the electroweak theory. The two approaches agree to the 10$\%$ level. For fast-moving walls, we find the scaling of the thermal pressure exerted against the wall to be $P\sim \gamma^2T^4$, independent of the particle masses, implying a significantly slower terminal velocity than previously suggested.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Stimulation and Injectivity Testing at Raft River, ID EGS Site

The Raft River geothermal field is the site of an innovative Department of Energy Enhanced Geothermal System (EGS) project to determine the viability of using combined thermal and hydraulic stimulation techniques to improve energy production. Well RRG-9 is currently undergoing a stimulation program using injectate from the US Geothermal Raft River Power Plant and cold water from a cooling tower make-up water well. The stimulation began on 13 June 2013 with injection from the power plant at a temperature of about 39 °C and a pressure of 275 psig. Next, two positive displacement plunger type pumps were used to increase the injection pressure and flow rate for about one month. The highest rate achieved was 258 gpm at a pressure of 741 psig. During this time, fluid from the cooler water well was injected for about 2 weeks at various pressures. Then, the pumps were removed and plant injection resumed on 25 September. Plant injection will continue until the spring of 2014, when a high pressure hydraulic stimulation will be conducted. A series of seismic monitoring stations deployed around the well are providing data on seismic events occurring at the site. Over the past year, 51 microseismic events have been recorded, all less than Magnitude 1. During injection, several diagnostic tests were conducted to gain a better understanding of the well and reservoir. A step-rate test was performed on 22 August to measure the in-situ stress and aid in modeling in-situ fractures. A tracer was injected into the well on 9 September. No tracer was detected in adjacent production wells after several months. A second borehole televiewer survey was conducted for comparison to pre-stimulation images. Here, a third borehole televiewer survey is planned after the high pressure stimulation. Injection test data is evaluated in real time. A modified Hall plot analysis indicates the effective permeability is increasing. The injectivity index supports the results of the modified Hall plot analysis. As the thermal stimulation has continued, the injectivity index has consistently followed an upward trend from 0.1 gpm/psi to 0.53 gpm/psi.

enhanced geothermal systems↗

Avances a un ano del PR100: Resultados Preliminares del Modelzacion y Conjuntos de Datos Solares y Eolicos de Alta Resolucion

El estudio de Resiliencia y Transiciones a 100% Energia Renovable de Puerto Rico (PR100) es un estudio de 2 ano de la Oficina de Movilizacion de la Red del Departamento de Energia y seis laboratorios nacionales para analizar exhaustivamente las rutas dirigidas por las personas interesadas hacia un futuro de energia limpia en Puerto Rico. En el Ano 1 del estudio, el equipo PR100, creo y analizo los modelos que alcanzan las metas de energia renovable para Puerto Rico y los objetivos de resiliencia energetica a corto y largo plazo. Esta presentacion, que resume el progreso en el Ano 1, proporciona las consideraciones que pueden informar posibles decisiones de fondos e implementacion potenciales por parte de las agencias federales y locales clave y partes interesadas. Esta presentacion sigue a la publicacion en julio 2022 de un Informe de Seis Meses de Progreso de PR100 (en ingles y espanol), asi como webinarios publicos en febrero 2022 para lanzar el estudio y julio 2022 para presentar la actualizacion a 6 meses. Un informe final por escrito y visuales por la web seran publicados a finales del 2023. Todas las publicaciones y eventos publicos asociados con el estudio estaran disponibles en ingles y espanol. This report is also available in English https://www.nrel.gov/docs/fy23osti/85126.pdf.

datos de recursos eolicos↗

ICRH operations and experiments during the JET-ILW tritium and DTE2 campaigns

2021 has culminated with the completion of the JET-ILW DTE2 experimental campaign. This contribution summarizes Ion Cyclotron Resonance Heating (ICRH) operations from system and physics point of view. Improvements to the (ICRH) system, to operation procedures and to real time RF power control were implemented to address specific constraints from tritium and deuterium-tritium operations and increase the system reliability and power availability during D-T pulses. ICRH was operated without the ITER-Like Antenna (ILA) because water leaked from an in-vessel capacitor into the vessel on day-2 of the D-T campaign. Three weeks were required to identify and isolate the leak and resume plasma operations. Dedicated RF-Plasma Wall Interaction (PWI) experiments were conducted; tritium plasmas exhibit a higher level of Be sputtering on the outer wall and impurity content when compared to deuterium or hydrogen plasmas. The JET-DTE2 campaigns provided the opportunity to characterize ICRH schemes foreseen for the ITER operation, in the ITER like wall environment in ELMy H-mode scenarios aiming at maximizing fusion performance. The second harmonic tritium resonance heating and to a lesser extent minority 3He heating (ITER D-T ICRH reference schemes) lead to improved ion temperature and fusion performance when compared to hydrogen minority ICRH. However, these discharges suffered from a lack of stationarity and gradual impurity accumulation potentially because of a deficit of ICRH power when using JET antennas at lower frequencies. Fundamental deuterium ICRH was used in tritium-rich plasmas and with deuterium Neutral Beam Heating; this ICRH scheme proved to be very efficient boosting ion temperature and fusion performance in these plasmas.

Klepper, C. Christopher↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success Using A Granular-Activated Carbon Filtration Swab to Rehabilitate Westbay{sup R} Multi-level Groundwater Monitoring Wells at the INL - 20544

In November 2015, tetrachloroethylene (PCE) was discovered in groundwater samples collected from a Westbay{sup R} multi-level groundwater monitoring well at the Idaho National Laboratory (INL).a Subsequent investigation determined that PCE was not present in the groundwater. The detected PCE was instead due to inadvertent contamination of the internal tubing fluid in the Westbay well-monitoring system, which is isolated from the surrounding groundwater. Further investigation showed that three of the 11 Westbay wells at the INL contained PCE-contaminated tubing fluid at concentrations above the U.S. Environmental Protection Agency's maximum contaminant level for drinking water (5 μg/L). Loose sediment at the bottom of some Westbay wells was also found to contain PCE; the three wells were then identified for rehabilitation as part of the INL well maintenance program. The unique construction of the Westbay wells - i.e., the small diameter (5.72 cm [2.25 in.]) and the depths of the tubing fluid ranging from 144.8 to 419 m (475 to 1,376 ft) below ground surface - posed unique challenges to the rehabilitation. Because the tubing fluid provides structural integrity, the fluid cannot be removed and then replaced without damaging the integrity of the Westbay well. Additionally, the small diameter of the systems and the associated depths limit the availability of equipment that can be used for the rehabilitation. After an evaluation of potential methods, it was determined that the use of an in-well, custom-fabricated, granular-activated-carbon filtration swab deployed via a wire line would provide the safest and most cost-effective method for rehabilitation. Westbay well rehabilitation started at well MIDDLE-2051 in late June 2018 and paused in December 2018 for the season. The PCE concentration in the tubing fluid at MIDDLE-2051 was initially reduced to a maximum concentration of 3.81 μg/L from a maximum of 642 μg/L, while the concentration of PCE in the sediment had been reduced from 5,360 to 2,270 μg/kg. Sampling was performed at MIDDLE-2051 again in August 2019, and the tubing fluid increased to a maximum concentration of 45.4 μg/L, while the concentration in the sediment decreased further to 1,890 μg/kg due to desorption of PCE from the sediment to the tubing fluid. Rehabilitation resumed at well MIDDLE-2050A in late August 2019, and the PCE concentration in the tubing fluid had been reduced to a maximum concentration of 19.0 μg/L. Although the method has been shown to be time-consuming, it has proven to be effective and safe for personnel performing the work and to the integrity of the well. Future sample data results at all wells will help determine an estimated completion of the rehabilitation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗