At least 181 records · Page 10

Hydropower flexibility valuation tool for flow requirement evaluation

Timing of generation is becoming more and more valuable. This creates greater potential tension between environmental and power system objectives since both systems require their own flow patterns. Identifying win–win outcomes in this context requires being able to discuss the value of flexibility across stakeholder groups. This research proposes a two-stage optimization method to understand hydropower flexibility to meet both environmental and power system requirements. The tool simulates the two-settlement market process in the U.S. by maximizing revenues from both the day-ahead and real-time markets, subject to plant operational limits, regulatory flow and ramping requirements, and uncertainties associated with water availability and market prices. The model is formulated as linear programming problems and solved using IBM ILOG CPLEX optimizer. By examining a range of flow requirements, ramping constraints, and storage capacities, the proposed tool shows how to make more informed decisions to weigh the cost of specific flow requirements in the context of the overall license requirements. Results from the case study show that revenue is more sensitive to the ramping constraints than the minimum flow constraints. We also demonstrate that removing flow constraints in a dry month increases monthly revenue by up to 118%, as opposed to only 1% in a wet month. In addition, our results suggest that using a learning-based water flow forecast results in an increase of monthly revenue up to 6.4% compared with persistence forecast.

13 HYDRO ENERGY↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unlocking load growth at the grid edge: Practices for managing, recovering, and allocating distribution system investments

Utilities and utility regulators are preparing to make significant investments in the electricity distribution system driven by expected load growth in coming years and decades. Regulators will be tasked with vetting investment proposals and implementing cost recovery and allocation mechanisms. In particular, state regulators are anticipating the need to make proactive distribution system investments, building the capability to serve new load in advance of demand. This report focuses on load growth from homes and businesses that adopt electric vehicles and heat pump heating technologies. Through a review of legislation and regulatory dockets in a subset of states, we provide insights into emerging utility and regulatory practices to recover and allocate costs of electrification-driven distribution system investments necessary to accommodate these technologies. Our review focused on utility electrification programs, line extension policies, and proactive investments. Our report is largely descriptive, offering detailed information about approaches different state commissions and utilities have implemented to inform future decision-making.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cliff Retreat Rates Associated with a Low-Level Radioactive Waste Disposal Facility in Los Alamos, New Mexico, USA

We present an analysis and interpretation of potential cliff stability at a low-level waste disposal facility at Los Alamos National Laboratory, New Mexico, using cliff morphologic and fracture characteristics coupled with carbon-14 surface exposure dating. Our study is important as it directly bears on the licensing criteria for low-level radioactive waste sites. We find that future characteristic cliff failures will likely not breach disposal pits and shafts over the 1000-year minimum regulatory period. Further, we find, using a multivariate regression model, that slope angle and cliff face aspect are sub-equal in importance to predict regions of high risk of failure when combined with surface exposure ages and assuming that old exposure ages are most indicative of stability (instability) and therefore can aid decision making in final design implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: "Republic of Centralia Nuclear Security Support Centre Feasibility Report"

[This is part of a hypothetical, scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] This report serves as official record of the coordinated process completed by competent authorities and other organizations with nuclear security responsibilities in the Republic of Centralia to determine the feasibility of establishing and operating a national nuclear security support centre (NSSC). The report summarizes all sustainability needs and available resources identified during the feasibility determination process, including consideration of possible NSSC institutional models, in line with the systematic approach recommended by the International Atomic Energy Agency (IAEA). Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, has prepared this report in collaboration with members of the Committee on Nuclear Security (CNS) and based on input gathered among relevant national stakeholders. The report has been presented to the National Security Advisor (NSA), for final review and decision-making as to whether Centralia should proceed with establishing an NSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Challenges and opportunities for alternative fuels in the maritime sector

Amidst a period of historic transformation, the marine shipping sector faces uncertainty regarding its ability to reliably fuel while remaining compliant with new international environmental regulations and targets. Increasingly stringent environmental standards, and heightened regulatory focus on maritime decarbonization are driving infrastructural and technical development for alternative fuels and mixtures, engine concepts, and operating practices. However, the transition to alternative fueling is highly complex and requires both a global outlook that spans diverse stakeholder demographics and coordination with multiple actors across the value chain. To aid stakeholders involved in decision making and research related to the transition, a scoping study was conducted with the goal of outlining the barriers, uncertainties, and possibilities in the short and long term for the transition. Synthesis of these results provides strategic decision support, technical direction, and a set of R&D priorities for maritime stakeholders and the scientific community.

09 BIOMASS FUELS↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A PROVEN APPROACH FOR EFFECTIVE COMPUTER SECURITY SELF-ASSESSMENTS AT NUCLEAR FACILITIES

A proven method for conducting cybersecurity self-assessments at nuclear power plants is now available for international use. This method was originally developed by Pacific Northwest National Laboratory, under the sponsorship of the U.S. Nuclear Regulatory Commission (NRC), for use at U.S. nuclear power plants. The “Method,” described in NUREG/CR-6847 “Cyber Security Self-Assessment Method for U.S. Nuclear Power Plants,” was originally a limited release document that was withheld from public disclosure but is now publicly available. The Method provides a systematic, phased, and risk-informed approach to help decision makers and security specialists understand their relative cybersecurity posture. Completed Method assessments may be used to support or validate selection of computer security controls to mitigate cyber threats as well as demonstrate compliance with regulations or statutes enacted by competent authorities. The Method assesses the cybersecurity posture of key systems at a nuclear facility with a focus on protection of design base functions. It considers both physical and digital elements of system vulnerabilities and the resulting potential consequences from exploitation. It is well-suited for addressing blended cyberattacks. A semi-quantitative analytical approach is used in the evaluation of potential vulnerabilities, consequences, and risks and provides a technical basis for the selection of security controls to mitigate cyberattacks. The Method’s application at U.S. nuclear power plants has been very encouraging. The only nuclear plant in the United States that did not have adverse findings during its initial NRC computer security inspection prepared for inspection through the diligent application of this self-assessment method and the implementation of recommendations that came out of that self-assessment. Nuclear facilities around the world might find application of the Method extremely helpful for making cost-effective, risk-based decisions regarding computer security and for preparing to pass computer security inspections by their competent authorities.

Cyber security, Nuclear security, Self-assessment↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Sequestration

This study presents a prototype methodology for evaluating the reuse potential of Class II CO₂-enhanced oil recovery (CO₂-EOR) wells as Class VI wells for geologic carbon sequestration. The approach focuses on assessing wellbore construction materials—casing, cement, tubing, and packers—based on U.S. Environmental Protection Agency (EPA) Class VI well conversion guidelines. Utilizing Python scripts and JSON representations, the methodology automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on regulatory and integrity criteria. Key factors include casing integrity, cementing techniques, tubing compatibility, and packer selection. Due to limitations in digitized data, manual verification is required for certain sections. Future enhancements include incorporating non-digitized data via web scraping and machine learning. This research provides a practical framework for well owners and regulators, supporting informed decision-making for sustainable CO₂ storage.

carbon sequestration↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of the Safety Analyses of the Konrad Repository - 20530

The Bundesgesellschaft fuer Endlagerung (BGE) is the license holder of all geological repository sites in Germany since 2017. Besides the construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository, BGE is responsible to carry out the operative tasks of selecting a site for a high-level waste (HLW) repository. The Konrad repository is Germany's first repository for radioactive waste with negligible heat generation, which was fully licensed under atomic law within the scope of a plan approval procedure from the original application in 1982 until the license was granted in 2002 and finally confirmed by the Federal Administrative Court in 2007. The emplacement of LILW was licensed up to a volume of 303,000 m{sup 3} with a total β/γ-activity of 5 x 10{sup 18} Bq and a total α-activity of 1.5 x 10{sup 17} Bq. Currently, the former iron ore mine Konrad is being converted to a repository and is expected to come into operation in 2027. But what if there is no safety case in place nor a regulatory framework tailored for a change of documents in order to ensure the safety according to the state-of-the-art of science and technology during the evolution of a long-term project such as a geological repository? In this presentation, a review procedure of the safety analyses, that have been the basis of the plan approval decision for the Konrad repository at that time, will be described. Furthermore, the first results of this graduated review procedure for updating the safety analyses will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

1.2.2.405 HydroWIRES Topic D1: Capacity Expansion Model (CEM) Enhancements

Long-term grid planning tools have difficulty representing detailed hydropower operating characteristics, which depend not only on technological specifications but also on water management practices and regulations. As a result, the value of hydropower is incompletely characterized, and the potential role of hydropower in the performance and resiliency of the future electric grid is not fully understood. This work will fill that gap by developing new ways to represent hydropower resource, technology, and operational characteristics in electric sector capacity expansion models and implementing them in the open-source version of the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS) model. ReEDS is a well-established national scale grid planning tool used since 2003 by the U.S. Department of Energy and others to explore the evolution of the U.S. electric sector. Improvements will include a comprehensive national resource assessment for pumped storage hydropower and methods for modeling multiple hydropower technology categories characterized by technical, regulatory, and economic characteristics. The project will provide guiding principles and strategies for improving hydropower modeling in capacity expansion models and deliver a first-of-its kind versatile PSH dataset. All data, code, and methods will be publicly available, allowing the industry to better identify the value of hydropower in the future electricity system and make more informed planning decisions.

capacity expansion↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

ON THE LANGUAGE OF RELIABILITY: A SYSTEM ENGINEER PERSPECTIVE

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences and how likely is it to occur. While this definition makes sense in a regulatory based framework to estimate risk associated to power plants (in terms of core damage frequency and large early release frequency), this approach does not provide a useful snapshot of the health of the plant. A possible alternate path can start by redefining the word “risk” to a broader meaning that better reflects the needs of a system health and asset management decision making process. Rather than asking how likely an event can occur (in probabilistic terms), we can ask how far this event is from occurring. We will show how, given the data available from plant equipment reliability and monitoring/diagnostic/prognostic centers, a margin can be described and determined for all type of maintenance approaches (e.g., corrective or predictive maintenance). We will show how to link SSC margin-based reliability models to system reliability models (i.e., fault trees) in order to assess system/plant health and how to perform margin-based system calculations. These calculations are not solved using classical probabilistic calculations applied to sets (as performed by any PRA code) but, instead, through metric spaces operations (i.e., distance/margin based approach).

97 - MATHEMATICS AND COMPUTING↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2023: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under RL stewardship at the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Townsend's Ground Squirrel Conservation on the Hanford Site for Calendar Year 2025

The U.S. Department of Energy (DOE), Hanford Field Office (HFO) conducts ecological monitoring on the DOE-managed portion of Hanford Site (hereby referred to as Central Hanford) to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitat under HFO stewardship on the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. HFO places priority on monitoring plant and animal species or habitats that have specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or are of significant interest to federal, state, or tribal governments or to the public.

54 ENVIRONMENTAL SCIENCES↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗