Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Continued Development of the Rapid Cycle Amine (RCA) System for Advanced Extravehicular Activity Systems

Development activities related to the Rapid Cycle Amine (RCA) Carbon Dioxide (CO2) and Humidity control system have progressed to the point of integrating the RCA into an advanced Primary Life Support System (PLSS 2.0) to evaluate the interaction of the RCA among other PLSS components in a ground test environment. The RCA 2.0 assembly (integrated into PLSS 2.0) consists of a valve assembly with commercial actuator motor, a sorbent canister, and a field-programmable gate array (FPGA)-based process node controller. Continued design and development activities for RCA 3.0 have been aimed at optimizing the canister size and incorporating greater fidelity in the valve actuator motor and valve position feedback design. Further, the RCA process node controller is envisioned to incorporate a higher degree of functionality to support a distributed PLSS control architecture. This paper will describe the progression of technology readiness levels of RCA 1.0, 2.0 and 3.0 along with a review of the design and manufacturing successes and challenges for 2.0 and 3.0 units. The anticipated interfaces and interactions with the PLSS 2.0/2.5/3.0 assemblies will also be discussed.

Papale, William↗

Continued Development of the Rapid Cycle Amine (RCA) System for Advanced Extravehicular Activity Systems

Development activities related to the Rapid Cycle Amine (RCA) Carbon Dioxide (CO2) and Humidity control system have progressed to the point of integrating the RCA into an advanced Primary Life Support System (PLSS 2.0) to evaluate the interaction of the RCA among other PLSS components in a ground test environment. The RCA 2.0 assembly (integrated into PLSS 2.0) consists of a valve assembly with commercial actuator motor, a sorbent canister, and a field-programmable gate array (FPGA)-based process node controller. Continued design and development activities for RCA 3.0 have been aimed at optimizing the canister size and incorporating greater fidelity in the valve actuator motor and valve position feedback design. Further, the RCA process node controller is envisioned to incorporate a higher degree of functionality to support a distributed PLSS control architecture. This paper will describe the progression of technology readiness levels of RCA 1.0, 2.0 and 3.0 along with a review of the design and manufacturing successes and challenges for 2.0 and 3.0 units. The anticipated interfaces and interactions with the PLSS 2.0/2.5/3.0 assemblies will also be discussed.

Papale, William↗

Technology Area Roadmap for In Space Propulsion Technologies

This slide presentation reviews the technology area (TA) roadmap to develop propulsion technologies that will be used to enable further exploration of the solar system, and beyond. It is hoped that development of the technologies within this TA will result in technical solutions that will improve thrust levels, specific impulse, power, specific mass, volume, system mass, system complexity, operational complexity, commonality with other spacecraft systems, manufacturability and durability. Some of the propulsion technologies that are reviewed include: chemical and non-chemical propulsion, and advanced propulsion (i.e., those with a Technology Readiness level of less than 3). Examples of these advanced technologies include: Beamed Energy, Electric Sail, Fusion, High Energy Density Materials, Antimatter, Advanced Fission and Breakthrough propulsion technologies. Timeframes for development of some of these propulsion technologies are reviewed, and top technical challenges are reviewed. This roadmap describes a portfolio of in-space propulsion technologies that can meet future space science and exploration needs.

Johnson, Les↗

Integrating Marine Hydrokinetic and Offshore Wind Energy: A Review of Technologies, Deployment, and Challenges

Together, offshore wind (OSW) and marine hydrokinetic (MHK) technologies have vast potential to expand the world’s access to abundant energy resource. With more than 60 GW of offshore wind energy capacity and 527 MW of ocean energy deployed globally by 2023, there is a significant amount of available resources; however, technical and non-technical challenges prevent the combined large-scale deployment of these technologies. There is still a lack of research that provides a parallel review of both MHK and OSW technologies in order to better understand their synergistic working principles. This paper aimed to address that research gap by presenting a comprehensive side-by-side review of the worldwide technological landscape, global deployment trends, integration strategies, and modeling approaches for MHK and OSW. A particular focus has been given on analyzing existing modeling and simulation techniques, assessing integration and control strategies, and comparing technologies based on water depth. Furthermore, this study provides important insights into the readiness levels of both technologies by highlighting ongoing international projects. By addressing these issues, this review will give researchers and industry stakeholders an outline for assessing the maturity of OSW and MHK systems and facilitating their transition to large-scale, sustainable deployment.

16 - TIDAL AND WAVE POWER↗

Technology Maturation and Flight Validation Experience for NASA's ST8 Mission

Background: a) Introduction to ST8 Project; b) ST8 Project timeline; c) ST8 technology payloads. Technology Readiness Levels (TRLs) as interpreted by NASA's New Millennium Program (NMP). Role of Technology Review Boards (TRBs) in the evaluation of technology maturity for the NMP ST8 Project. Lessons learned from the ST8 TRB experience.

New Millennium Program (NMP)↗

A Novel Sediment Passage Module Design in Support of Standard Modular Hydropower

This document is the Final Technical Report (FTR) for University of Minnesota (UMN) project on the development of a novel sediment (e.g., sand) bypass technology for new stream reach development (NSD). The project duration was slightly over four years and organized over two budget periods (BPs), i.e., BP1 and BP2, with a Go/No-Go review at the end of BP1. The initial technology had a Technology Readiness Level (TRL) of two (2) and, over the life of the project, advanced substantially to TRL 3 or 4.

13 HYDRO ENERGY↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

In-Space Propulsion Program Overview and Status

NASA's In-Space Propulsion (ISP) Program is designed to develop advanced propulsion technologies that can enable or greatly enhance near and mid-term NASA science missions by significantly reducing cost, mass, and/or travel times. These technologies include: Solar Electric Propulsion, Aerocapture, Solar Sails, Momentum Exchange Tethers, Plasma Sails and other technologies such as Advanced Chemical Propulsion. The ISP Program intends to develop cost-effective propulsion technologies that will provide a broad spectrum of mission possibilities, enabling NASA to send vehicles on longer, more useful voyages and in many cases to destinations that were previously unreachable using conventional means. The ISP approach to identifying and prioritizing these most promising technologies is to use mission and system analysis and subsequent peer review. The ISP program seeks to develop technologies under consideration to Technology Readiness Level (TRL) -6 for incorporation into mission planning within 3-5 years of initiation. The NASA TRL 6 represents a level where a technology is ready for system level demonstration in a relevant environment, usually a space environment. In addition, maximum use of open competition is encouraged to seek optimum solutions under ISP. Several NASA Research Announcements (NRA's) have been released asking industry, academia and other organizations to propose propulsion technologies designed to improve our ability to conduct scientific study of the outer planets and beyond. The ISP Program is managed by NASA Headquarters Office of Space Science and implemented by the Marshall Space Flight Center in Huntsville, Alabama.

Wercinski, Paul F.↗

GPS Navigation for the Magnetospheric Multi-Scale Mission

In 2014. NASA is scheduled to launch the Magnetospheric Multiscale Mission (MMS), a four-satellite formation designed to monitor fluctuations in the Earth's magnetosphere. This mission has two planned phases with different orbits (1? x 12Re and 1.2 x 25Re) to allow for varying science regions of interest. To minimize ground resources and to mitigate the probability of collisions between formation members, an on-board orbit determination system consisting of a Global Positioning System (GPS) receiver and crosslink transceiver was desired. Candidate sensors would be required to acquire GPS signals both below and above the constellation while spinning at three revolutions-per-minute (RPM) and exchanging state and science information among the constellation. The Intersatellite Ranging and Alarm System (IRAS), developed by Goddard Space Flight Center (GSFC) was selected to meet this challenge. IRAS leverages the eight years of development GSFC has invested in the Navigator GPS receiver and its spacecraft communication expertise, culminating in a sensor capable of absolute and relative navigation as well as intersatellite communication. The Navigator is a state-of-the-art receiver designed to acquire and track weak GPS signals down to -147dBm. This innovation allows the receiver to track both the main lobe and the much weaker side lobe signals. The Navigator's four antenna inputs and 24 tracking channels, together with customized hardware and software, allow it to seamlessly maintain visibility while rotating. Additionally, an extended Kalman filter provides autonomous, near real-time, absolute state and time estimates. The Navigator made its maiden voyage on the Space Shuttle during the Hubble Servicing Mission, and is scheduled to fly on MMS as well as the Global Precipitation Measurement Mission (GPM). Additionally, Navigator's acquisition engine will be featured in the receiver being developed for the Orion vehicle. The crosslink transceiver is a 1/4 Watt transmitter utilizing a TDMA schedule to distribute a science quality message to all constellation members every ten seconds. Additionally the system generates one-way range measurements between formation members which is used as input to the Kalman filter. In preparation for the MMS Preliminary Design Review (PDR), the Navigator was required to pass a series of Technology Readiness Level (TRL) tests to earn the necessary TRL-6 classification. The TRL-6 level is achieved by demonstrating a prototype unit in a relevant end-to-end environment. The IRAS unit was able to meet all requirements during the testing phase, and has thus been TRL-6 qualified

Bamford, William↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗

Technology requirements and readiness for very large vehicles

Common concerns of very large vehicles in the areas of economics, transportation system interfaces and operational problems were reviewed regarding their influence on vehicle configurations and technology. Fifty-four technology requirements were identified which are judged to be unique, or particularly critical, to very large vehicles. The requirements were about equally divided among the four general areas of aero/hydrodynamics, propulsion and acoustics, structures, and vehicle systems and operations. The state of technology readiness was judged to be poor to fair for slightly more than one half of the requirements. In the classic disciplinary areas, the state of technology readiness appears to be more advanced than for vehicle systems and operations.

Conner, D. W.↗

Technology requirements and readiness for very large aircraft

Common concerns of very large aircraft in the areas of economics, transportation system interfaces and operational problems were reviewed regarding their influence on vehicle configurations and technology. Fifty-four technology requirements were identified which are judged to be unigue, or particularly critical, to very large aircraft. The requirements were about equally divided among the four general areas of aerodynamics, propulsion and acoustics, structures, and vehicle systems and operations. The state of technology readiness was judged to be poor to fair for slightly more than one-half of the requirements. In the classic disciplinary areas, the state of technology readiness appears to be more advanced than for vehicle systems and operations.

Conner, D. W.↗

Review of the ProSEDS Electrodynamic Tether Mission Development

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment was ready to fly as a secondary payload on a Delta-II expendable launch vehicle in late March 2003. Concerns raised in February 2003 by the International Space Station resulted in the delay of the launch of ProSEDS. Issues associated with the delayed launch date and a change in starting altitude resulted in the cancellation of the mission. ProSEDS was intended to deploy a tether (5 km bare wire plus 10 km non-conducting Dyneema) from a Delta I1 second stage to achieve adequate drag thrust that would lower the orbit of the system over days as opposed to months due to atmospheric drag. It was also designed to utilize the tether-generated current to provide limited spacecraft power. Considerable effort and testing went in to developing the ProSEDS system by a dedicated team. Through this effort, important technological issues were identified and addressed and this presentation will discuss some of the important technical issues and hurdles that had to be addressed to successfully prepare for flight. It is intended that this information will be of use for future tether mission and experiment designers.

Vaughn, Jason A.↗

Integrated NASA Lidar System Strategy for Space-Based Remote Sensing

Recent peer reviews of' NASA's space-based lidar missions and of the technology readiness of lasers appropriate for space-based lidars indicated a critical need for an integrated research and development strategy to move laser transmitter technology from low technical readiness levels to the higher levels required for space missions. This paper presents a multi-Center efforts leading to formulation of an integrated NASA strategy to provide the technology and maturity of systems necessary to make Lidar/Laser systems viable for space-based study and monitoring of the earth's atmosphere.

Singh, Upendra N.↗

The Development of Focusing Telescopes for the Hard-X-Ray Region

Grazing-incidence optics has revolutionized soft-x-ray astronomy yet the scientifically-important hard-x-ray region has gone relatively unexplored at high sensitivity and fine angular scales. This situation is now changing with several flight-ready balloon-borne focusing telescopes and planned satellite-borne observatories, This review will discuss some of the developments in mirror and focal plane technologies that are making these payloads possible.

Ramsey, Brian D.↗

Advanced 2-micron Solid-state Laser for Wind and CO2 Lidar Applications

Significant advancements in the 2-micron laser development have been made recently. Solid-state 2-micron laser is a key subsystem for a coherent Doppler lidar that measures the horizontal and vertical wind velocities with high precision and resolution. The same laser, after a few modifications, can also be used in a Differential Absorption Lidar (DIAL) system for measuring atmospheric CO2 concentration profiles. The world record 2-micron laser energy is demonstrated with an oscillator and two amplifiers system. It generates more than one joule per pulse energy with excellent beam quality. Based on the successful demonstration of a fully conductive cooled oscillator by using heat pipe technology, an improved fully conductively cooled 2-micron amplifier was designed, manufactured and integrated. It virtually eliminates the running coolant to increase the overall system efficiency and reliability. In addition to technology development and demonstration, a compact and engineering hardened 2-micron laser is under development. It is capable of producing 250 mJ at 10 Hz by an oscillator and one amplifier. This compact laser is expected to be integrated to a lidar system and take field measurements. The recent achievements push forward the readiness of such a laser system for space lidar applications. This paper will review the developments of the state-of-the-art solid-state 2-micron laser.

Yu, Jirong↗

General-Purpose Heat Source Radioisotope Thermoelectric Generator Flight Unit 5 Refurbished (GPHS-RTG F5R) Power Prediction

INL has evaluated and refurbished General Purpose Heat Source (GPHS) Radioisotope Thermoelectric Generator (RTG) Flight Unit 5 (GPHS-RTG F5R or F5R) that was defueled in 2005. The generator has passed all the INL internal reviews, an end item data package has been delivered to NASA and is ready fueling for a mission. NASA requested a user’s guide for F5R with enough detail for a prospective mission proposal. This report documents the development of the power prediction model used in the user’s guide. The prediction evaluated the thermoelectric “burn-in” and the graceful degradation modes of the missions and developed a thermal inventory dependent equation that predicts the power that matches Galileo, Cassini, and PNH within a three-standard deviation of ±1%. This prediction is only valid for the 30 VDC load voltage of these missions.

30 - DIRECT ENERGY CONVERSION↗

General-Purpose Heat Source Radioisotope Thermoelectric Generator Flight Unit 5 Refurbished (GPHS-RTG F5R) Power Prediction

INL has evaluated and refurbished General Purpose Heat Source (GPHS) Radioisotope Thermoelectric Generator (RTG) Flight Unit 5 (GPHS-RTG F5R or F5R) that was defueled in 2005. The generator has passed all the INL internal reviews, an end item data package has been delivered to NASA and is ready fueling for a mission. NASA requested a user’s guide for F5R with enough detail for a prospective mission proposal. This report documents the development of the power prediction model used in the user’s guide. The prediction evaluated the thermoelectric “burn-in” and the graceful degradation modes of the missions and developed a thermal inventory dependent equation that predicts the power that matches Galileo, Cassini, and PNH within a three-standard deviation of ±1%. This prediction is only valid for the 30 VDC load voltage of these missions.

30 - DIRECT ENERGY CONVERSION↗