ECLIPS at LMD: Preliminary results of phase 2
The LMD (Laboratoire de Meteorologie Dynamique) ground-based backscatter lidar station (48 degrees 4 N, 02 degrees 0 E) near Paris was operated daily during the phase 2 of the Experimental Closed Lidar Pilot Study (ECLIPS) from May 22 to June 19, 1991 simultaneously with a radiometric equipment recording the downward short wavelength (SW) and long wavelength (LW) fluxes. A day-by-day summary of the field measurement as a function of universal time (UT) is given. Considering a 5 days week, there are only two days of missing data (05/31 and 06/06) in our record. The nearby meteorological station (10 km away) provides rawindsounding at 00UT and 12UT. During two days, the French airborne lidar LEANDRE was flown over the ground-based station. The airborne equipment looked down while the ground based equipment looked up. The two lidars were operated at 532 nm, and the on-board radiometers were identical to the ones on the ground. The measurements were synchronized with Advanced Very High Resolution Radiometer (AVHIRR) overpasses as required. We also indicate the Meteosat data corresponding to the period of measurements. Two examples of simultaneous ground-based lidar, pygeometer and pyranometer data are displayed.