Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pump systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Building America Case Study: Standard- Versus High-Velocity Air Distribution in High-Performance Townhomes, Denver, Colorado

IBACOS investigated the performance of a small-diameter high velocity heat pump system compared to a conventional system in a new construction triplex townhouse. A ductless heat pump system also was installed for comparison, but the homebuyer backed out because of aesthetic concerns about that system. In total, two buildings, having identical solar orientation and comprised of six townhomes, were monitored for comfort and energy performance. Results show that the small-diameter system provides more uniform temperatures from floor to floor in the three-story townhome. No clear energy consumption benefit was observed from either system. The builder is continuing to explore the small-diameter system as its new standard system to provide better comfort and indoor air quality. The homebuilder also explored the possibility of shifting its townhome product to meet the U.S. Department of Energy Challenge Home National Program Requirements. Ultimately, the builder decided that adoption of these practices would be too disruptive midstream in the construction cycle. However, the townhomes met the ENERGY STAR Version 3.0 program requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Standard- Versus High-Velocity Air Distribution in High-Performance Townhomes, Denver, Colorado

IBACOS investigated the performance of a small-diameter high-velocity heat pump system compared to a conventional system in a new construction triplex townhouse. A ductless heat pump system also was installed for comparison, but the homebuyer backed out because of aesthetic concerns about that system. In total, two buildings, having identical solar orientation and comprised of six townhomes, were monitored for comfort and energy performance.

air distribution↗

Hybrid renewable pumped storage hydropower energy storage system

A pumped storage hydroelectric system may include a reservoir system including an upper reservoir system and a lower reservoir system. At least one of the upper reservoir system and the lower reservoir system may include a modular reservoir arrangement. A penstock may be coupled with the upper reservoir system. A pump/turbine may be coupled with the penstock and with the lower reservoir system. The pump/turbine may be configured to receive water flowing from the upper reservoir system to the lower reservoir system for generating electrical power, and to pump water from the lower reservoir system to the upper reservoir system for storing energy.

Medina, Hector Eduardo↗

Cryogenic system for the Energy Recovery Linac and vertical test facility at BNL

A small cryogenic system and warm helium vacuum pumping system provides cooling to either the Energy Recovery Linac's (ERL) cryomodules that consist of a 5-cell cavity and an SRF gun or a large Vertical Test Dewar (VTD) at any given time. The cryogenic system consists of a model 1660S PSI piston plant, a 3800 liter storage dewar, subcooler, a wet expander, a 50 g/s main helium compressor, and a 170 m{sup 3} storage tank. A system description and operating plan of the cryogenic plant and cryomodules is given. The cryogenic system for ERL and the Vertical Test Dewar has a plant that can produce the equivalent of 300W at 4.5K with the addition of a wet expander 350 W at 4.5K. Along with this system, a sub-atmospheric, warm compression system provides pumping to produce 2K at the ERL cryomodules or the Vertical Test Dewar. The cryogenic system for ERL and the Vertical Test Dewar makes use of existing equipment for putting a system together. It can supply either the ERL side or the Vertical Test Dewar side, but not both at the same time. Double valve isolation on the liquid helium supply line allows one side to be warmed to room temperature and worked on while the other side is being held at operating temperature. The cryogenic system maintain the end loads from 4.4K to 2K or colder depending on capacity. Liquid helium storage dewar capacity allows ERL or the VTD to operate above the plant's capacity when required and ERL cryomodules ballast reservoirs and VTD reservoir allows the end loads to operate on full vacuum pump capacity when required.

43 PARTICLE ACCELERATORS↗

Refurbishment of a 39 foot thermal vacuum chamber

The 39' thermal vacuum chamber at Space Systems/Loral has been used to test numerous spacecraft including those of the GOES, Intelsat, Insat, Superbird, N-Star, NATO and other programs. Ten years ago, the aluminum LN2 shroud experienced serious fatigue failures in the field welded jumper tubing, effectively shutting down the chamber for vacuum testing. The problem was repaired at the time, but new failures began to reappear a few months ago and are now occurring at a rate that suggests that the shroud may again become inoperable. Consequently, Space Systems/Loral is spending in excess of $6 million to replace the shroud and the existing LN2 equipment with a new, state of the art cryogenic system. In May, 1994, a contract was awarded to remove the existing shroud and LN2 pumping system and replace it with a gravity fed shroud and distribution system. Included in the contract are eight skid mounted gaseous nitrogen pumping systems capable of controlling shroud zone temperatures between +150 C and -180 C. The project is scheduled to be completed in April 1995.

Edwards, Arthur A.↗

Use and engineering of efflux pumps for the export of olefins in microbes

The scope of the project is to investigate efflux pump systems in engineered host microorganisms, such as E. coli, and develop a pump engineered to export a target compound. To initiate the project in coordination with other TOTAL driven projects, the first target compound to be studied was 1-hexene. However, we were investigating other chemicals as Styrene. The main goal of the project was to generate a set of optimized efflux pump systems for microorganisms (E. coli and Streptomyces or other host) engineered to contain biosynthetic pathways to export large titers of target compounds that are toxic (or accumulate and push back biosynthesis) to the host cell. An optimized microbial host will utilize specific and efficient cell wall located pumps to extrude harmful target compounds and enable greater production of these compounds.

60 APPLIED LIFE SCIENCES↗

End-Use Savings Shapes Measure Documentation: Heat Pump Rooftop Units

The heat pump rooftop units (RTUs) measure replaces gas furnace and electric resistance RTUs with high-efficiency heat pump rooftop units (HP-RTUs). The HP-RTUs are intended to be top-of-the line, including high-efficiency fans and heat pump systems. The fans are variable speed, allowing the HP-RTUs to operate as single-zone variable air volume systems. The heat pumps are also variable speed, allowing for high part load performance. All schedules in the existing RTUs are transferred to the new HP-RTUs for consistency. Furthermore, any energy efficiency features in the existing baseline RTUs such as energy recovery or economizers are also transferred to the new HP-RTUs for consistency. This measure is applicable to approximately 45% of the ComStock floor area. The HP-RTU measure demonstrates 10.3% total site energy savings (449 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrocarbon polymeric binder for advanced solid propellant

Various experimental factors were examined to determine the source of difficulty in an isoprene polymerization in the 5-gallon reactor which gave a non-uniform product of low functionality. It was concluded that process improvements relating to initiator and monomer purity were desirable, but that the main difficulty was in the initiator feed system. A new pumping system was installed and an analog simulation of the reactor, feed system and initiator decomposition kinetics was devised which permits the selection of initial initiator concentrations and feed rates to use to give a nearly uniform initiator concentration throughout a polymerization run. An isoprene polymerization was run in which the process improvements were implemented.

Potts, J. E.↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of cryopumps on large space simulation systems

The need for clean, oil free space simulation systems has demanded the development of large, clean pumping systems. The assurance of optically dense liquid nitrogen baffles over diffusion pumps prevents backstreaming to a large extent, but does not preclude contamination from accidents or a control failure. Turbomolecular pumps or ion pumps achieve oil free systems but are only practical for relatively small chambers. Large cryopumps were developed and checked out which do achieve clean pumping of very large chambers. These pumps can be used as the original pumping system or can be retrofitted as a replacement for existing diffusion pumps.

Mccrary, L. E.↗

Discharge characteristics of a double injection-valve single-pump injection system

The discharge characteristics of two similar injection valves operated by a single-cylinder fuel-injection pump were determined with an apparatus that measured the quantity of fuel discharged from each valve during every 0.5 degrees of pump rotation. It was found that similar discharges took place from the two valves at all pump speeds when the valve-opening pressures, the nozzle-orifice diameters, and the injection-tube lengths were the same for both valves. Under these conditions, the effects of changing the pump speed, the pump throttle setting, or the nozzle orifice diameter were very similar to those occurring with a single-injection valve. By a proper selection of discharge-orifice areas and valve-opening pressures it was possible to obtain a great many combinations of discharge quantities, discharge rates, and injection timings for the two valves. A series of tests using injection tubes of unequal lengths for the two valves showed that under these conditions the injection timing and the fuel quantity discharged from each valve varies widely and erratically with changes in the pump speed.

Lee, Dana W↗

Assessing the Performance of Pump-and-Treat Systems - 16380

Pump-and-treat (P and T) is a common groundwater remedy. However, a challenge with P and T remedies has been in evaluating their performance. A structured approach can be applied to gathering the information needed to support assessment of P and T remedies and decisions to close the remedy, continue P and T, optimize the P and T system, or transition to other remedy approaches. Supportive decision elements include analysis of contaminant concentrations and trends, quantifying contaminant mass discharge of plume and source zone, quantifying the attenuation capacity of the aquifer, using tools to predict future plume behavior and time to reach remedial action objectives, and information about the current P and T system design and operations. Several sites have successfully conducted a P and T performance assessment and supported decisions to change their remedy approach. These case studies are discussed in relation to a recent document, Performance Assessment for Pump-and-Treat Closure or Transition, that provides guidance for the assessment process and associate remedy decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal Retrofit of Illinois National Guard's State headquarters Building

The goal of this project was to assess the feasibility of utilizing mine water as a heat sink for a geothermal heat pump system to heat and cool the 74,000 sq. ft. Illinois National Guard State Headquarters’ building in Springfield Illinois. If successful, this type of system would be less expensive to install than a traditional closed loop geothermal (ground source) heat pump system by significantly reducing the size of the well field, thus shortening or eliminate the payback period compared to a conventional system. In the end, a conventional ground loop was used for the project.

15 GEOTHERMAL ENERGY↗

A performance and closure evaluation approach for Pump-and-Treat systems - 15132

Pump-and-Treat (P and T) technology has been widely applied for groundwater remediation across many types of sites and for multiple types of contaminants. Decisions regarding major changes in the remediation approach are an important element of environmental remediation management for a site using P and T. An evaluation approach that includes an assessment of P and T system performance is under development to facilitate remediation decisions for P and T systems. The approach provides information on technical data and analyses that can be used to support remediation decisions. The document is organized to help decision makers distinguish between several categories of decision outcomes. These outcomes include 1) Initiate Remedy Closure, 2) Transition P and T to Monitored Natural Attenuation, 3) Continue P and T, 4) Supplement P and T with Another Treatment Technology, 5) Transition from P and T to Another Treatment Remedy, and 6) Transition P and T to an Alternative Closure or Contamination Management Approach. Key triggers that support selection of the appropriate outcome are provided, along with a description of suitable supporting data needed to formulate the technical basis for a remediation decision. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Eliminating Signal Bias Caused by Vacuum System Backstreaming in the Diagnostic Residual Gas Analyzer of ITER

In fusion neutral gas analysis, such as with the Diagnostic Residual Gas Analyzer (DRGA) for ITER, the primary measurement range of interest comprises the low-amu species (1 to 6), especially deuterium and helium. The challenge in successfully obtaining accurate measurements is two-fold. First, the sensitivity of the method must be sufficient to resolve trace amounts accurately; typically, one percent or less. Second, the gas signal from the fusion processes must be free of bias caused by the latent presence (from system outgassing and/or vacuum backstreaming) of these gases to enable accurate interpretation of the measured signal. This latter criterion can be problematic for the lightest gases since there is a propensity for some fraction of the pumped gas load to undergo a phenomenon known as backstreaming. This behavior is manifested in pumping systems for gas properties related to relative atomic weight (lightest) and size (smallest). Backstreaming results in a significant amount of the pumped gas undertaking a reverse flow and re-entering the measurement region; thus, contaminating the forward, real-time measurement. To fully eliminate this adverse effect, a conductance-limiting device – or orifice – has been installed in the high-vacuum pumping system of the present ITER DRGA prototype. The system was already equipped with a secondary turbomolecular pump (TMP), but with limited effectiveness against backstreaming in the inter-pump volume (IPV). This orifice is placed within the suction inlet coupling of the secondary TMP, which is downstream of the IPV. Its objective is to eliminate the backstreaming phenomenon by increasing the back pressure in the IPV. However, the orifice sizing must take into consideration other factors, such as the diagnostic measurement objectives. For example, in the ITER DRGA, one of the measurement requirements is a dynamic response time of ~1s. Fortunately, an added benefit of the pumping restriction created by the orifice is that the upstream pressure increase is beneficial for the DRGA’s optical gas analysis (OGA) sensors. These sensors are attached to the IPV in the present design. The glow discharges, when used as an OGA light source, will typically have a brighter light emission with increasing plasma cell pressure. In addition to the fusion machine research sector, there are other potential applications of this pumping technique where the monitoring of lighter gas concentrations is essential, such as the photolithography process for the semiconductor fabrication of integrated circuits. This presentation will describe the vacuum system used to demonstrate a process to eliminate backstreaming as well as show test results to verify the accomplishment of this critical objective.

Marcus, Chris↗

Deposition of novel nanocomposite films by a newly developed differential pumping co-sputtering system

A differential pumping co-sputtering system was developed to facilitate a controlled, but flexible fabrication of multifunctional nanocomposite films with compositions not limited by thermodynamic restrictions. This system features a multichamber design with a differential pumping system. Dividing atmospheres with this set up greatly reduced the cross-contamination between chambers, and each material could be co-deposited by rapid rotation of the substrate. The clearance between the substrate holder and the chamber was set at 1-2 mm, and the conductance of the clearance was examined roughly using conductance equations for typical types of orifices. It was found that the potential difference (PD) value of the clearance between the two chambers was less than 0.01; the gas flow between the two chambers through the clearance thus appears to be a practical molecular flow. The PD value, where P is a pressure (Pa) and D is a diameter of an orifice or a pipe (m), is a gas flow indicator or parameter obtained from an equation of Knudsen number. The changes in the oxygen partial pressure and glow discharge plasma in the left chamber were investigated using a process gas monitor (PGM) and optical emission spectroscope (OES) by introducing different gases to each chamber. The PGM results revealed that the cross-contamination of oxygen from the other chamber was suppressed to 10 {+-} 3% of the original. In addition, the OES measurement for glow discharge plasma did not detect substantial oxygen contamination from the other chamber. Using the newly developed system, an AlN/SiO{sub x} nanocomposite film consisting of B4-type AlN and amorphous SiO{sub x} was obtained successfully.

36 MATERIALS SCIENCE↗