Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box

The objective of this Technical Interchange Meeting was to increase the quantity and quality of technical, cost, and programmatic data used to model the impact of investing in different technologies. The focus of this meeting was the Technology Tool Box (TTB), a database of performance, operations, and programmatic parameters provided by technologists and used by systems engineers. The TTB is the data repository used by a system of models known as the Advanced Technology Lifecycle Analysis System (ATLAS). This report describes the result of the November meeting, and also provides background information on ATLAS and the TTB.

ONeil, D. A.↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

Supportability Issues and Approaches for Exploration Missions

Maintaining and repairing spacecraft systems hardware to achieve required levels of operational availability during long-duration exploration missions will be challenged by limited resupply opportunities, constraints on the mass and volume available for spares and other maintenance-related provisions, and extended communications times. These factors will force the adoption of new approaches to the integrated logistics support of spacecraft systems hardware. For missions beyond the Moon, all spares, equipment, and supplies must either be prepositioned prior to departure from Earth of human crews or carried with the crews. The mass and volume of spares must be minimized by enabling repair at the lowest hardware levels, imposing commonality and standardization across all mission elements at all hardware levels, and providing the capability to fabricate structural and mechanical spares as required. Long round-trip communications times will require increasing levels of autonomy by the crews for most operations including spacecraft maintenance. Effective implementation of these approaches will only be possible when their need is recognized at the earliest stages of the program, when they are incorporated in operational concepts and programmatic requirements, and when diligence is applied in enforcing these requirements throughout system design in an integrated way across all contractors and suppliers. These approaches will be essential for the success of missions to Mars. Although limited duration lunar missions may be successfully accomplished with more traditional approaches to supportability, those missions will offer an opportunity to refine these concepts, associated technologies, and programmatic implementation methodologies so that they can be most effectively applied to later missions.

Watson, J. K.↗

An Overview of the NASA FAP Hypersonics Project Airbreathing Propulsion Research

The propulsion research portfolio of the National Aeronautics and Space Administration Fundamental Aeronautics Program Hypersonics Project encompasses a significant number of technical tasks that are aligned to achieve mastery and intellectual stewardship of the core competencies in the hypersonic-flight regime. An overall coordinated programmatic and technical effort has been structured to advance the state-of-the-art, via both experimental and analytical efforts. A subset of the entire hypersonics propulsion research portfolio is presented in this overview paper. To this end, two programmatic research disciplines are discussed; namely, (1) the Propulsion Discipline, including three associated research elements: the X-51A partnership, the HIFiRE-2 partnership, and the Durable Combustor Rig, and (2) the Turbine-Based Combine Cycle Discipline, including three associated research elements: the Combined Cycle Engine Large Scale Inlet Mode Transition Experiment, the small-scale Inlet Mode Transition Experiment, and the High-Mach Fan Rig.

Auslender, A. H.↗

A Phobos-Deimos Mission as an Element of the NASA Mars Design Reference Architecture 5.0

NASA has conducted a series of mission studies over the past 25 years examining the eventual exploration of the surface of Mars by humans. The latest version of this evolutionary series of design reference missions/architectures - Design Reference Architecture 5 or DRA-5 - was completed in 2007. This paper examines the implications of including a human mission to explore the moons of Mars and teleoperate robots in various locations, but not to land the human crews on Mars, as an element of this reference architecture. Such a mission has been proposed several times during this same 25 year evolution leading up to the completion of DRA-5 primarily as a mission of testing the in-space vehicles and operations while surface vehicles and landers are under development. But such a precursor or test mission has never been explicitly included as an element of this Architecture. This paper will first summarize the key features of the DRA-5 to provide context for the remainder of the assessment. This will include a description of the in-space vehicles that would be the subject of a shakedown test during the Mars orbital mission. A decision tree will be used to illustrate the factors that will be analyzed, and the sequence in which they will be addressed, for this assessment. The factors that will be analyzed include the type of interplanetary transfer orbit (opposition class versus conjunction class), the type of parking orbit (circular versus elliptical), and the type of propulsion technology (high thrust chemical versus nuclear thermal rocket). The manner in which each of these factors impacts an individual mission will be described. In addition to the direct impact of these factors, additional considerations impacting crew health and overall programmatic outcomes will be discussed. Numerical results for each of the factors in the decision tree will be grouped with derived qualitative impacts from crew health and programmatic consideration. These quantitative and qualitative results will be summarized in a pros/cons table as a summary for this analysis.

Hoffman, Stephen J.↗

Why Atens Enjoy Enhanced Accessibility For Human Space Flight

In the context of human space flight (HSF), the concept of near-Earth object (NEO) accessibility is highly subjective. Whether or not a particular NEO is accessible critically depends on mass, performance, and reliability of interplanetary HSF systems yet to be designed. Such systems would certainly include propulsion and crew life support with adequate shielding from both solar flares and galactic cosmic radiation. Equally critical architecture options are relevant to NEO accessibility. These options are also far from being determined and include the number of launches supporting an HSF mission, together with whether or not consumables are to be pre-emplaced at the destination. Until the unknowns of HSF to NEOs come into clearer focus, the notion of relative accessibility is of great utility. Imagine a group of NEOs, each with nearly equal HSF merit determined from their individual characteristics relating to crew safety, scientific return, resource utilization, and planetary defense. The more accessible members of this group are more likely to be explored first. A highly accessible NEO could conceivably be deferred in favor of a less accessible HSF destination because the latter is more accessible during a programmatically desirable launch compliant mission trajectory solutions detected in association with a specific NEO. The known NEO population is then surveyed to illustrate in which regions of heliocentric semi-major axis, eccentricity, and inclination (a, e, i) space NEOs with large n values are mapped. The (a, e, i) mapping is also formatted such that membership in each of four NEO orbit classifications, as defined below, is evident. Amors have orbits everywhere superior to (outside of) Earth's. An Amor is therefore defined to have perihelion between 1.017 astronomical units (AU) and the maximum NEO value of 1.3 AU. As of 0 hrs Universal Time on 1 January 2011 (UT epoch 2011.0), Amors numbered 2855 in the Jet Propulsion Laboratory (JPL) Small-Body Database (SBDB), comprising 37.7% of known NEOs. Apollos have orbits crossing Earth's with periods greater than Earth's. An Apollo is therefore defined to have perihelion less than 1.017 AU and a greater than 1.0 AU. As of 2011.0 UT, Apollos numbered 4080 in the SBDB, comprising 53.9% of known NEOs. Atens have orbits crossing Earth's with periods less than Earth's. An Aten is therefore defined to have aphelion greater than 0.983 AU and a less than 1.0 AU. As of 2011.0 UT, Atens numbered 618 in the SBDB, comprising 8.2% of known NEOs. Atiras have orbits everywhere inferior to (inside of) Earth's. An Atira is therefore defined to have aphelion less than 0.983 AU. As of 2011.0 UT, Atiras numbered 11 in the SBDB, comprising 0.1% of known NEOs. It is no surprise that the largest n values are chiefly associated with Apollos and Atens. Because these orbits cross Earth's, distance to be covered in a given round trip mission time delta-t can be far less than is possible for Amors or Atiras . This delta-t or the sum of mission propulsive impulse magnitudes delta-v can more frequently be minimized to enhance NHATS compliance for Apollos and Atens than is generally the case for Amors and Atiras. A less intuitive trend in NHATS results is that Atens nearly outnumber the more numerous Apollos among the most compliant NEOs as measured by n. This trend is completely out of proportion to the degree Atens are represented among the known NEO population. A theory based on geocentric NEO dynamics is presented by this paper to explain why Atens enjoy inherently greater accessibility than do Apollos. Another trend evident from mapping into (a, e, i) space is the dearth of known NEOs at low e when a < 1 AU. Underrepresentation of Atens and Atiras in the NEO catalog is at least in part attributable to observing exclusively from a perspective near Earth. Generally inferior Aten and Atira orbits are rarely, if ever, in Earth's night sky. Until a comprehensive NEO survey is conducted from an appropriateegion remote from Earth, the theory developed in this paper indicates a substantial fraction of the most accessible NEOs will remain unknown. season. Such a season is really yet another undetermined HSF architecture option. A launch season's duration will likely be measured in weeks, and it will be utilized at an indeterminate point almost certainly more than a decade in the future when HSF programmatic maturity is sufficient. Furthermore, current knowledge of the NEO population relevant to HSF is far from complete. In the 100-m-diameter class of greatest interest, only a few percent of the estimated NEO population is known [2, Figure 2.4]. Therefore, any known, lost, or fictitious NEO in a highly accessible orbit is a potential HSF destination of merit. Even if lost, fictitious, small, or hazardous, such a potential target (or another in a similar orbit) may ultimately prove to be an early HSF destination when the pertinent NEO population is more thoroughly catalogued and NEO orbits are more thoroughly maintained at high accuracy. This paper first reviews methodology and pertinent results from NASA-sponsored research performed in late 2010 and dubbed NEO HSF Accessible Targets Study (NHATS, pronounced as "gnats"). A useful accessibility metric developed during this study is n, the tally of NHATS-

Barbee, Brent↗

Human Exploration Framework Team: Strategy and Status

Human Exploration Framework Team (HEFT) was formulated to create a decision framework for human space exploration that drives out the knowledge, capabilities and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way. The specific goal is to generate an initial architecture that can evolve into a long term, enterprise-wide architecture that is the basis for a robust human space flight enterprise. This paper will discuss the initial HEFT activity which focused on starting up the cross-agency team, getting it functioning, developing a comprehensive development and analysis process and conducting multiple iterations of the process. The outcome of this process will be discussed including initial analysis of capabilities and missions for at least two decades, keeping Mars as the ultimate destination. Details are provided on strategies that span a broad technical and programmatic trade space, are analyzed against design reference missions and evaluated against a broad set of figures of merit including affordability, operational complexity, and technical and programmatic risk.

High Earth Orbit (HEO),↗

History of Space Shuttle Rendezvous

This technical history is intended to provide a technical audience with an introduction to the rendezvous and proximity operations history of the Space Shuttle Program. It details the programmatic constraints and technical challenges encountered during shuttle development in the 1970s and over thirty years of shuttle missions. An overview of rendezvous and proximity operations on many shuttle missions is provided, as well as how some shuttle rendezvous and proximity operations systems and flight techniques evolved to meet new programmatic objectives. This revised edition provides additional information on Mercury, Gemini, Apollo, Skylab, and Apollo/Soyuz. Some chapters on the Space Shuttle have been updated and expanded. Four special focus chapters have been added to provide more detailed information on shuttle rendezvous. A chapter on the STS-39 mission of April/May 1991 describes the most complex deploy/retrieve mission flown by the shuttle. Another chapter focuses on the Hubble Space Telescope servicing missions. A third chapter gives the reader a detailed look at the February 2010 STS-130 mission to the International Space Station. The fourth chapter answers the question why rendezvous was not completely automated on the Gemini, Apollo, and Space Shuttle vehicles.

Goodman, John L.↗

APEX-CAMBIUM: A Case Study in Advantages and Challenges of International Cooperation for the International Space Station

It is generally agreed that space science benefits from an international collaboration. There are different mechanisms to make this happen but to recognize opportunities requires a keen awareness of the activities, people and respective strengths. Apex- Cambium is a joint Canadian Space Agency (CSA)-National Aeronautics and Space Administration (NASA) initiative. It was made possible in large part through the good relations and shared willingness to meet a common objective, that of doing exciting science in space. The actual mechanics of bringing an international project together can be divided into two perspectives: programmatic and implementation. The programmatic component includes recognizing complementarities, bringing science together, and the need to have Agencies approve and accept joint responsibility for the mission. The implementation component involves working to define science requirements, available resources and assigning individual responsibilities while keeping the overall success criteria as a collective objective. The APEX-CAMB11.JM mission will be described from the point of view of both CSA and NASA. Suggestions on how to facilitate these types of initiatives will be provided and highlights of the APEX-Cambium collaboration will be provided.

Cox, David↗

JCL Implementation On A Human Spaceflight Program

Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

Kulpa, Vyga↗

Technology Development Roadmap: A Technology Development Roadmap for a Future Gravitational Wave Mission

Humankind will detect the first gravitational wave (GW) signals from the Universe in the current decade using ground-based detectors. But the richest trove of astrophysical information lies at lower frequencies in the spectrum only accessible from space. Signals are expected from merging massive black holes throughout cosmic history, from compact stellar remnants orbiting central galactic engines from thousands of close contact binary systems in the Milky Way, and possibly from exotic sources, some not yet imagined. These signals carry essential information not available from electromagnetic observations, and which can be extracted with extraordinary accuracy. For 20 years, NASA, the European Space Agency (ESA), and an international research community have put considerable effort into developing concepts and technologies for a GW mission. Both the 2000 and 2010 decadal surveys endorsed the science and mission concept of the Laser Interferometer Space Antenna (LISA). A partnership of the two agencies defined and analyzed the concept for a decade. The agencies partnered on LISA Pathfinder (LPF), and ESA-led technology demonstration mission, now preparing for a 2015 launch. Extensive technology development has been carried out on the ground. Currently, the evolved Laser Interferometer Space Antenna (eLISA) concept, a LISA-like concept with only two measurement arms, is competing for ESA's L2 opportunity. NASA's Astrophysics Division seeks to be a junior partner if eLISA is selected. If eLISA is not selected, then a LISA-like mission will be a strong contender in the 2020 decadal survey. This Technology Development Roadmap (TDR) builds on the LISA concept development, the LPF technology development, and the U.S. and European ground-based technology development. The eLISA architecture and the architecture of the Mid-sized Space-based Gravitational-wave Observatory (SGO Mid)-a competitive design with three measurement arms from the recent design study for a NASA-led mission after 2020-both use the same technologies. Further, NASA participation in an ESA-led mission would likely augment the eLISA architecture with a third arm to become the SGO Mid architecture. For these reasons, this TDR for a future GW mission applies to both designs and both programmatic paths forward. It is adaptable to the different timelines and roles for an ESA-led or a NASA-led mission, and it is adaptable to available resources. Based on a mature understanding of the interaction between technology and risk, the authors of this TDR have chosen a set of objectives that are more expansive than is usual. The objectives for this roadmap are: (1) reduce technical and development risks and costs; (2) understand and, where possible, relieve system requirements and consequences; (3) increase technical insight into critical technologies; and (4) validate the design at the subsystem level. The emphasis on these objectives, particularly the latter two, is driven by outstanding programmatic decisions, namely whether a future GW mission is ESA-led or NASA-led, and availability of resources. The relative emphasis is best understood in the context of prioritization.

Laser Interferometry Space Antenna↗

Quantitative Risk Modeling of Fire on the International Space Station

The International Space Station (ISS) Program has worked to prevent fire events and to mitigate their impacts should they occur. Hardware is designed to reduce sources of ignition, oxygen systems are designed to control leaking, flammable materials are prevented from flying to ISS whenever possible, the crew is trained in fire response, and fire response equipment improvements are sought out and funded. Fire prevention and mitigation are a top ISS Program priority - however, programmatic resources are limited; thus, risk trades are made to ensure an adequate level of safety is maintained onboard the ISS. In support of these risk trades, the ISS Probabilistic Risk Assessment (PRA) team has modeled the likelihood of fire occurring in the ISS pressurized cabin, a phenomenological event that has never before been probabilistically modeled in a microgravity environment. This paper will discuss the genesis of the ISS PRA fire model, its enhancement in collaboration with fire experts, and the results which have informed ISS programmatic decisions and will continue to be used throughout the life of the program.

Castillo, Theresa↗

Toward Large-Area Sub-Arcsecond X-Ray Telescopes

The future of x-ray astronomy depends upon development of x-ray telescopes with larger aperture areas (approx. = 3 square meters) and fine angular resolution (approx. = 1 inch). Combined with the special requirements of nested grazing-incidence optics, the mass and envelope constraints of space-borne telescopes render such advances technologically and programmatically challenging. Achieving this goal will require precision fabrication, alignment, mounting, and assembly of large areas (approx. = 600 square meters) of lightweight (approx. = 1 kilogram/square meter areal density) high-quality mirrors at an acceptable cost (approx. = 1 million dollars/square meter of mirror surface area). This paper reviews relevant technological and programmatic issues, as well as possible approaches for addressing these issues-including active (in-space adjustable) alignment and figure correction.

ODell, Stephen L.↗

Exploring Life Support Architectures for Evolution of Deep Space Human Exploration

Life support system architectures for long duration space missions are often explored analytically in the human spaceflight community to find optimum solutions for mass, performance, and reliability. But in reality, many other constraints can guide the design when the life support system is examined within the context of an overall vehicle, as well as specific programmatic goals and needs. Between the end of the Constellation program and the development of the "Evolvable Mars Campaign", NASA explored a broad range of mission possibilities. Most of these missions will never be implemented but the lessons learned during these concept development phases may color and guide future analytical studies and eventual life support system architectures. This paper discusses several iterations of design studies from the life support system perspective to examine which requirements and assumptions, programmatic needs, or interfaces drive design. When doing early concept studies, many assumptions have to be made about technology and operations. Data can be pulled from a variety of sources depending on the study needs, including parametric models, historical data, new technologies, and even predictive analysis. In the end, assumptions must be made in the face of uncertainty. Some of these may introduce more risk as to whether the solution for the conceptual design study will still work when designs mature and data becomes available.

Anderson, Molly↗

Exploring Life Support Architectures for Evolution of Deep Space Human Exploration

Life support system architectures for long duration space missions are often explored analytically in the human spaceflight community to find optimum solutions for mass, performance, and reliability. But in reality, many other constraints can guide the design when the life support system is examined within the context of an overall vehicle, as well as specific programmatic goals and needs. Between the end of the Constellation program and the development of the "Evolvable Mars Campaign", NASA explored a broad range of mission possibilities. Most of these missions will never be implemented but the lessons learned during these concept development phases may color and guide future analytical studies and eventual life support system architectures. This paper discusses several iterations of design studies from the life support system perspective to examine which requirements and assumptions, programmatic needs, or interfaces drive design. When doing early concept studies, many assumptions have to be made about technology and operations. Data can be pulled from a variety of sources depending on the study needs, including parametric models, historical data, new technologies, and even predictive analysis. In the end, assumptions must be made in the face of uncertainty. Some of these may introduce more risk as to whether the solution for the conceptual design study will still work when designs mature and data becomes available.

Anderson, Molly S.↗

The NASA Commercial Crew Program (CCP) Mission Assurance Process

In 2010, NASA established the Commercial Crew Program in order to provide human access to the International Space Station and low earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine the commercial providers transportation system complies with Programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted Hazard Reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100 percent of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (SMA) model does not support the nature of the Commercial Crew Program. To that end, NASA SMA is implementing a Risk Based Assurance (RBA) process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications. This paper will describe the evolution of the CCP Mission Assurance process from the beginning of the Program to its current incarnation. Topics to be covered include a short history of the CCP; the development of the Programmatic mission assurance requirements; the current safety review process; a description of the RBA process and its products and ending with a description of the Shared Assurance Model.

Commercial Crew Program↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗