Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program ordering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants: Model-Predictive Control Library Development (Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a model predictive control (MPC) library for implementing MPC for a general dynamic system. The library is implemented in a standardized manner in Matlab/Simulink, where core functions on model prediction, linearization and formulation and solution of a quadratic programming (QP) optimization problem is done in the core library - independent of the specific application. The user can provide the application-specific dynamic model in continuous and discrete time, to rapidly implement and test the MPC performance in a desktop simulation. The MPC optimization objective and constraints are also easily configured via an Excel file to allow iterative refinement as needed. Finally, the MPC library enables a rapid deployment to a target environment through auto C-code generation and containerization. The MPC library works seamlessly with the model based estimation (MBE) library to obtain the overall output feedback control solution. In this program, the reduced order model (ROM) of a coal-fired power plant (CFPP) is used to implement and test the MPC solution.

01 COAL, LIGNITE, AND PEAT↗

Utilizing Genetic Programming to Identify Failures in ICS Networks

Previously, researchers have attempted to apply machine learning techniques to network anomaly detection problems. Due to the staggering amount of variety that can occur in normal networks, the results have often been underwhelming. These challenges are far less pronounced when considering industrial control system (ICS) networks. The recurrent nature of these networks results in less noise and more consistent patterns for a machine learning algorithm to recognize. Here, we propose a method of evolving decision trees through genetic programming (GP) in order to detect network anomalies, such as device outages. Our approach extracts over a dozen features from network packet captures and netflows, normalizes them, and relates them in decision trees using fuzzy logic operators. Furthermore, the trees were used to detect three specific network events from three different points on the network across a statistically significant number of runs and achieved 100% accuracy on five of the nine experiments. When the trees attempted to detect more challenging events at points of presence further from the occurrence, the accuracy averaged to above 98%. Finally, using our method, all of the evolutionary cycles of the GP algorithm are computed a-priori, allowing the best resultant trees to be deployed as semi-real-time sensors with little overhead.

97 MATHEMATICS AND COMPUTING↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Second Opinion is Worth the Cost - 12479

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Benefits of Safeguards by Design

The overarching driver for developing a formalized process to achieve safeguards by design is to support the global growth of nuclear power while reducing ‘nuclear security’ risks. This paper discusses an institutional approach to the design process for a nuclear facility, for designing proliferation resistance, international safeguards and U.S. national safeguards and security into new nuclear facilities. In the United States, the need exists to develop a simple, concise, formalized, and integrated approach for incorporating international safeguards and other non-proliferation considerations into the facility design process. An effective and efficient design process is one which clearly defines the functional requirements at the beginning of the project and provides for the execution of the project to achieve a reasonable balance among competing objectives in a cost effective manner. Safeguards by Design is defined as “the integration of international and national safeguards, physical security and non-proliferation features as full and equal partners in the design process of a nuclear energy system or facility,” with the objective to achieve facilities that are intrinsically more robust while being less expensive to safeguard and protect. This Safeguards by Design process has been developed such that it: • Provides improved safeguards, security, and stronger proliferation barriers, while reducing the life cycle costs to the operator and regulatory agencies, • Can be translated to any international context as a model for nuclear facility design, • Fosters a culture change to ensure the treatment of ‘nuclear security’ considerations as “full and equal” partners in the design process, • Provides a useful tool for the project manager responsible for the design, construction, and start-up of nuclear facilities, and • Addresses the key integration activities necessary to efficiently incorporate International Atomic Energy Agency safeguards into the design of nuclear facilities. This paper describes the work that has been completed in the development of a Safeguards by Design process for a project, illustrated by flow diagrams based upon the project phases described in U.S. Department of Energy Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. The institutionalization of the Safeguards by Design process directly supports the goals of the Next Generation Safeguards Initiative and also aligns with goals and objectives of the International Atomic Energy Agency. Other benefits from institutionalizing this Safeguards by Design process are discussed within this paper.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Understanding how defects and dopant atoms in copper surface oxides affect reactivity

Copper and its oxides are key catalytic materials, on which reactions often occur at the metal/oxide interface. Here, in this work, we directly connect the induction period observed during methanol-driven reduction of thin-film copper oxides to their atomic-scale structural order. Using temperature-programmed desorption (TPD) methanol titrations combined with scanning tunneling microscopy, we show that highly ordered oxide phases – particularly the “29” structure with its low defect density – exhibit long induction periods and initially low reactivity. The induction period, defined as the number of methanol TPD cycles required to reach half of the maximum formaldehyde yield, scales with oxide order and oxygen coverage. Enhanced reactivity of well-ordered oxides emerges only after repeated methanol adsorption/desorption cycles generate oxygen vacancies and new Cu(111)/Cu x O interfacial sites. In contrast, disordered or sub-stoichiometric oxides, which contain more intrinsic defects and interfaces, are active from the first TPD cycle. We further examine how dilute Pt and Rh dopants influence oxide order and reactivity: 1% Pt increases defect density and catalytic activity, while 1% Rh promotes oxide ordering and longer induction periods. These findings demonstrate that dilute alloying provides a potential method for tuning the structure and reactivity of Cu(111)/Cu x O interfaces.

Cu(111)Methanol oxidation↗

Ordering Traces Logically to Identify Lateness in Message Passing Programs

Event traces are valuable for understanding the behavior of parallel programs. However, automatically analyzing a large parallel trace is difficult, especially without a specific objective. We aid this endeavor by extracting a trace's logical structure, an ordering of trace events derived from happened-before relationships, while taking into account developer intent. Using this structure, we can calculate an operation's delay relative to its peers on other processes. The logical structure also serves as a platform for comparing and clustering processes as well as highlighting communication patterns in a trace visualization. We present an algorithm for determining this idealized logical structure from traces of message passing programs, and we develop metrics to quantify delays and differences among processes. We implement our techniques in Ravel, a parallel trace visualization tool that displays both logical and physical timelines. Rather than showing the duration of each operation, we display where delays begin and end, and how they propagate. As a result, we apply our approach to the traces of several message passing applications, demonstrating the accuracy of our extracted structure and its utility in analyzing these codes.

97 MATHEMATICS AND COMPUTING↗

Methodology for Determining Radiation Portal Monitor Availability from Daily Files

The Second Line of Defense (SLD) Program works with partner countries to enhance their capabilities in deterring, detecting, and interdicting the illicit trafficking of nuclear and radiological materials through international borders by providing radiation detection equipment and related training. With agreement from SLD partner countries, the program collects daily file data from installed TSA Systems pedestrian, conveyor, vehicle, and rail radiation portal monitors (RPMs).1 Analysis of the data can provide information related to the state of health and configuration of the radiation monitoring equipment. By analyzing this data from the field over long periods of time, the program is able to determine valuable information such as the general reliability of the deployed equipment. In order to characterize the program’s overall effectiveness, data from daily files is used to determine the availability of RPMs that submit daily files to Oak Ridge National Laboratory (ORNL). Availability in this context is the proportion of time the RPM is in a functioning condition. The RPM is available when all the components of the system are functioning properly, thereby allowing the proper functioning of the RPM as a whole. This document explains the methodology and assumptions used to arrive at an availability metric for the RPMs from which ORNL receives data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Waste Isolation Pilot Plant Environmental Monitoring Plan

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of One-Sided and Two-Sided Communication Paradigms on Relaxed-Ordering Interconnect

The Cray Gemini interconnect hardware provides multiple transfer mechanisms and out-of-order message delivery to improve communication throughput. In this paper we quantify the performance of one-sided and two-sided communication paradigms with respect to: 1) the optimal available hardware transfer mechanism, 2) message ordering constraints, 3) per node and per core message concurrency. In addition to using Cray native communication APIs, we use UPC and MPI micro-benchmarks to capture one- and two-sided semantics respectively. Our results indicate that relaxing the message delivery order can improve performance up to 4.6x when compared with strict ordering. When hardware allows it, high-level one-sided programming models can already take advantage of message reordering. Enforcing the ordering semantics of two-sided communication comes with a performance penalty. Furthermore, we argue that exposing out-of-order delivery at the application level is required for the next-generation programming models. Any ordering constraints in the language specifications reduce communication performance for small messages and increase the number of active cores required for peak throughput.

97 MATHEMATICS AND COMPUTING↗

Efficient On-demand Connection Management Mechanisms with PGAS Models on InfiniBand

In the last decade or so, clusters have observed a tremendous rise in popularity due to the excellent price to performance ratio. A variety of Interconnects have been proposed during this period, with InfiniBand leading the way due to its high performance and open standard. At the same time, multiple programming models have emerged in order to meet the requirements of various applications and their programming models. To support requirements of multiple programming models, InfiniBand provides multiple transport semantics, ranging from unreliable connectionless to reliable connected characteristics. Among them, the reliable connection (RC) semantics is being widely due to its high performance and support for novel features like Remote Direct Memory Acesss (RDMA), hardware atomics and Network Fault Tolerance. However, the pairwise connection oriented nature of the RC transport semantics limits its scalability and usage at the increasing processor counts. In this paper, we design and implement on-demand connection management approaches in the context of Partitioned Global Address Space (PGAS) programming models, which provided shared memory abstraction and one-sided communication semantics, leading to the development of multiple languages (UPC, X10, Chapel) and libraries (Global Arrays, MPI-RMA). Using Global Arrays as the research vehicle, we implement this approach with Aggregate Remote Memory Copy Interface (ARMCI), the runtime system of Global Arrays. We evaluate our approach, ARMCI-On Demand Connection Management (ARMCI-ODCM) using various microbenchmarks and benchmarks (LU Factorization, RandomAccess and Lennard Jones simulation) and application (Subsurface transport over multiple phases (STOMP)). With the performance evaluation for up to 4096 processors, we are able to have a multi-fold reduction in connection memory with a negligible degradation in performance. Using STOMP at 4096 processors, reduces the overall connection memory by 66 times with no performance degradation. To the best of our knowledge, this is the first design, implementation and evaluation of on-demand connection management with InfiniBand using PGAS models.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 2)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Environmental Monitoring Plan (Rev. 1)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 3)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

SU-B-213-01: Introduction

The North American medical physics community validates the education received by medical physicists and the clinical qualifications for medical physicists through accreditation of educational programs and certification of medical physicists. Medical physics educational programs (graduate education and residency education) are accredited by the Commission on Accreditation of Medical Physics Education Programs (CAMPEP), whereas medical physicists are certified by several organizations, the most familiar of which is the American Board of Radiology (ABR). In order for an educational program to become accredited or a medical physicist to become certified, the applicant must meet certain specified standards set by the appropriate organization. In this Symposium, representatives from both CAMPEP and the ABR will describe the process by which standards are established as well as the process by which qualifications of candidates for accreditation or certification are shown to be compliant with these standards. The Symposium will conclude with a panel discussion. Learning Objectives: Recognize the difference between accreditation of an educational program and certification of an individual Identify the two organizations primarily responsible for these tasks Describe the development of educational standards Describe the process by which examination questions are developed GS is Executive Secretary of CAMPEP.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-B-213-00: Education Council Symposium: Accreditation and Certification: Establishing Educational Standards and Evaluating Candidates Based on these Standards

The North American medical physics community validates the education received by medical physicists and the clinical qualifications for medical physicists through accreditation of educational programs and certification of medical physicists. Medical physics educational programs (graduate education and residency education) are accredited by the Commission on Accreditation of Medical Physics Education Programs (CAMPEP), whereas medical physicists are certified by several organizations, the most familiar of which is the American Board of Radiology (ABR). In order for an educational program to become accredited or a medical physicist to become certified, the applicant must meet certain specified standards set by the appropriate organization. In this Symposium, representatives from both CAMPEP and the ABR will describe the process by which standards are established as well as the process by which qualifications of candidates for accreditation or certification are shown to be compliant with these standards. The Symposium will conclude with a panel discussion. Learning Objectives: Recognize the difference between accreditation of an educational program and certification of an individual Identify the two organizations primarily responsible for these tasks Describe the development of educational standards Describe the process by which examination questions are developed GS is Executive Secretary of CAMPEP.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-B-213-02: Development of CAMPEP Standards

The North American medical physics community validates the education received by medical physicists and the clinical qualifications for medical physicists through accreditation of educational programs and certification of medical physicists. Medical physics educational programs (graduate education and residency education) are accredited by the Commission on Accreditation of Medical Physics Education Programs (CAMPEP), whereas medical physicists are certified by several organizations, the most familiar of which is the American Board of Radiology (ABR). In order for an educational program to become accredited or a medical physicist to become certified, the applicant must meet certain specified standards set by the appropriate organization. In this Symposium, representatives from both CAMPEP and the ABR will describe the process by which standards are established as well as the process by which qualifications of candidates for accreditation or certification are shown to be compliant with these standards. The Symposium will conclude with a panel discussion. Learning Objectives: Recognize the difference between accreditation of an educational program and certification of an individual Identify the two organizations primarily responsible for these tasks Describe the development of educational standards Describe the process by which examination questions are developed GS is Executive Secretary of CAMPEP.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-B-213-03: Evaluation of Graduate Programs

The North American medical physics community validates the education received by medical physicists and the clinical qualifications for medical physicists through accreditation of educational programs and certification of medical physicists. Medical physics educational programs (graduate education and residency education) are accredited by the Commission on Accreditation of Medical Physics Education Programs (CAMPEP), whereas medical physicists are certified by several organizations, the most familiar of which is the American Board of Radiology (ABR). In order for an educational program to become accredited or a medical physicist to become certified, the applicant must meet certain specified standards set by the appropriate organization. In this Symposium, representatives from both CAMPEP and the ABR will describe the process by which standards are established as well as the process by which qualifications of candidates for accreditation or certification are shown to be compliant with these standards. The Symposium will conclude with a panel discussion. Learning Objectives: Recognize the difference between accreditation of an educational program and certification of an individual Identify the two organizations primarily responsible for these tasks Describe the development of educational standards Describe the process by which examination questions are developed GS is Executive Secretary of CAMPEP.

61 RADIATION PROTECTION AND DOSIMETRY↗