Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plug load control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

165 records · Page 10

Well-to-wheels energy use and greenhouse gas emissions analysis of plug-in hybrid electric vehicles.

Researchers at Argonne National Laboratory expanded the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model and incorporated the fuel economy and electricity use of alternative fuel/vehicle systems simulated by the Powertrain System Analysis Toolkit (PSAT) to conduct a well-to-wheels (WTW) analysis of energy use and greenhouse gas (GHG) emissions of plug-in hybrid electric vehicles (PHEVs). The WTW results were separately calculated for the blended charge-depleting (CD) and charge-sustaining (CS) modes of PHEV operation and then combined by using a weighting factor that represented the CD vehicle-miles-traveled (VMT) share. As indicated by PSAT simulations of the CD operation, grid electricity accounted for a share of the vehicle's total energy use, ranging from 6% for a PHEV 10 to 24% for a PHEV 40, based on CD VMT shares of 23% and 63%, respectively. In addition to the PHEV's fuel economy and type of on-board fuel, the marginal electricity generation mix used to charge the vehicle impacted the WTW results, especially GHG emissions. Three North American Electric Reliability Corporation regions (4, 6, and 13) were selected for this analysis, because they encompassed large metropolitan areas (Illinois, New York, and California, respectively) and provided a significant variation of marginal generation mixes. The WTW results were also reported for the U.S. generation mix and renewable electricity to examine cases of average and clean mixes, respectively. For an all-electric range (AER) between 10 mi and 40 mi, PHEVs that employed petroleum fuels (gasoline and diesel), a blend of 85% ethanol and 15% gasoline (E85), and hydrogen were shown to offer a 40-60%, 70-90%, and more than 90% reduction in petroleum energy use and a 30-60%, 40-80%, and 10-100% reduction in GHG emissions, respectively, relative to an internal combustion engine vehicle that used gasoline. The spread of WTW GHG emissions among the different fuel production technologies and grid generation mixes was wider than the spread of petroleum energy use, mainly due to the diverse fuel production technologies and feedstock sources for the fuels considered in this analysis. The PHEVs offered reductions in petroleum energy use as compared with regular hybrid electric vehicles (HEVs). More petroleum energy savings were realized as the AER increased, except when the marginal grid mix was dominated by oil-fired power generation. Similarly, more GHG emissions reductions were realized at higher AERs, except when the marginal grid generation mix was dominated by oil or coal. Electricity from renewable sources realized the largest reductions in petroleum energy use and GHG emissions for all PHEVs as the AER increased. The PHEVs that employ biomass-based fuels (e.g., biomass-E85 and -hydrogen) may not realize GHG emissions benefits over regular HEVs if the marginal generation mix is dominated by fossil sources. Uncertainties are associated with the adopted PHEV fuel consumption and marginal generation mix simulation results, which impact the WTW results and require further research. More disaggregate marginal generation data within control areas (where the actual dispatching occurs) and an improved dispatch modeling are needed to accurately assess the impact of PHEV electrification. The market penetration of the PHEVs, their total electric load, and their role as complements rather than replacements of regular HEVs are also uncertain. The effects of the number of daily charges, the time of charging, and the charging capacity have not been evaluated in this study. A more robust analysis of the VMT share of the CD operation is also needed.

01 COAL, LIGNITE, AND PEAT↗

Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase (Final Scientific/Technical Report)

The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperature compensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations, and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and showcase events include San Antonio and Austin, Texas. In summary, the project objectives were achieved in the following ways: Through presentations and papers provided to a variety of audiences in multiple venues, the project team fulfilled its goal of providing education and outreach on hydrogen technology to statewide audiences. The project team generated interest that exists well beyond the completion of the project, and indeed, helped to generate financial support for a subsequent hydrogen vehicle project in Austin. The University of Texas, Center for ElectroMechanics operated the fuel cell-electric Ebus vehicle for over 13,000 miles in Austin, Texas in a variety of routes and loading configurations. The project took advantage of prior efforts that created a hydrogen fueling station and fuel cell electric-hybrid bus and continued to verify their technical foundation, while informing and educating potential future users of how these technologies work.

03 NATURAL GAS↗

A Study Of Geological Disposal Facility (GDF) Ageing Phenomena In Bentonite - 17605

Since the 1950's, the UK's nuclear activity in energy, defence and medicine has led to the accumulation of a large amount of higher activity radioactive waste (HAW). Most of nuclear waste arises in a wide variety of physical and chemical forms with different radioisotopes and loadings. Due to complexity in HAW, it is imperative that there be a rigorous management system that ensures population and environmental safety over extended periods. The concept of Deep Geological Disposal of waste in a stable geological formation is, nowadays, an internationally accepted solution as the surest and the most viable long term method for management. Any future Geological Disposal Facility (GDF) will comprise, among other artificial and natural engineered barriers, a barrier immediately around the waste containers compounded by a sealing material. The long-term stability of a GDF will be determined by the design and construction of the engineered barriers, and the mechanical, hydraulic and geochemical interactions that may happen between the different engineered components as a result of combined processes such as the heat produced by radioactive decay and the ion water composition of the surrounding host rock. Bentonite clay has been selected as the most promising buffer and backfill material in many disposal programmes because of its swelling capacity, low permeability, plasticity and cation exchange capacity. In the nuclear scope, bentonite testing at different scale-lengths (laboratory and field scale) has been performed and implemented in order to examine the thermo-hydro-mechanical (THM) and thermo-hydro-geochemical (THG) processes that may happen in the engineered barriers and geological settings associated with a GDF. Two major European field scale tests have been performed to better understand bentonite performance and behaviour immediately after HAW emplacements. The Full-Scale Engineered Barriers Experiment (FEBEX) at the Grimsel Test Sit (Switzerland) and the Alternative Buffer Material (ABM) Project at the Aespoe Hard Rock Laboratory (Sweden). The Febex Experiment was a pilot project designed for 'field research' of HAW repository hosted in crystalline rock where surrogate HAW canisters were placed horizontally in drifts, surrounded by compacted blocks of bentonite, sealed by a concrete plug and maintaining a constant canister surface temperature of 100 deg. C. After five years of operation, a partial dismantling was carried out in 2002. Heater processes occurring in the surrounding bentonite. The dismantling of the heater no. 2 (after 18 years of operation) started in late 2014 and is planned to be finished at the end of 2016 (termed FEBEX-DP). The FEBEX Project utilised bentonite from the Cortijo de Archidona deposit (Almeria, Spain). This 'Febex' bentonite is sourced from calcium-magnesium montmorillonite with good properties in relation to swelling capacity, permeability, adsorption capacity, and thermal conductivity. The ABM Project is a large-scale programme that has been running since 2006. The programme is designed to study a suite of possible buffer materials and correlate the physical and chemical properties of eleven different types of bentonites to their fundamental mineralogical properties. The ABM test consists in three 'packages' containing a central heater tube surrounded by different pre-compacted bentonite blocks and instrumentation. Each 'package' was installed in separate boreholes. The target temperature for the surface of the heated tubes in contact with the bentonite was 130 deg. C. Both FEBEX and ABM test the bentonite was saturated with water percolating from surrounding host rock (FEBEX and ABM) and also via artificial supply systems (ABM), being the water itself acting as a long term corrosion agent. For both experiments and emerging interest is in the interaction of bentonite with metallic components, under geological disposal conditions are not considered to be thermodynamically stable and hence arising corrosion products could interact with the buffer. These interactions depend on various factors such as the redox potential, temperature, pH, solute concentration and buffer material characteristics. During the operational phases of the FEBEX and ABM and after its 'closure' a significant volume of air was found to be retained in the bentonite. Under these conditions a period of initial aerobic corrosion by the air in the bentonite barrier would have occurred followed by establishment of anaerobic corrosion would be the dominant process ongoing. The anaerobic corrosion began when the bentonite became water saturated. Under these conditions, the water acted as the major oxidant. The present project focuses on the characterization of samples arising from the FEBEX and ABM Projects as well as performing additional independent experiments designed to complement these prior studies. Characterization will focus mainly on corrosion related alteration combined with thermal effects. Through detailed sample characterization, the intention is to achieve a greater knowledge regarding the changes to the bentonite under the experimental conditions to which it was exposed, and plausible alterations in its THM and THG properties occurring during the experiment due to blended effects of temperature,water content, engineering structural components and solutes are also to be measured. The fulfilment of a large-scale 'in-situ' test is intricate, time-consuming and with an abundance of external variables that are not always well controlled. For this reason, the University of Bristol is performing a series of well constrained time-resolved laboratory tests which bentonite is being subjected to different possible scenarios that may happen whilst in a HAW repository. In virtue of this experiment, the UoB aims to understand the illitisation and cementation process and their effects on bentonite safety properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗