Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Development of an expert planning system for OSSA

This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

Groundwater, B.↗

Agent independent task planning

Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

Davis, William S.↗

A distributed planning concept for Space Station payload operations

The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

Hagopian, Jeff↗

Planning in the Continuous Operations Environment of the International Space Station

The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

Maxwell, Theresa↗

Introduction of International Microgravity Strategic Planning Group

Established in May 6, 1995, the purpose of this International Strategic Planning Group for Microgravity Science and Applications Research is to develop and update, at least on a biennial basis, an International Strategic Plan for Microgravity Science and Applications Research. The member space agencies have agreed to contribute to the development of a Strategic Plan, and seek the implementation of the cooperative programs defined in this Plan. The emphasis of this plan is the coordination of hardware construction and utilization within the various areas of research including biotechnology, combustion science, fluid physics, materials science and other special topics in physical sciences. The Microgravity Science and Applications International Strategic Plan is a joint effort by the present members - ASI, CNES, CSA, DLR, ESA, NASA, and NASDA. It represents the consensus from a series of discussions held within the International Microgravity Strategic Planning Group (IMSPG). In 1996 several space agencies initiated multilateral discussions on how to improve the effectiveness of international microgravity research during the upcoming Space Station era. These discussions led to a recognition of the need for a comprehensive strategic plan for international microgravity research that would provide a framework for cooperation between international agencies. The Strategic Plan is intended to provide a basis for inter-agency coordination and cooperation in microgravity research in the environment of the International Space Station (ISS) era. This will be accomplished through analysis of the interests and goals of each participating agency and identification of mutual interests and program compatibilities. The Plan provides a framework for maximizing the productivity of space-based research for the benefit of our societies.

Rhome, Robert↗

Cassini's Grand Finale: A Mission Planning Retrospective

On September 15, 2017, Cassini plunged deep into Saturn, down to where the atmosphere was sufficiently dense to destroy the spacecraft, making it part of Saturn forever. In the five months leading up to its destruction, Cassini flew between Saturn and its rings 22 times, collecting data from the never before-explored region of the Kronian system. These orbits, the Grand Finale of Cassini, were the culmination of years of planning by the Cassini flight team. This paper looks back upon the mission planning effort in particular, comparing the baseline operational scenarios and contingency plans to the as flown Grand Finale. The bulk of the Grand Finale mission planning effort was focused on the environmental hazards present in the region between Saturn and its rings: the dust and the atmosphere. Dust hazard and atmospheric transit contingency plans were in place to help ensure spacecraft health and maximize science data return. The dust hazard plan gave the operations team the option to turn the spacecraft to a safe attitude during ring-plane crossings had the dust environment proved more threatening than anticipated. The atmospheric transit plan would have made use of an orbital trim maneuver in order to raise or lower periapsis depending on the density of the atmosphere. The proximal environment did have its surprises, though they were good surprises. The dust was significantly less hazardous than predicted. So much so that elements of the contingency plan were leveraged in order to remove a dust hazard protection from the baseline plan, rather than add one to it. While the atmosphere was substantially denser than predicted, it was not dense enough to warrant a periapsis-raise maneuver and actually meant that better in-situ data was gathered. Ultimately, from a mission planning perspective, the Grand Finale went better than expected.

Sturm II, Erick J.↗

NASA's Current Initiative to Improve Operations Planning

As a follow-on to the Technical Capability Assessment Team, in 2015 NASA began seven Agency-wide efforts to seek out opportunities to improve the effectiveness of NASA operations. One of these technical teams is the Mission Operations Planning team, charged with increasing interactions and efficiency for planning of mission activities. That team is chaired by the author with representatives from eight other centers across the Agency. As the strategic architects for the vision of agency-wide ops planning, the team has identified a number of new initiatives and techniques to improve planning, including: breaking down walls within centers which obstruct multi-mission planning; breaking down walls agency-wide which obstruct the sharing of ops planning lessons and capabilities; strengthening the community of practice of ops planning capability developers; establishing best practices for a variety of types of ops planning; defining standards for activity plans and timelines, and plan inputs; and recommending the presence of "multi-mission operations champions" within each center to implement these recommendations into the next decade.

Seal, David↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol (Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

Kanefsky, Bob↗

Electric Distribution System Planning with DERs - High-level Assessment of Tools and Methods

This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assessment Maintenance Plan for the Active Low-Level Burial Ground Trenches 31, 34, and 94 at the Hanford Site

This report documents the maintenance plan for the Hanford Site 200 West Area Active Low-Level Burial Ground Trenches 31 and 34 and 200 East Area Active Trench 94 performance assessment (PA). The PA maintenance plan is one of several supporting documents that are compendiums to the active trenches (Trenches 31, 34, and 94) PA as required in DOE O 435.1, Radioactive Waste Management . The PA is documented in DOE/RL-2021-26, Performance Assessment of Active Trenches in 200 East and West Low-Level Burial Grounds at the Hanford Site . This plan follows the requirements and outline specified in the applicable U.S. Department of Energy (DOE) standard used for developing documents supporting DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation . This maintenance plan summarizes the following major activities DOE plans to conduct to maintain the Trenches 31, 34, and 94 PA: Monitoring; Research and development; Planned reviews and analyses; Revisions of Trenches 31, 34, and 94 PA. The planned research and development activities relate to evaluating the key assumptions, including evaluating conceptual model assumptions and parameter value assumptions used in the PA. The planned research and development activities include those that are designed to track the release mechanisms for Category 1, Category 3, and uranium billet waste sources, as well as continued characterization and related modeling of the natural environment in the Central Plateau of the Hanford Site. In addition, the planned research and development activities include focused testing and evaluation of engineered and natural materials to reduce the uncertainty in the conceptual models and parameter values used in the PA. All key and secondary issues identified during the review of the PA by the Low-Level Waste Disposal Facility Federal Review Group have been resolved prior to finalization of the PA. There are no outstanding issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning for Material Control and Accountancy at Liquid Fueled Molten Salt Reactors

The purpose of this report is to provide molten salt reactor (MSR) developers and future US Nuclear Regulatory Commission (NRC) license applicants with recommendations for developing an effective and practical material control and accounting (MC&A) plan, focused primarily on MSR designs that use circulating liquid fuel. Because of the breadth of MSR designs, there is no single, generic, detailed MC&A plan that will work for every design. The wide variation of fresh fuel salts, the method and frequency of loading fresh fuel, the reactor system design components (e.g., tanks, filtration systems, chemical processing streams), and waste streams will determine the specific measurement locations and instrumentation that can best meet MC&A objectives throughout an MSR facility. Additionally, MSR designs are rapidly evolving, and new design features and deployment scenarios that will affect MC&A are being explored and pursued. This report defines a generic MC&A approach that was developed for terrestrial (as opposed to maritime) deployments to meet the intent of NRC domestic safeguards and MC&A. MSR license applicants should consider nuclear safeguards (both domestic and international) and security throughout the design, as early as the preconceptual design phase. MC&A of special nuclear material (SNM) is an aspect of the NRC’s domestic safeguards program, alongside physical protection. Because liquid-fueled MSRs are reactors with SNM in nondiscrete (or item) form, it is likely that the NRC may require liquid-fueled MSR license applicants to submit a formal MC&A plan as a part of their license application. Currently, the NRC licensing protocol presents a challenge because the NRC MC&A regulations have not been updated to accommodate advanced reactors, including types of MSRs. Because no liquid-fueled MSR has been licensed for operation at the time of this report, no template or precedence for a successfully licensed MSR MC&A plan exists. However, the MSR license applicant can take advantage of the NRC’s published commitments to performance-based regulations. The authors recommend that the license applicant, or MSR designers, develop an MC&A plan throughout the design lifecycle and plan to submit a detailed MC&A program description, or MC&A plan, to the NRC as a part of a license application. No MC&A plan template or guidance exists that is specific to liquid-fueled MSRs. The authors recommend that license applicants discuss the topic of MC&A during preapplication engagement. Because of the uniqueness of MC&A for liquid fueled MSRs, the authors recommend that liquid fueled MSR developers engage with the NRC on the topic of MC&A in the early phases of its design development and follow up any time there are significant modifications in design plans that would affect MC&A. For example, topics like modifications in fuel handling processes, changes in uranium enrichment, or additional chemical processing streams added to the design could be discussed with the NRC specifically on the topic of MC&A.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

The requirements and feasibility of business planning in the office of space and terrestrial applications

The feasibility of applying strategic business planning techniques which are developed and used in the private sector to the planning of certain projects within the NASA Office of Space and Terrestrial Applications was assessed. The methods of strategic business planning that are currently in use in the private sector are examined. The typical contents of a private sector strategic business plan and the techniques commonly used to develop the contents of the plan are described, along with modifications needed to apply these concepts to public sector projects. The current long-range planning process in the Office of Space and Terrestrial Applications is reviewed and program initiatives that might be candidates for the use of strategic business planning techniques are identified. In order to more fully illustrate the information requirements of a strategic business plan for a NASA program, a sample business plan is prepared for a hypothetical Operational Earth Resources Satellite program.

Greenberg, J. S.↗

The Mission Operations Planning Assistant

The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

Schuetzle, James G.↗

The mission operations planning assistant

The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

Schuetzle, James G.↗

The Office of Space Science and Applications strategic plan, 1990: A strategy for leadership in space through excellence in space science and applications

A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.

Source record↗

Integrated Technology Plan for the Civil Space Program, 1991

The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

Source record↗