Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The SWOT Mission Environmental Verification Program

The objective of the Surface Water and Ocean Topography (SWOT) Mission is to make global measurements of sea surface and terrestrial water heights. The SWOT Observatory consists of the Spacecraft Bus, supplied by CNES, and the Payload Module, provided by JPL. The Spacecraft Bus is a carrier of the Payload Module, which includes all the science instruments. The Spacecraft Bus components have been environmentally verified by CNES and the Payload Module components verified by JPL. The Payload Module was delivered to CNES in June 2021 for integration with the Spacecraft Bus to form the Observatory, which is in the process of undergoing a full set of environmental tests before launch. This paper focuses on the environmental test and analysis program at the assembly (unit), subsystem, and module level for the Payload Module hardware that JPL is responsible for verifying. Even though an Earth-orbiting mission like SWOT is not considered to be at extreme environments, SWOT’s environmental verification program does illustrate the standard System Integration and Test (SIT) process for hardware integration and environmental testing to ensure all hardware have been properly qualified to meet all mission environments. Typical space environmental test and analysis campaign includes acoustics vibration, shock, thermal vacuum, venting/pressure, radiation, electrostatic discharge, EMC/EMI/magnetics, and meteoroids. Environmental test and analysis metrics are presented in this paper. This paper also shows the complex integration process that involves multi-organizations and the latest status on the Observatory environmental test campaign.

Man, Kin F.↗

Hemispherical latching apparatus

An apparatus for securing payloads in a space vehicle such as the space shuttle is described. The apparatus includes many latching assemblies carried by a platform on the vehicle and a like number of latching elements carried by the payload and adapted to mate with the latching assemblies. The novelty of the invention is believed to reside in the use of complementary hemispherical elements which automatically align and engage with one another. This enables a simple but effective mode of operation and avoids the need for hinged linkages and similar moving parts.

Clark, K. H.↗

Framework for Defining and Assessing Benefits of a Modular Assembly Design Approach for Exploration Systems

A comprehensive modular assembly system model has been proposed that extends the art from modular hardware, to include in-space assembly, servicing and repair and it s critical components of infrastructure, agents and assembly operations. Benefits of modular assembly have been identified and a set of metrics defined that extends the art beyond the traditional measures of performance, with emphasis on criteria that allow life-cycle mission costs to be used as a figure of merit (and include all substantive terms that have an impact on the evaluation). The modular assembly approach was used as a basis for developing a Solar Electric Transfer Vehicle (SETV) concept and three modular assembly scenarios were developed. The modular assembly approach also allows the SETV to be entered into service much earlier than competing conventional configurations and results in a great deal of versatility in accommodating different launch vehicle payload capabilities, allowing for modules to be pre-assembled before launch or assembled on orbit, without changing the space vehicle design.

Dorsey, John T.↗

Shuttle payload vibroacoustic test plan evaluation

Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

Stahle, C. V.↗

Space Station needs, attributes and architectural options: Summary briefing

Computerized data sorting and analysis techniques were used with a data base accumulated in over 20 years of space station studies to evaluate candidate missions and select a final model of 88 missions. The social, cultural, scientific, technical, and commercial benefits to be accrued from each mission were identified. Requirements were determined for satellite servicing; payload placement and retrieval; refueling; repair; testing; assembly; and construction. Missions drivers determined include crew, remote manipulating system, external parts, instrumentation, extravehicular activity/manned maneuvering unit, and voice/video equipment. User interest for commercial applications were determined. Variable architecture based on a modular concept with multi-use elements is proposed.

Source record↗

Astromag phase A assembly and servicing operations report

Operations concepts for the assembly and servicing of the Astromag Attached Payload on the Space Station Freedom (SSF) are presented. Scenario scripts and graphical representations of the installation of the core facility (CF) on the SSF, installation of experiment hardware on the CF, and the changeout of experiments on the CF are also presented.

Parikh, Link A.↗

Directions for lunar construction - A derivation of requirements from a construction scenario analysis

This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

Dias, William S.↗

Evolving directions in NASA's planetary rover requirements and technology

This paper reviews the evolution of NASA's planning for planetary rovers (i.e. robotic vehicles which may be deployed on planetary bodies for exploration, science analysis, and construction) and some of the technology that has been developed to achieve the desired capabilities. The program is comprised of a variety of vehicle sizes and types in order to accommodate a range of potential user needs. This includes vehicles whose weight spans a few kilograms to several thousand kilograms; whose locomotion is implemented using wheels, tracks, and legs; and whose payloads vary from microinstruments to large scale assemblies for construction. We first describe robotic vehicles, and their associated control systems, developed by NASA in the late 1980's as part of a proposed Mars Rover Sample Return (MRSR) mission. Suggested goals at that time for such an MRSR mission included navigating for one to two years across hundreds of kilometers of Martian surface; traversing a diversity of rugged, unknown terrain; collecting and analyzing a variety of samples; and bringing back selected samples to the lander for return to Earth. Subsequently, we present the current plans (considerably more modest) which have evolved both from technological 'lessons learned' in the previous period, and modified aspirations of NASA missions. This paper describes some of the demonstrated capabilities of the developed machines and the technologies which made these capabilities possible.

Weisbin, C. R.↗

Evolving directions in NASA's planetary rover requirements and technology

The evolution of NASA's planning for planetary rovers (that is robotic vehicles which may be deployed on planetary bodies for exploration, science analysis, and construction) and some of the technology that was developed to achieve the desired capabilities is reviewed. The program is comprised of a variety of vehicle sizes and types in order to accommodate a range of potential user needs. This includes vehicles whose weight spans a few kilograms to several thousand kilograms; whose locomotion is implemented using wheels, tracks, and legs; and whose payloads vary from microinstruments to large scale assemblies for construction. Robotic vehicles and their associated control systems, developed in the late 1980's as part of a proposed Mars Rover Sample Return (MRSR) mission, are described. Goals suggested at the time for such a MRSR mission included navigating for one to two years across hundreds of kilometers of Martian surface; traversing a diversity of rugged, unknown terrain; collecting and analyzing a variety of samples; and bringing back selected samples to the lander for return to Earth. Current plans (considerably more modest) which have evolved both from technological 'lessons learned' in the previous period, and modified aspirations of NASA missions are presented. Some of the demonstrated capabilities of the developed machines and the technologies which made these capabilities possible are described.

Weisbin, C. R.↗

STS-108 Crew Interviews: Dom Gorie

STS-108 Commander Dom Gorie is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Gorie ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Linda Godwin

STS-108 Mission Specialist Linda Godwin is seen during a prelaunch interview. She answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. She gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), her role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how she will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Godwin ends with her thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Mark Kelly

STS-108 Pilot Mark Kelly is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Kelly ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Dan Tani

STS-108 Mission Specialist Dan Tani is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Tani ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

[The Extrasolar Planetary Imaging Coronagraph]

The Extrasolar Planetary Imaging Coronagraph (EPIC) is a proposed NASA Exoplanet Probe mission to image and characterize extr asolar giant planets in orbits with semi-major axes between 2 and 10 AU. EPIC will provide insights into the physical nature of a variety of planets in other solar systems complimenting radial velocity (RV) and astrometric planet searches. It will detect and characterize the atmospheres of planets identified by radial velocity surveys, deter mine orbital inclinations and masses, characterize the atmospheres around A and F type stars which cannot be found with RV techniques, and observe the inner spatial structure and colors of debris disks. EPIC has a heliocentric Earth trailing drift-away orbit, with a 5 year mission lifetime (5 year goal). The robust mission design is simple and flexible ensuring mission success while minimizing cost and risk. The science payload consists of a heritage optical telescope assembly (OTA), and visible nulling coronagraph (VNC) instrument. The instrument achieves a contrast ratio of 10(exp 9) over a 4.84 arcsecond field-of-view with an unprecedented inner working angle of 0.14 arcseconds over the spectral range of 440-880 nm. The telescope is a 1.65 meter off-axis Cassegrain with an OTA wavefront error of /9, which when coupled to the VNC greatly reduces the requirements on the large scale optics, compressing them to stability requirements within the relatively compact VNC optical chain. The VNC features two integrated modular nullers, a spatial filter array (SFA) and an E2V-L3 photon counting CCD. Direct null control is accomplished from the science focal plane mitigating against complex wavefront and amplitude sensing and control strategies.

Clampin, Mark↗

Why Major Programs Need Innovation Support Labs: An Example from the Space Shuttle Launch Program at KSC

For over 30 years the Kennedy Space Center (KSC) has processed the Space Shuttle; handling all hands-on aspects from receiving the Orbiter, External Tanks, Solid Rocket Booster Segments, and Payloads, through certification, check-out, and assembly, and ending with fueling, count-down, and launch. A team of thousands have worked this highly complicated, yet supremely organized, process and have, as a consequence, generated an exceptional amount of technology to solve a host of problems. This paper describes the contributions of one team that formed with the express purpose to help solve some of these diverse Shuttle ground processing problems.

Youngquist, Robert C.↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Stratosphere Conditions Inactivate Bacterial Endospores from a Mars Spacecraft Assembly Facility

Every spacecraft sent to Mars is allowed to land viable microbial bioburden, including hardy endospore-forming bacteria resistant to environmental extremes. Earth’s stratosphere is severely cold, dry, irradiated and oligotrophic; it can be used as a stand-in location for predicting how stowaway microbes might respond to the Martian surface. We launched E-MIST, a high altitude NASA balloon payload on 10 Oct 2015 carrying known quantities of viable Bacillus pumilus SAFR-032 (4.07 x107 spores per sample), a radiation-tolerant strain collected from a spacecraft assembly facility. The payload spent 8 hours at ~32 km above sea level exposing bacterial spores to the stratosphere. We found that within 120 and 240 min, spore viability was significantly reduced by 2 and 4 orders of magnitude, respectively. By 480 min, < 0.001% of spores carried to the stratosphere remained viable. Our balloon flight results predict that most terrestrial bacteria would be inactivated within the first Sol on Mars if contaminated spacecraft surfaces receive direct sunlight. Unfortunately, an instrument malfunction prevented the acquisition of ultraviolet (UV) light measurements during our balloon mission. To make up for the absence of radiometer data, we calculated a stratosphere UV model and also conducted ground tests with a 271.1 nm UVC light source (0.5 W/m2), observing a similarly rapid inactivation rate when using a lower number of contaminants (640 spores per sample). The starting concentration of spores and micro-configuration on hardware surfaces appeared to influence survivability outcomes in both experiments. With the relatively few spores that survived the stratosphere, we performed a re-sequencing analysis and identified 3 single nucleotide polymorphisms compared to unexposed controls. It is therefore plausible that bacteria enduring radiation-rich environments (e.g., Earth’s upper atmosphere, interplanetary space, or the surface of Mars) may be pushed in evolutionarily consequential directions.

Mars↗