Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

AI-Enabled Operations at Fermi Complex: Multivariate Time Series Prediction for Outage Prediction and Diagnosis

The Main Control Room of the Fermilab accelerator complex continuously gathers extensive time-series data from thousands of sensors monitoring the beam. However, unplanned events such as trips or voltage fluctuations often result in beam outages, causing operational downtime. This downtime not only consumes operator effort in diagnosing and addressing the issue but also leads to unnecessary energy consumption by idle machines awaiting beam restoration. The current threshold-based alarm system is reactive and faces challenges including frequent false alarms and inconsistent outage-cause labeling. To address these limitations, we propose an AI-enabled framework that leverages predictive analytics and automated labeling. Using data from $2,703$ Linac devices and $80$ operator-labeled outages, we evaluate state-of-the-art deep learning architectures, including recurrent, attention-based, and linear models, for beam outage prediction. Additionally, we assess a Random Forest-based labeling system for providing consistent, confidence-scored outage annotations. Our findings highlight the strengths and weaknesses of these architectures for beam outage prediction and identify critical gaps that must be addressed to fully harness AI for transitioning downtime handling from reactive to predictive, ultimately reducing downtime and improving decision-making in accelerator management.

Jain, Milan [PNL, Richland] (ORCID:000000021676111↗

Power Quality and Stability in a Cluster of Microgrids with Coordinated Power and Energy Management

Distributed Energy Resources (DER) such as photovoltaic (PV) systems and battery energy storage systems (BESS) can be operated collectively as microgrids. Microgrids can be effective in meeting local load requirements as well as in improving the power quality and stability in a modern power distribution system. Multiple microgrids can also be operated in a coordinated manner as a cluster, to improve the resiliency of the power distribution system. In the event of an outage caused by a transmission system failure, the microgrids in a cluster can use their distributed generation capacity and energy storage resources to recover and extend power availability to the critical loads in the system. In this paper, an illustrative cluster of two microgrids based on the IEEE 13-bus model with DERs has been used, to demonstrate the operation of the concept using real-time simulations. Using real-time simulations, capabilities such as switching reconfiguration following faults, identification of optimal DER placement for effective power quality management, and power electronic controller validation have been demonstrated. For the two-microgrid cluster, this paper also presents improvements in load voltage quality and

Chowdhury, Prithwiraj Roy↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 4QCY14 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the fourth quarter of calendar year 2014 (4QCY14). After a 47 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP) 1 . The 4QCY14 saltstone sample results show that the saltstone is Resource Conservation Recovery Act (RCRA) nonhazardous, but is greater than the universal treatment standard for land disposal. The Saltstone Production Facility (SPF) and SDF were in a maintenance outage during the 4QCY14. Thus no processing or disposal of saltstone, as characterized by this 4QCY14 sample, occurred.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

Extending the lifetime of mixer paddles used in the production of a low-level radioactive cementitious waste form - 15624

The salt-stone Production Facility (SPF) at the Savannah River Site (SRS) immobilizes low-level radioactive salt solution as a cementitious waste form known as salt-stone. The mixer used in the SPF is a '10-inch' Readco-Kurimoto continuous mixer with paddles fabricated from a high toughness steel. salt-stone is processed daily at a rate of 9.46 E-03 m{sup 3}/s (150 gallons per minute) in a caustic and radioactive environment. The paddles have degraded much quicker than expected which limits production rates and increases outage times. Due to the high cost of the mixer and the limited maintenance due to the radioactive environment, a combination of material properties and paddle configuration must be employed to extend the lifetime of the paddles. This paper will discuss two wear tests conducted by the Savannah River National Laboratory (SRNL) to determine the optimum paddle configuration to reduce wear on the mixer paddles. The first wear test used the mixer design operated up to December 2011 as the baseline and the second test used the mixer design installed after December 2011 as its baseline. As a result of these tests, the SPF will be implementing a new paddle configuration in the mixer currently installed in the SPF process room. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wildfire and power grid nexus in a changing climate

Global wildfire events have had increasingly severe impacts in recent years, particularly in the western USA, driven by extreme fire-weather conditions, fuel accumulation and multiple ignition sources. Wildfires sparked by power lines tend to be larger and more destructive, as they often occur during high winds, which accelerate the spread of fires. Moreover, efforts to contain wildfires frequently result in power outages, causing considerable economic disruption. Here, in this Review, we examine wildfire risks related to power-line-induced ignitions, infrastructure damage, climate-induced environmental impacts, grid operational risks, real-time grid management risks, vegetation management risks, and financial and funding risks in the context of a changing climate and their interdependence with power grid infrastructures. We then explore the resilience of power grids under wildfire threats, looking at risk analysis, prediction and mitigation strategies. The Review also shares practical insights and experiences in the USA to inform researchers, policymakers and industry professionals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Assessment in Event Evaluation P-302

Incidents at locations such as nuclear power plants, waste repositories, and medical treatment facilities occur at many different times and under a variety of situations. Even the most modern, well run organizations may experience events that are precursors to more serious situations. Currently, the U.S. Nuclear Regulatory Commission evaluates a variety of such events at commercial nuclear plants via the Significance Determination Process (SDP), Management Directive 8.3, and the Accident Sequence Precursor (ASP) program. In these programs, the analyst calculates a conditional risk measure (e.g., conditional core damage probability) for an initiating event situation or an unplanned equipment outage. This calculation is called an “event evaluation.” An “event evaluation” uses a probabilistic risk assessment model to obtain a risk measure that is conditional on the situation which existed during an incident. The Risk Assessment in Event Evaluation material is intended to address how this evaluation is performed using modern risk analysis tools.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Enhancing Power Resilience for Remote Communities: A Comprehensive Renewable Energy Solution for Itbayat Island

The island of Itbayat, Philippines, faces significant challenges in maintaining a reliable and resilient power supply due to its current reliance on a vulnerable power distribution system managed by a local electric cooperative. The existing infrastructure, which includes diesel generators and a radial network configuration with some above-ground lines, is highly susceptible to frequent typhoons and adverse weather conditions. These factors, combined with inadequate staffing and high operational costs, result in frequent power outages that disrupt daily life and hinder economic development. This white paper proposes a comprehensive solution to enhance the resilience and reliability of Itbayat's power system by integrating renewable energy sources, specifically solar photovoltaic (PV) systems, battery storage, and a microgrid controller. The proposed solution aims to reduce dependency on diesel fuel, optimize energy use, and provide a sustainable and robust power supply for the island. Key components of the solution include: 1. Solar PV Installation: Deploying solar PV panels to harness abundant solar energy, reducing reliance on diesel fuel. 2. Battery Storage Systems: Installing battery storage to store excess solar energy and ensure a continuous power supply during low solar generation periods. 3. Microgrid Controller: Implementing a microgrid controller to manage and optimize the integration of solar PV, battery storage, and existing diesel generators. The proposed solution addresses several critical issues, including system vulnerability, generator dependency, and operational inefficiencies. By adopting this innovative approach, Itbayat Island can achieve a more resilient, efficient, and sustainable energy infrastructure, ensuring a stable power supply for its residents and enhancing overall energy security.

14 SOLAR ENERGY↗

Reliability of emergency and standby diesel generators: Impact on energy resiliency solutions

Emergency diesel generators are the most common form of backup power for critical loads when the grid fails and are most often deployed as stand-alone generators (<2000 kW) tied to individual buildings for hospitals, emergency services, military bases, ports, airports, industries, and commercial facilities. Understanding the finite reliability of emergency diesel generators during continuous operation is critical for energy planners, managers, and end-users. A new analysis of two large non-public emergency diesel generator operational data sets shows that commonly used reliability metrics are inadequate to predict the performance during a grid outage. Additional metrics addressing the likelihood of an emergency diesel generator to be available at the time an outage starts, successfully start and carry load, and constantly run for the duration of the outage are needed to predict the continuous run-time reliability of emergency diesel generators during a grid outage. This is the first analysis of the reliability of modern generators that follow standard maintenance protocols commonly used for backup power and these new metrics are shown to be dependent on the level of emergency diesel generator maintenance with values that can vary by more than an order of magnitude. Even using the new metrics for well-maintained emergency diesel generators, the analysis shows that the single emergency diesel generators configurations are only 80% likely to provide power for the duration of a two-week grid outage.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Considerations for recovery of large areas of a nuclear facility for re-use - 15147

This paper highlights a number of factors an organization might consider for recovery of a facility, using a successful example from the UK. In 2013 a power failure led to the shutdown of the ventilation system that caused loose contamination to be deposited over large sections of man-accessible areas of plant after the evacuation of personnel. The successful initiation of emergency Command and Control arrangements during the Response phase, saw several key responders brought together to offer technical direction across many disciplines. The actions of the Command and Control unit prevented any further spread contamination to other areas of the facility and any external release. This enabled the return of the plant to an operational status which forms an important mission enabler for the site hazard reduction programme. Intervention at an early stage during the Response phase of the incident saw the cessation of traditional dilute chemical wet decontamination approach that would otherwise leave a legacy of slow leaching contamination; to that of containment and ultimate removal of loose contamination using strippable coatings. Doing so established a more rapid and reliably 'clean' access or pathway into the plant to establish the full extent of the situation. The scale and scope of the decontamination requirement was steadily revealed through a number of controlled re-entries to the plant. A number of other techniques were considered and employed to address the different areas making use of available plant resources to deliver the successful 'self-help' recovery of the plant using multi-disciplinary teams. As Response switched to Recovery, it was important to set out and agree which strategic option should be adopted to return the facility to normal operation. Equally, it was necessary to verify which equipment had been affected by the power outage and repair as required. Furthermore, equipment with designated safety functions had to be maintained alongside the Recovery activities. A careful balance of priorities demanded an unparalleled depth of plant knowledge to address this, whilst still keeping site and external stakeholders informed. The engagement by the plant workforce to take on the decontamination challenge to enable recovery of their plant supported by other teams formed a critical step in the speed of recovery. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New York Solar Smart DG Hub-Resilient Solar Project: Economic and Resiliency Impact of PV and Storage on New York Critical Infrastructure

Resilient PV, which is solar paired with storage ('solar-plus-storage'), provides value both during normal grid operation and power outages as opposed to traditional solar PV, which functions only when the electric grid is operating. During normal grid operations, resilient PV systems help host sites generate revenue and/or reduce electricity bill charges. During grid outages, resilient PV provides critical emergency power that can help people in need and ease demand on emergency fuel supplies. The combination of grid interruptions during recent storms, the proliferation of solar PV, and the growing deployment of battery storage technologies has generated significant interest in using these assets for both economic and resiliency benefits. This report analyzes the technical and economic viability for resilient PV on three critical infrastructure sites in New York City (NYC): a school that is part of a coastal storm shelter system, a fire station, and a NYCHA senior center that serves as a cooling center during heat emergencies. This analysis differs from previous solar-plus-storage studies by placing a monetary value on resiliency and thus, in essence, modeling a new revenue stream for the avoided cost of a power outage. Analysis results show that resilient PV is economically viable for NYC's critical infrastructure and that it may be similarly beneficial to other commercial buildings across the city. This report will help city building owners, managers, and policymakers better understand the economic and resiliency benefits of resilient PV. As NYC fortifies its building stock against future storms of increasing severity, resilient PV can play an important role in disaster response and recovery while also supporting city greenhouse gas emission reduction targets and relieving stress to the electric grid from growing power demands.

14 SOLAR ENERGY↗

AGR-3/4 Final Data Qualification Report for ATR Cycles 151A through 155B-1

This report provides the qualification status of experimental data for the entire Advanced Gas Reactor 3/4 (AGR 3/4) fuel irradiation. AGR-3/4 is the third in a series of planned irradiation experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) for the AGR Fuel Development and Qualification Program, which supports development of the advanced reactor technology under the INL ART Technology Development Office (TDO). The main objective of AGR-3/4 irradiation is to provide a known source of fission products for subsequent transport through compact matrix and structural graphite materials due to the presence of designed-to-fail fuel particles. Full power irradiation of the AGR 3/4 test began on December 14, 2011 (ATR Cycle 151A), and was completed on April 12, 2014 (end of ATR Cycle 155B) after 369.1 effective full power days of irradiation. The AGR-3/4 test was in the reactor core for eight of the ten ATR cycles between 151A and 155B. During the unplanned outage cycle, 153A, the experiment was removed from the ATR northeast flux trap (NEFT) location and stored in the ATR canal. This was to prevent overheating of fuel compacts due to higher than normal ATR power during the subsequent Powered Axial Locator Mechanism cycle, 153B. The AGR 3/4 test was inserted back into the ATR NEFT location during the outage of ATR Cycle 154A on April 26, 2013. Therefore, the AGR-3/4 irradiation data received during these 2 cycles (153A and 153B) are irrelevant and their qualification status isnot included in this report. Additionally, during ATR Cycle 152A the ATR core ran at low power for a short enough duration that the irradiation data are not used for physics and thermal calculations. However, the qualification status of irradiation data for this cycle is still covered in this report. As a result, this report includes data from 8 ATR Cycles: 151A, 151B, 152A, 152B, 154A, 154B, 155A, and 155B, as recorded in the Nuclear Data Management and Analysis System (NDMAS). The AGR 3/4 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates, pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates, release to birth rate ratios [R/Bs], and particle failure counts) for each of the twelve capsules in the AGR 3/4 experiment. During Outage Cycle 155A, fourteen flow meters were installed downstream from fourteen FPMS monitors to measure flows from the monitors; qualification status of these data are also included in the report. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) composed of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. For ATR Cycles 151A through 154B, the DRC convened on February 12, 2014, reviewed the data acquisition process, and considered whether the data met the requirements for data collection as specified in QA approved INL ART TDO data collection plans. The DRC also examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report. The qualification status of AGR-3/4 irradiation data during the first six cycles were previously reported in INL/EXT-14-31186 document. This report presents data qualification status for the entire AGR-3/4 irradiation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MANAGING OXIDE SCALE EXFOLIATION IN BOILERS WITH TP347H SUPERHEATER TUBES

A model based on a concept of fraction of exfoliated area as a function of oxide scale strain energy was developed to predict the extent of exfoliation of steam-side scale from boiler tube superheater loops. As compared with the Armitt diagram, which can be used to predict when scale damage and exfoliation would be likely to occur, a fraction of exfoliated area approach provides an estimation of mass of scale released and the fraction of tube likely to be blocked by the exfoliation. This paper show results for the extent of blockage expected in a single bend of a superheater loop was predicted as a function of operating time, bend geometry, and outlet steam temperature under realistic service conditions that include outages. The deposits of exfoliated scale were assumed to be distributed horizontally the tubes bends. Three types of bends were considered: regular bends, short bends, and hairpin bends. The progressive increase in steam and tube temperatures along a single loop of superheater tubing and the ensuing variation of oxide scale thickness are considered. Numerical simulation results for a superheater loop made of TP347H austenitic steel indicated that tube blockage fractions larger than 50% are likely to occur within the first two years of boiler operation (with regularly scheduled outages) for outlet tube temperatures of 540-570oC, which is consistent with practical experience. Higher blockage fractions were predicted for tubes with short bends and hairpin bends than for tubes with regular bends, of length that are larger than five internal tube diameters. Finally, the blockage model presented can be used with some confidence to devise operating schedules for managing the consequences of oxide scale exfoliation based on projections of time to some critical blockage fraction for specific boiler operating conditions.

Sabau, Adrian S↗

Utilising demand response for distribution service restoration to achieve grid resiliency against natural disasters

The increased frequency of power outages due to natural disasters in recent years has highlighted the urgency of enhancing distribution grid resilience. The effective distribution service restoration (DSR) is an important measure for a resilient distribution grid. In this work, the authors demonstrate that DSR can be significantly improved by leveraging the flexibility provided by the inclusion of demand response (DR). The authors propose a framework for this by considering integrated control of household-level flexible appliances to vary the load demand at the distribution-grid level to improve DSR. The overall framework of the proposed system is modelled as a three-step method considering three optimization problems to (i) calculate feasible controllable aggregated load range for each bus, (ii) determine candidate buses to perform DR and their target load demand, and (iii) maintain the load level in each house through home energy management during the DSR, considering uncertainties in load and solar generation sequentially. The optimization problems are formulated as linear programming, mixed-integer linear programming, and multistage stochastic programming (solved using the stochastic dual dynamic programming) models. Finally, case studies performed in the IEEE 123-node test feeder show improvements in resilience in terms of energy restored compared to the restoration process without DR.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AP1000{sup R} severe accident features and post-Fukushima considerations

The AP1000{sup R} passive nuclear power plant is uniquely equipped to withstand an extended station blackout scenario such as the events following the earthquake and tsunami at Fukushima without compromising core and containment integrity. The AP1000 plant shuts down the reactor, cools the core, containment and spent fuel pool for more than 3 days using passive systems that do not require AC or DC power or operator actions. Following this passive coping period, minimal operator actions are needed to extend the operation of the passive features to 7 days using installed equipment. To provide defense-in-depth for design extension conditions, the AP1000 plant has engineered features that mitigate the effects of core damage. Engineered features retain damaged core debris within the reactor vessel as a key feature. Other aspects of the design protect containment integrity during severe accidents, including unique features of the AP1000 design relative to passive containment cooling with water and air, and hydrogen management. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The power reliability event simulator tool (PRESTO): A novel approach to distribution system reliability analysis and applications

The growing interest in onsite solar photovoltaic and energy storage systems is partially motivated by customer concerns regarding grid reliability. However, accurately assessing the effectiveness of PVESS in mitigating these interruptions requires a comprehensive understanding of location-specific outage patterns and the ability to simulate realistic scenarios. To address the gap, we introduce the Power Reliability Event Simulation TOol (PRESTO), the first publicly available tool that simulates location-specific power interruptions at the county level. PRESTO allows for a more realistic assessment of system reliability by considering the unpredictability and location-specific patterns of power interruptions. We applied PRESTO in a case study of a single-family home across three U.S. counties, examining the performance of a solar photovoltaic system with 10kWh of battery storage during short-duration power interruptions. Our findings show that this system reliably met 93% of energy demand for essential non-heating and cooling loads, fully serving these loads in 84% of events, despite the constraints of daily time-of-use bill management which limits the battery's state-of-charge reserve. However, when heating and cooling loads were included, system performance decreased significantly, with only 70% of demand met and full service in 43% of events. These results highlight the challenges of using solar photovoltaic and energy storage systems for short-duration outages, emphasizing the need to consider factors like battery size and grid charging strategies to improve reliability. Our study demonstrates the practical applications of PRESTO, providing valuable insights into potential mitigation strategies including grid charging and optimizing battery size.

14 SOLAR ENERGY↗