Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Mission Operations Directorate's International Space Station Alpha Hardware Familiarization Role

The National Aeronautics and Space Administration's Mission Operation Directorate's (MOD) On-Orbit Maintenance Operations Mission Controllers are participating in space station hardware tests and demonstrations in multiple neutral buoyancy facilities. This is part of the controllers' hardware familiarization world in preparation to support the astronauts in the operation and maintenance of the hardware. This paper describes the larger context of Mission Controller hardware familiarization with specifics of participation in the Boeing neutral buoyancy tests. Also covered is what participation has occurred in the past and future plans.

Zingrebe, Kenneth W., II↗

Performance of Nickel-Cadmium Batteries on the POES Series of Weather Satellites

The advanced Television Infrared Observation satellite program is a cooperative effort between the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), the United Kingdom, Canada and France, for providing day and night global environmental and associated data. NASA is responsible for procurement launch, and checkout of these spacecraft before transferring them over to NOAA, who operates the spacecraft to support weather forecasting, severe storm tracking, and 'meteorological research by the National Weather Service. These spacecraft with all weather monitoring instruments imposed challenging requirements for the onboard electrical power subsystem (EPS). This paper provides first a brief overview of the overall power subsystem, followed by a description of batteries. A unique power subsystem design which provides 'tender-loving-care' to these batteries is highlighted. This is followed by the on-orbit maintenance and performance data of the batteries since launch.

Rao, Gopalakrishna M.↗

Design of a Formation of Earth-Orbiting Satellites: The Auroral Lites Mission

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has proposed a set of spacecraft flying in close formation around the Earth in order to measure the behavior of the auroras. The mission, named Auroral Lites, consists of four spacecraft configured to start at the vertices of a tetrahedron, flying over three mission phases. During the first phase, the distance between any two spacecraft in the formation is targeted at 10 kilometers (km). The second mission phase is much tighter, requiring satellite interrange spacing targeted at 500 meters. During the final phase of the mission, the formation opens to a nominal 100-km interrange spacing. In this paper, we present the strategy employed to initialize and model such a close formation during each of these phases. The analysis performed to date provides the design and characteristics of the reference orbit, the evolution of the formation during Phases I and II, and an estimate of the total mission delta-V budget. AI Solutions' mission design tool, FreeFlyer, was used to generate each of these analysis elements. The tool contains full force models, including both impulsive and finite duration maneuvers. Orbital maintenance can be fully modeled in the system using a flexible, natural scripting language built into the system. In addition, AI Solutions is in the process of adding formation extensions to the system facilitating mission analysis for formations like Auroral Lites. We will discuss how FreeFlyer is used for these analyses.

Hametz, Mark E.↗

Design of a Formation of Earth Orbiting Satellites: The Auroral Lites Mission

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has proposed a set of spacecraft flying in close formation around the Earth in order to measure the behavior of the auroras. The mission, named Auroral Lites, consists of four spacecraft configured to start at the vertices of a tetrahedron, flying over three mission phases. During the first phase, the distance between any two spacecraft in the formation is targeted at 10 kilometers (km). The second mission phase is much tighter, requiring satellite interrange spacing targeted at 500 meters. During the final phase of the mission, the formation opens to a nominal 100-km interrange spacing. In this paper, we present the strategy employed to initialize and model such a close formation during each of these phases. The analysis performed to date provides the design and characteristics of the reference orbit, the evolution of the formation during Phases I and II, and an estimate of the total mission delta-V budget. AI Solutions' mission design tool, FreeFlyer(R), was used to generate each of these analysis elements. The tool contains full force models, including both impulsive and finite duration maneuvers. Orbital maintenance can be fully modeled in the system using a flexible, natural scripting language built into the system. In addition, AI Solutions is in the process of adding formation extensions to the system facilitating mission analysis for formations like Auroral Lites. We will discuss how FreeFlyer(R) is used for these analyses.

Hametz, Mark E.↗

GRACE Mission Design: Impact of Uncertainties in Disturbance Environment and Satellite Force Models

The Gravity Recovery and Climate Experiment (GRACE) primary mission will be performed by making measurements of the inter-satellite range change between two co-planar, low altitude, near-polar orbiting satellites. Understanding the uncertainties in the disturbance environment, particularly the aerodynamic drag and torques, is critical in several mission areas. These include an accurate estimate of the spacecraft orbital lifetime, evaluation of spacecraft attitude control requirements, and estimation of the orbital maintenance maneuver frequency necessitated by differences in the drag forces acting on both satellites. The FREEMOL simulation software has been developed and utilized to analyze and suggest design modifications to the GRACE spacecraft. Aerodynamic accommodation bounding analyses were performed and worst-case envelopes were obtained for the aerodynamic torques and the differential ballistic coefficients between the leading and trailing GRACE spacecraft. These analyses demonstrate how spacecraft aerodynamic design and analysis can benefit from a better understanding of spacecraft surface accommodation properties, and the implications for mission design constraints such as formation spacing control.

Mazanek, Daniel D.↗

Aerothermal Analysis and Design of the Gravity Recovery and Climate Experiment (GRACE) Spacecraft

The Gravity Recovery and Climate Experiment (GRACE) primary mission will be performed by making measurements of the inter-satellite range change between two co-planar, low altitude near-polar orbiting satellites. Understanding the uncertainties in the disturbance environment, particularly the aerodynamic drag and torques, is critical in several mission areas. These include an accurate estimate of the spacecraft orbital lifetime, evaluation of spacecraft attitude control requirements, and estimation of the orbital maintenance maneuver frequency necessitated by differences in the drag forces acting on both satellites. The FREEMOL simulation software has been developed and utilized to analyze and suggest design modifications to the GRACE spacecraft. Aerodynamic accommodation bounding analyses were performed and worst-case envelopes were obtained for the aerodynamic torques and the differential ballistic coefficients between the leading and trailing GRACE spacecraft. These analyses demonstrate how spacecraft aerodynamic design and analysis can benefit from a better understanding of spacecraft surface accommodation properties, and the implications for mission design constraints such as formation spacing control.

Mazanek, Daniel D.↗

Propulsion Options for the LISA Mission

The LISA mission is a constellation of three spacecraft operating at 1 AU from the Sun in a position trailing the Earth. After launch, a propulsion module provides the AV necessary to reach this operational orbit, and separates from the spacecraft. A second propulsion system integrated with the spacecraft maintains the operational orbit and reduces nongravitational disturbances on the instruments. Both chemical and electrical propulsion systems were considered for the propulsion module, and this trade is presented to show the possible benefits of an EP system. Several options for the orbit maintenance and disturbance reduction system are also briefly discussed, along with several important requirements that suggest the use of a FEEP thruster system.

Cardiff, Eric H.↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

Making the Most of Waste Energy

The Thermo-Mechanical Systems Branch at NASA s Glenn Research Center is responsible for planning and conducting research efforts to advance thermal systems for space, aerospace, and non-aerospace applications. Technological areas pertain to solar and thermal energy conversion. For example, thermo-mechanical systems researchers work with gas (Stirling) and liquid/vapor (Rankine) systems that convert thermal energy to electrical power, as well as solar dynamic power systems that concentrate sunlight to electrical power. The branch s development of new solar and thermal energy technologies is propelling NASA s missions deep into unfamiliar territories of space. Solar dynamic power systems are actively improving the health of orbiting satellites, giving them longer life and a stronger radiation tolerance, thus, creating less need for on-orbit maintenance. For future missions, NASA may probe even deeper into the mysterious cosmos, with the adoption of highly efficient thermal energy converters that have the potential to serve as the source of onboard electrical power for satellites and spacecraft. Research indicates that these thermal converters can deliver up to 5 times as much power as radioisotope thermoelectric generators in use today, for the same amount of radioisotope. On Earth, energy-converting technologies associated with NASA s Thermo-Mechanical Systems Branch are being used to recover and transform low-temperature waste heat into usable electric power, with a helping hand from NASA.

Source record↗

Orbiting Depot and Reusable Lander for Lunar Transportation

A document describes a conceptual transportation system that would support exploratory visits by humans to locations dispersed across the surface of the Moon and provide transport of humans and cargo to sustain one or more permanent Lunar outpost. The system architecture reflects requirements to (1) minimize the amount of vehicle hardware that must be expended while maintaining high performance margins and (2) take advantage of emerging capabilities to produce propellants on the Moon while also enabling efficient operation using propellants transported from Earth. The system would include reusable single- stage lander spacecraft and a depot in a low orbit around the Moon. Each lander would have descent, landing, and ascent capabilities. A crew-taxi version of the lander would carry a pressurized crew module; a cargo version could carry a variety of cargo containers. The depot would serve as a facility for storage and for refueling with propellants delivered from Earth or propellants produced on the Moon. The depot could receive propellants and cargo sent from Earth on a variety of spacecraft. The depot could provide power and orbit maintenance for crew vehicles from Earth and could serve as a safe haven for lunar crews pending transport back to Earth.

Petro, Andrew↗

Lunar Reconnaissance Orbiter (LRO) Guidance, Navigation and Control (GN&C) Overview

The National Aeronautics and Space Administration s (NASA) Lunar Reconnaissance Orbiter (LRO) launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle and into a direct insertion trajectory to the oon. LRO, which was designed, built, and operated by the NASA Goddard Space Flight Center in Greenbelt, MD, is gathering crucial data on the lunar environment that will help astronauts prepare for long-duration lunar expeditions. The mission has a nominal life of 1 year as its seven instruments find safe landing sites, locate potential resources, characterize the radiation environment, and test new technology. To date, LRO has been operating well within the bounds of its requirements and has been collecting excellent science data images taken from the LRO Camera Narrow Angle Camera of the Apollo landing sites appeared on cable news networks. A significant amount of information on LRO s science instruments is provided at the LRO mission webpage. LRO s Guidance, Navigation and Control (GN&C) subsystem is made up of an onboard attitude control system (ACS) and a hardware suite of sensors and actuators. The LRO onboard ACS is a collection of algorithms based on high level and derived requirements, and reflect the science and operational events throughout the mission lifetime. The primary control mode is the Observing mode, which maintains the lunar pointing orientation and any offset pointing from this baseline. It is within this mode that all science instrument calibrations, slews and science data is collected. Because of a high accuracy requirement for knowledge and pointing, the Observing mode makes use of star tracker (ST) measurement data to determine an instantaneous attitude pointing. But even the star trackers alone do not meet the tight requirements, so a six-state Kalman Filter is employed to improve the noisy measurement data. The Observing mode obtains its rate information from an inertial reference unit (IRU) and in the event of an IRU failure, the rate data is be derived from the star tracker, but with degraded pointing performance. The Delta-V control mode responsibility is to maintain attitude pointing during the cruise trajectory, insertion burns and lunar orbit maintenance by adjustments made to the spacecraft s velocity magnitude and vector direction. The ACS also provides for a thruster based system momentum management algorithm (known as Delta-H) to maintain the system and wheel momentum to within acceptable levels. In the event an anomaly causes the LRO spacecraft to lose the ability to maintain its current attitude pointing, a Sun Safe mode is included in the ACS for the purpose of providing a known power and thermally safe coarse inertial sun attitude for an indefinite period of time, within the manageable limits of the reaction wheels. The Sun Safe mode is also the initial spacecraft control mode off of the launch vehicle and provides for a means to null tip-off rates immediately after separation. The nominal configuration is to use the IRU for rate information in the controller. In the event of a gyro failure a gyroless control mode was developed that computes rate information from the CSS data.

Garrick, Joseph↗

Hardware Design Improvements to the Major Constituent Analyzer

The Major Constituent Analyzer (MCA) onboard the International Space Station (ISS) is designed to monitor the major constituents of the ISS's internal atmosphere. This mass spectrometer based system is an integral part of the Environmental Control and Life Support System (ECLSS) and is a primary tool for the management of ISS atmosphere composition. As a part of NASA Change Request CR10773A, several alterations to the hardware have been made to accommodate improved MCA logistics. First, the ORU 08 verification gas assembly has been modified to allow the verification gas cylinder to be installed on orbit. The verification gas is an essential MCA consumable that requires periodic replenishment. Designing the cylinder for subassembly transport reduces the size and weight of the maintained item for launch. The redesign of the ORU 08 assembly includes a redesigned housing, cylinder mounting apparatus, and pneumatic connection. The second hardware change is a redesigned wiring harness for the ORU 02 analyzer. The ORU 02 electrical connector interface was damaged in a previous on-orbit installation, and this necessitated the development of a temporary fix while a more permanent solution was developed. The new wiring harness design includes flexible cable as well as indexing fasteners and guide-pins, and provides better accessibility during the on-orbit maintenance operation. This presentation will describe the hardware improvements being implemented for MCA as well as the expected improvement to logistics and maintenance.

Combs, Scott↗

Asteroid Redirect Crewed Mission Nominal Design and Performance

In 2010, the President announced that, in 2025, the U.S. intended to launch a human mission to an asteroid [1]. This announcement was followed by the idea of a Capability Driven Framework (CDF) [2], which is based on the idea of evolving capabilities from less demanding to more demanding missions to multiple possible destinations and with increased flexibility, cost effectiveness and sustainability. Focused missions, such as a NASA inter-Center study that examined the viability and implications of sending a crew to a Near Earth Asteroid (NEA) [3], provided a way to better understand and evaluate the utility of these CDF capabilities when applied to an actual mission. The long duration of the NEA missions were contrasted with a concept described in a study prepared for the Keck Institute of Space Studies (KISS) [4] where a robotic spacecraft would redirect an asteroid to the Earth-Moon vicinity, where a relatively short duration crewed mission could be conducted to the captured asteroid. This mission concept was included in the National Aeronautics and Space Administration (NASA) fiscal year 2014 budget request, as submitted by the NASA Administrator [5]. NASA studies continued to examine the idea of a crewed mission to a captured asteroid in the Earth-Moon vicinity. During this time was an announcement of NASA's Asteroid Grand Challenge [6]. Key goals for the Asteroid Grand Challenge are to locate, redirect, and explore an asteroid, as well as find and plan for asteroid threats. An Asteroid Redirect Mission (ARM) study was being conducted, which supports this Grand Challenge by providing understanding in how to execute an asteroid rendezvous, capture it, and redirect it to Earth-Moon space, and, in particular, to a distant retrograde orbit (DRO). Subsequent to the returning of the asteroid to a DRO, would be the launch of a crewed mission to rendezvous with the redirected asteroid. This report examines that crewed mission by assessing the Asteroid Redirect Crewed Mission (ARCM) nominal design and performance costs associated with an Orion based crewed rendezvous mission to a captured asteroid in an Earth-Moon DRO. The ARM study includes two fundamental mission phases: 1) The Asteroid Redirect Robotic Mission (ARRM) and 2) the ARCM. The ARRM includes a solar electric propulsion based robotic asteroid return vehicle (ARV) sent to rendezvous with a selected near Earth asteroid, capture it, and return it to a DRO in the Earth-Moon vicinity. The DRO is selected over other possible asteroid parking orbits due to its achievability (by both the robotic and crewed vehicles) and by its stability (e.g., no orbit maintenance is required). After the return of the asteroid to the Earth-Moon vicinity, the ARCM is executed and carries a crew of two astronauts to a DRO to rendezvous with the awaiting ARV with the asteroid. The outbound and inbound transfers employ lunar gravity assist (LGA) flybys to reduce the Orion propellant requirement for the overall nominal mission, which provides a nominal mission with some reserve propellant for possible abort situations. The nominal mission described in this report provides a better understanding of the mission considerations as well as the feasibility of such a crewed mission, particularly with regard to spacecraft currently undergoing development, such as the Orion vehicle and the Space Launch System (SLS).

Condon, Gerald↗

Minimum deltaV Burn Planning for the International Space Station Using a Hybrid Optimization Technique, Level 1

The International Space Station's (ISS) trajectory is coordinated and executed by the Trajectory Operations and Planning (TOPO) group at NASA's Johnson Space Center. TOPO group personnel routinely generate look-ahead trajectories for the ISS that incorporate translation burns needed to maintain its orbit over the next three to twelve months. The burns are modeled as in-plane, horizontal burns, and must meet operational trajectory constraints imposed by both NASA and the Russian Space Agency. In generating these trajectories, TOPO personnel must determine the number of burns to model, each burn's Time of Ignition (TIG), and magnitude (i.e. deltaV) that meet these constraints. The current process for targeting these burns is manually intensive, and does not take advantage of more modern techniques that can reduce the workload needed to find feasible burn solutions, i.e. solutions that simply meet the constraints, or provide optimal burn solutions that minimize the total DeltaV while simultaneously meeting the constraints. A two-level, hybrid optimization technique is proposed to find both feasible and globally optimal burn solutions for ISS trajectory planning. For optimal solutions, the technique breaks the optimization problem into two distinct sub-problems, one for choosing the optimal number of burns and each burn's optimal TIG, and the other for computing the minimum total deltaV burn solution that satisfies the trajectory constraints. Each of the two aforementioned levels uses a different optimization algorithm to solve one of the sub-problems, giving rise to a hybrid technique. Level 2, or the outer level, uses a genetic algorithm to select the number of burns and each burn's TIG. Level 1, or the inner level, uses the burn TIGs from Level 2 in a sequential quadratic programming (SQP) algorithm to compute a minimum total deltaV burn solution subject to the trajectory constraints. The total deltaV from Level 1 is then used as a fitness function by the genetic algorithm in Level 2 to select the number of burns and their TIGs for the next generation. In this manner, the two levels solve their respective sub-problems separately but collaboratively until a burn solution is found that globally minimizes the deltaV across the entire trajectory. Feasible solutions can also be found by simply using the SQP algorithm in Level 1 with a zero cost function. This paper discusses the formulation of the Level 1 sub-problem and the development of a prototype software tool to solve it. The Level 2 sub-problem will be discussed in a future work. Following the Level 1 formulation and solution, several look-ahead trajectory examples for the ISS are explored. In each case, the burn targeting results using the current process are compared against a feasible solution found using Level 1 in the proposed technique. Level 1 is then used to find a minimum deltaV solution given the fixed number of burns and burn TIGs. The optimal solution is compared with the previously found feasible solution to determine the deltaV (and therefore propellant) savings. The proposed technique seeks to both improve the current process for targeting ISS burns, and to add the capability to optimize ISS burns in a novel fashion. The optimal solutions found using this technique can potentially save hundreds of kilograms of propellant over the course of the ISS mission compared to feasible solutions alone. While the software tool being developed to implement this technique is specific to ISS, the concept is extensible to other long-duration, central-body orbiting missions that must perform orbit maintenance burns to meet operational trajectory constraints.

Brown, Aaron J.↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

Preliminary Design Considerations for Access and Operations in Earth-Moon L1/L2 Orbits

Within the context of manned spaceflight activities, Earth-Moon libration point orbits could support lunar surface operations and serve as staging areas for future missions to near-Earth asteroids and Mars. This investigation examines preliminary design considerations including Earth-Moon L1/L2 libration point orbit selection, transfers, and stationkeeping costs associated with maintaining a spacecraft in the vicinity of L1 or L2 for a specified duration. Existing tools in multi-body trajectory design, dynamical systems theory, and orbit maintenance are leveraged in this analysis to explore end-to-end concepts for manned missions to Earth-Moon libration points.

Folta, David C.↗

Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

Anderson, Herbert A.↗

In-Space Chemical Propulsion Systems Roadmap

In-space propulsion begins where the launch vehicle upper stage leaves off, performing the functions of primary propulsion, reaction control, station keeping, precision pointing, and orbital maneuvering. The main engines used in space provide the primary propulsive force for orbit transfer, planetary trajectories and extra planetary landing and ascent. The reaction control and orbital maneuvering systems provide the propulsive force for orbit maintenance, position control, station keeping, and spacecraft attitude control. Advanced in-space propulsion technologies will enable much more effective exploration of our Solar System and will permit mission designers to plan missions to "fly anytime, anywhere, and complete a host of science objectives at the destinations" with greater reliability and safety. With wide range of possible missions and candidate propulsion technologies, the question of which technologies are "best" for future missions is a difficult one. A portfolio of propulsion technologies should be developed to provide optimum solutions for a diverse set of missions and destinations. A large fraction of the rocket engines in use today are chemical rockets; that is, they obtain the energy needed to generate thrust by chemical reactions to create a hot gas that is expanded to produce thrust. A significant limitation of chemical propulsion is that it has a relatively low specific impulse (Is, or thrust per mass flow rate of propellant). A significant improvement (>30%) in Is can be obtained by using cryogenic propellants, such as liquid oxygen and liquid hydrogen, for example. Historically, these propellants have not been applied beyond upper stages.

Oxidizers↗