Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

WEST full tungsten operation with an ITER grade divertor

The mission of WEST (tungsten-W Environment in Steady-state Tokamak) is to explore long pulse operation in a full tungsten (W) environment for preparing next-step fusion devices (ITER and DEMO) with a focus on testing the ITER actively cooled W divertor in tokamak conditions. Following the successful completion of phase 1 (2016-2021), phase 2 started in December 2022 with the lower divertor made entirely of actively cooled ITER-grade tungsten mono-blocks. A boronization prior the first plasma attempt allowed for a smooth startup with the new divertor. Despite the reduced operating window due to tungsten, rapid progress has been made in long pulse operation, resulting in discharges with a pulse length of 100 s and an injected energy of around 300 MJ per discharge. Plasma startup studies were carried out with equatorial boron nitride limiters to compare them with tungsten limiters, while Ion Cyclotron Resonance Heating assisted startup was attempted. High fluence operation in attached regime, which was the main thrust of the first campaigns, already showed the progressive build up of deposits and appearance of dust, impacting the plasma operation as the plasma fluence increased. In total, the cumulated injected energy during the first campaigns reached 43 GJ and the cumulated plasma time exceeded 5 h. Demonstration of controlled X-Point Radiator regime is also reported, opening a promising route for investigating plasma exhaust and plasma-wall interaction issues in more detached regime. This paper summarises the lessons learned from the manufacturing and the first operation of the ITER-grade divertor, describing the progress achieved in optimising operation in a full W environment with a focus on long pulse operation and plasma wall interaction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Krylov winding and emergent coherence in operator growth dynamics

The operator wavefunction provides a fine-grained description of quantum chaos and of the irreversible growth of simple operators into increasingly complex ones. Remarkably, at finite temperature this wavefunction can acquire a phase that increases linearly with the operator’s size, a phenomenon called . Although size winding occurs naturally in a holographic setting, the emergence of a coherent phase in a scrambled operator remains mysterious from the standpoint of a thermalizing quantum many-body system. Here, in this article, we elucidate this phenomenon by introducing the related concept of , whereby the operator wavefunction acquires a phase which winds linearly with the Krylov index. We show that Krylov winding is a generic feature of quantum chaotic systems and is a direct consequence of the universal operator growth bound hypothesis. It gives rise to size winding under two additional conditions: (i) a low-rank mapping between the Krylov and size bases, which ensures phase alignment among operators of the same size, and (ii) the saturation of the "chaos-operator growth" bound 𝜆 𝐿 ≤ 2⁢𝛼 (with 𝜆 𝐿 the Lyapunov exponent and 𝛼 the growth rate), which ensures a linear phase dependence on size. For systems which do not saturate this bound, with ℎ = 𝜆 𝐿 /2⁢𝛼 < 1, the winding with Pauli size ℓ becomes superliner, behaving as ℓ 1/ℎ . We illustrate these results with two classes of microscopic models: the Sachdev-Ye-Kitaev (SYK) model and its variants, and a disordered 𝑘-local spin model.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Scrambling and quantum chaos indicators from long-time properties of operator distributions

Scrambling is a key concept in the analysis of nonequilibrium properties of quantum many-body systems. Most studies focus on its characterization via out-of-time-ordered correlation (OTOC) functions, particularly through the early-time decay of the OTOC. However, scrambling is a complex process which involves operator spreading and operator entanglement, and a full characterization requires one to access more refined information on the operator dynamics at several timescales. In this work we analyze operator scrambling by expanding the target operator in a complete basis and studying the structure of the expansion coefficients treated as a coarse-grained probability distribution in the space of operators. Here we study different features of this distribution, such as its mean, variance, and participation ratio, for the Ising model with longitudinal and transverse fields, kicked collective spin models, and random circuit models. We show that the long-time properties of the operator distribution display common features across these cases and discuss how these properties can be used as a proxy for the onset of quantum chaos. Finally, we discuss the connection with OTOCs and analyze the cost of probing the operator distribution experimentally using these correlation functions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Optimal Operation for Resilient and Economic Modes in an Islanded Alaskan Grid

Legacy energy management systems for distribution system or microgrids are typically driven by economics. During extreme events, resiliency can be defined as ability of the system to keep supplying critical loads. Resilient operation during extreme events (e.g. avalanche in Alaska) may require decision variables to be different and conflicting with economic operation. Operational objectives are driven by a complex consideration of the economic, reliable and resilient operation of the system: economic and reliable in normal operating state and resilient during extreme events. Challenge is to move between economic and resilient operation in optimal manner and setting up problem formulation and constraints specially with Distributed Energy Resources (DERs). In this paper, we focus on striking a balance between optimal economic and resilient operation using novel formulation and developed tool called Resiliency Enabled Energy System Operation Toolbox (RE-ESOT). Simulation results are provided for a real islanded grid in Alaska with battery energy systems.

50 EE - Wind and Water Power Program - Water (EE-4↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Real-Time Operations Manual for the IEEE 118 Bus Transmission Model

This document presents a sample operations manual for the IEEE 118 Bus Model, which is a synthetic test case developed in 1962 from a section of the transmission grid operated by American Electric Power (AEP). The model is one of the most used synthetic test cases for development of power system applications and is referenced by over 9000 papers. However, the model lacks any context for use with real-time energy management system (EMS) applications, including common considerations, such as generator ramp rates, reactive capabilities, operating limits, and other information typically used by power system operators for real-time decision making. This manual divides the IEEE 118 Bus Model into three operating areas, defines various operating limits, and sets recommended operating procedures for responding to a few types of emergency operating conditions. The manual can be used in support of a wide variety of human-in-the-loop evaluation methodologies for new advanced power applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancement of operational Flexibility of Power Plants Using IN740

Headers are crucial components within diverse industries, especially in the energy sector, as they enable the efficient transfer of fluids. The selection of materials for headers is determined by their specific applications; for example, Grade 91 and Grade 92 steels are commonly utilized. In our research, we recommend the adoption of INCONEL alloy 740 due to its exceptional robustness and heat-resistant characteristics. One critical parameter in header systems is the heat transfer coefficient, which directly influences the efficiency of heat exchange processes and can thereby impact the structural integrity of the headers. This coefficient is closely linked with factors such as the Nusselt number, which is influenced by fluid flow characteristics and thermal properties. The flow direction within headers, whether unidirectional or multidirectional—significantly affects the overall dynamics of heat transfer. This research focuses on exploring the behavior of headers, a specific pipeline system component, using ANSYS simulation software. The study aims to predict heat transfer and mechanical behavior within headers under various conditions through steady-state and transient simulations (parts 1 and 2 of the report). Key parameters such as heat transfer coefficient, velocity, and temperature are examined with the goal of optimizing header design. Part 3 of the report addresses the critical yet underexplored relationship between pressure drop and heat transfer coefficients in the transient flow regime within headers, specifically focusing on smooth horizontal circular tubes. Limited experimental work has been conducted in this area, prompting the need for comprehensive analysis. By leveraging machine learning techniques, this research aims to establish a correlation between pressure drop and heat transfer across various flow conditions, including laminar, transient, quasi-turbulent, and turbulent regimes. The data utilized for this analysis were meticulously gathered from existing literature, capturing simultaneous measurements of pressure drops and heat transfer. Part 4: In the context of power plants, header pipes are essential components that significantly influence system performance by facilitating the collection and distribution of steam. This report highlights the critical role of header pipes in enhancing reliability, efficiency, and overall power plant performance. A key aspect of this investigation is shape optimization, which aims to maximize performance while minimizing material usage. By focusing on shape optimization, this research contributes to improved efficiency and a reduced environmental footprint for power plant installations. The methodology developed in this study emphasizes optimizing header shapes to decrease reliance on expensive alloy materials and lower maintenance costs. Furthermore, a case study was conducted using a header from an operational power plant to validate the proposed optimization techniques. Finally, part 5 addresses the challenges associated with flexible operations in boiler systems, the study outlines several strategies for enhancing the durability and reliability of steam headers. Key approaches include material selection, which involves utilizing advanced materials with superior high-temperature properties and enhanced fatigue resistance to extend the lifespan of steam headers. Design modifications are also recommended, focusing on implementing changes that mitigate thermal stress and cyclic loading to reduce the likelihood of failures under varying operating conditions. Additionally, the study emphasizes the importance of regular inspection and monitoring by establishing rigorous protocols to detect early signs of damage, allowing for timely maintenance and minimizing the risks of catastrophic failures. Furthermore, operational guidelines are developed to minimize the frequency and severity of thermal transients, ensuring stable and efficient operations. Collectively, these strategies provide a robust framework for overcoming the unique challenges posed by flexible operation in boiler systems, ultimately contributing to improved reliability and performance in power plant operations. Through this comprehensive approach, the study not only enhances the understanding of pressure drop and heat transfer relationships but also promotes advancements in design and operation that will benefit the entire power generation industry.

01 COAL, LIGNITE, AND PEAT↗

Resilient Operation of Networked Community Microgrids with High Solar Penetration

This project, funded by the US Department of Energy’s Solar Energy Technologies Office (SETO), focused on the operation of microgrids as a coordinated network. The primary objective, which was successfully achieved, was to develop both control strategies and hardware solutions to support the resilient and efficient operation of networked microgrids with high solar penetration. The work was structured around the following four main tasks: • Development of distributed and scalable optimization algorithms for AC-coupled networked microgrids. • Design and implementation of a novel DC interconnection hardware to enable precise power exchange between microgrids. • Laboratory operational validation of the developed technologies using 480 V testbeds and commercially available hardware. • Field operational validation of the complete solution in Adjuntas, Puerto Rico, interconnecting two kW-scale, split-phase microgrids of Casa Pueblo’s microgrids. This project addressed multiple technical challenges across the domains of optimization, control, hardware interconnection, and protection. One of its key contributions was delivering tangible, real-world solutions for networking microgrids. In contrast to purely theoretical or simulation-based work, this project included full-scale hardware operational validation both in the lab and in the field. The work conducted as part of this project—in collaboration with the University of Puerto Rico; the University of Tennessee, Knoxville; the University of Central Florida; and Casa Pueblo—has advanced the state of the art in networked microgrids. Key contributions include the development of distributed control strategies, practical solutions for real-world implementation challenges, and the introduction of a novel DC interlink approach for microgrid interconnection. The project featured both laboratory and field validation using commercial off-the-shelf components. The field deployment successfully validated that a group of microgrids can operate in a coordinated manner, enabling precise power flow between systems and mutual support during extreme events. This project resulted in 15 journal publications and 15 conference papers; 5 graduate students and 15 undergraduate students were supported. The codes of distributed optimization and forecasting were made open-source through OSTI.gov for distributed optimization and forecasting. All the publications are available in the ORNL-hosted project landing page. The DC interlink with state-of-charge balancing control was operationally validated in Adjuntas by interconnecting two real-world, 240 V split-phase microgrids. To the best knowledge of the team, this represents the first operational validation of AC microgrids interconnected via DC-interlinks. As a culmination of this project, a follow-on grant was awarded to support the technology transfer of the distributed optimization framework to a commercial microgrid controller, Stellar Edge, developed by the California-based company New Sun Road.

14 SOLAR ENERGY↗

From Modular ADMS to Plug-and-Play Ops: Distribution Grid Operations with Platform-Level Orchestration to Enable Ambitious App Hosting

The core function of the distribution grid is to provide electricity to consumers affordably, reliably, and securely. In pursuing these core objectives, distribution utilities are accountable to customers, regulators, and in some cases, shareholders. Other third parties such as aggregators and microgrids can also have a stake in the smooth operation of the grid. Each of these stakeholders has economic, business, and/or governance objectives that inform their expectations of the distribution grid. This multi-objective, multi-stakeholder environment creates tension that must be reconciled to successfully design and operate the distribution grid. Innovative companies are competing to bring high-tech solutions to electric utilities and their customers that address each of these objectives. Many developers of advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) have adopted a modular architecture that allows grid operators to select functions and features according to their individual system needs. A modular platform also allows the solution provider to develop and integrate specific new product modules; however, the need to pursue multiple objectives with a fixed set of controllable devices makes integration expensive whether it is done at the product development stage or the deployment stage. This cost creates a significant barrier to adoption and can lengthen the product to market time of new solutions. To fundamentally address the complexity of system integration for distribution grid operations, the U.S. Department of Energy Office of Electricity has funded the GridAPPS-D project at PNNL, which streamlines integration by contributing to standards development, defining system architecture, applying advanced mathematics, and developing open-source software to demonstrate the concept of an open data-integration platform for distribution operations. The open data-integration platform concept enables system operators and solution providers to deploy ambitious, best-of-breed applications (or apps) without continually reengineering for integration. Ambitious apps developed by different solution providers will inevitably attempt to achieve different control objectives with the same set of controllable devices. If the open platform itself can resolve these conflicts in a way that achieves the best available outcomes for all apps, doesn’t restrict the ambitious design of apps, and ensures safe and secure operations, apps will be able to plug-and-play with the platform at the same time as other ambitious apps. In this paper, we describe a framework called App Deconfliction that empowers a platform to assign setpoints to controllable devices based on the values preferred by different apps (and even external stakeholder entities like customers or aggregators). The App Deconfliction framework is compatible with several methods for determining setpoint values. We present two methods based on game theory that provide a subtle built-in incentive structure for developers to adapt their apps to the fact that they will be operating in a moderated multi-app environment and to favor device setpoints that have the most effect on their objectives over those that have the least effect. Our simulation-based demonstrations have shown that game-theory-based deconfliction can lead to a 7% improvement in control space utilization compared to design-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Compressing micro-operations in scheduler entries in a processor

An electronic device includes a processor having a micro-operation queue, multiple scheduler entries, and scheduler compression logic. When a pair of micro-operations in the micro-operation queue is compressible in accordance with one or more compressibility rules, the scheduler compression logic acquires the pair of micro-operations from the micro-operation queue and stores information from both micro-operations of the pair of micro-operations into different portions in a single scheduler entry. In this way, the scheduler compression logic compresses the pair of micro-operations into the single scheduler entry.

Boyer, Michael W.↗

Operational Focused Data Analytics for Optimizing Radiation Portal Monitor-Based Nuclear Smuggling Detection Systems at Global Ports of Entry

The National Nuclear Security Administration’s Office of Nuclear Smuggling Detection and Deterrence has deployed a fleet of radiation portal monitors (RPMs) across the world at global ports of entry including seaports, airports, and land border crossings. These RPMs are integrated into radiation detection systems (RDS) that also include fixed cameras, optical character recognition (OCR) systems, primary scanning systems (e.g., X-ray or gamma-ray), and secondary scanning systems (e.g., spectroscopic radiation portal monitors, portable radiation detection systems). The data from these sensing technologies is collected at the Central Alarm Station (CAS) where servers and computers reside to control and operate the system. Operators utilize the data collected by the CAS and declared cargo information to make decisions on how to respond to an alarm.This work explores the use of CAS-located data, looking at both the sensor data streams and operator inputs, to perform analysis which supports customs and border protection agencies to improve training capability and operational effectiveness. We focus on analyzing site level effectiveness and behavior by rolling up CAS-located data collected from individual occurrences. To-date, more than 15 sites (e.g., seaports, airports, border crossings) have been analyzed in this manner with the goal of understanding system operations to verify effectiveness and recommend potential improvements. This work first aims to provide background information on relevant CAS-located data sources and our current operational system analytics process including example results. After summarizing our current analytic techniques, we discuss how the future data analytics systems can provide key benefits to improving operational performance while minimizing the burden these detection systems place on operators.

Kuhn, Michael↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fitness-for-Service Analysis of Reactor Components under Flexible Load-Following Operating Conditions

Conventional power-generation plants, including nuclear plants, have been traditionally designed to provide a steady baseload energy capacity, optimizing output efficiency while minimizing variable costs. However, the growing adoption of large-scale renewable energy-generation systems, which rely on intermittent sources such as solar and wind, has introduced more variability into the energy supply in interconnected electricity grids. As a result, the next generation of power plants needs to operate in what is known as the load-following mode, requiring flexible adjustments in electricity production to align with the energy demand on the grid. This transition from the steady baseload operation to load-following operating conditions can significantly increase the number of times various plant components are exposed to transient stresses. This increased thermo-mechanical cycling can lead to accelerated material degradation, thereby elevating the risk of premature failure of a component. It becomes imperative to conduct a comprehensive analysis of fatigue, creep-fatigue, and stress corrosion cracking life, to assess the resilience of the various engineering components under these flexible load-following operating conditions. This study aims to develop a comprehensive numerical model of a light-water reactor pressure vessel (RPV) to investigate its degradation under various operating scenarios. This coupled thermo-mechanical finite element analysis evaluated the stress response of the RPV caused by considering fluctuations in thermal and mechanical loads caused by the varying pressure and temperature occurring during the load-following operation. Critical locations on the RPV are subsequently identified based on the stress response. The stress intensity factors for the postulated flaws at those locations are then calculated, followed by an evaluation of the reactor's life in accordance with the ASME Boiler and Pressure Vessel Code Section XI. This comprehensive life assessment covers a number of transients expected during the flexible load-following operation, providing invaluable insights into the RPV's structural integrity. Moreover, the development methodology can be adapted to other reactor components, as well as components of conventional power stations that are affected by varying operating conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗