Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Making Human Spaceflight Practical and Affordable: Spacecraft Designs and their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost becomes increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. The ability to perceive the operational implications of design decisions is crucial in developing safe yet cost competitive space transportation systems. Any human spaceflight program - government or commercial - must make countless decisions either to implement spacecraft system capabilities or adopt operational constraints or workarounds to account for the lack of such spacecraft capabilities. These decisions can benefit from the collective experience that NASA has accumulated in building and operating crewed spacecraft over the last five decades. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs - including the Space Shuttle and International Space Station - are provided to illustrate design traits that either increase or increase cost and complexity associated with spacecraft operations. These examples address factors such as overall design performance margins, levels of redundancy, degree of automated failure response, type and quantity of command and telemetry interfaces, and the definition of reference scenarios for analysis and test. Each example - from early program requirements, design implementation and resulting real-time operations experience - to tell the end-to-end "story" Based on these experiences, specific techniques are recommended to enable earlier and more effective assessment of operations concerns during the design process. A formal method for the assessment of spacecraft operability is defined and results of such operability assessments for recent spacecraft designs are provided. Recent experience in applying these techniques to Orion spacecraft development is reviewed to highlight the direct benefits of early operational assessment and collaborative development efforts.

Crocker, Alan R.↗

Evolution and Implementation of the NASA Robotic Conjunction Assessment Risk Analysis Concept of Operations

Reacting to potential on-orbit collision risk in an operational environment requires timely and accurate communication and exchange of data, information, and analysis to ensure informed decision-making for safety of flight and responsible use of the shared space environment. To accomplish this mission, it is imperative that all stakeholders effectively manage resources: devoting necessary and potentially intensive resource commitment to responding to high-risk conjunction events and preventing unnecessary expenditure of resources on events of low collision risk. After 10 years of operational experience, the NASA Robotic Conjunction Assessment Risk Analysis (CARA) is modifying its Concept of Operations (CONOPS) to ensure this alignment of collision risk and resource management. This evolution manifests itself in the approach to characterizing, reporting, and refining of collision risk. Implementation of this updated CONOPS is expected to have a demonstrated improvement on the efficacy of JSpOC, CARA, and owner/operator resources.

operations↗

Impact of suprathermal ions on neutron yield in the pre-DT phase of ITER operation

An assessment of neutron production during the pre-fusion power-operation (PFPO) phase has been carried out for a representative set of plasma scenarios predicted by the ITER Research Plan. A range of heating systems, namely neutral beam injection (NBI) (hydrogen), electron cyclotron resonance heating (ECRH), and ion cyclotron resonance heating (ICRH) are planned to be used for PFPO studies in helium, hydrogen, and mixed hydrogen–helium plasmas. Fast ions (protons and 3He) originating from NBI and ICRH systems can increase neutron production in PFPO plasmas by directly interacting with intrinsic Be impurities or through secondary processes, as also evidenced at JET. The generation of fast ions in ITER PFPO scenarios has been modelled using the ASTRA-NBI and TORIC-SSFPQL codes. A significant impact of the synergy between hydrogen NBI and hydrogen-minority ICRH on neutron production in helium plasmas is reported. In addition, the stability of the toroidicity-induced Alfvén eigenmodes (TAE) is analyzed for PFPO plasmas with a high pressure of suprathermal ions and a weak reversed shear. The possible impact of sawtooth oscillations and TAEs on neutron production is discussed, based on a linear stability analysis.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Airborne simulation of Shuttle/Spacelab management and operation

The ASSESS (Airborne Science/Spacelab Experiments System Simulation) program is discussed. A simulated Spacelab operation was carried out aboard the CV-990 airborne laboratory at Ames Research Center. A scientific payload was selected to conduct studies in upper atmospheric physics and infrared astronomy with principal investigators from France, the Netherlands, England and the U.S. Two experiment operators (EOs) from the U.S. and two from Europe were trained to function as proxies for the principal investigators in operating, maintaining, and repairing the scientific instruments. The simulated mission, in which the EOs and a Mission Manager were confined to the aircraft and living quarters for a 1-week period while making scientific observations during nightly flights, provided experience in the overall management of a complex international payload, experiment preparation, testing, and integration, the training and selection of proxy operators, and data handling.

Mulholland, D. R.↗

Assessing Resilience of Scheduled Performance-Based Navigation Arrival Operations

This paper assesses the resilience of scheduled Performance-Based Navigation (PBN) arrival operations. Resilience is defined as an ability to return to nominal operations following a schedule perturbation. Results from a Human-in-the- Loop (HITL) experiment that included off-nominal events to perturb the schedule are described. The schedule comes from a precision trajectory-based arrival manager. The experiment collected data regarding the response to perturbed schedules in three conditions, where: 1) a disturbance rejection algorithm made schedule adjustments automatically, 2) a Traffic Management Coordinator (TMC) participant made schedule adjustments manually, or 3) no schedule adjustments were made. Analyses showed that the simulation’s scheduled PBN operations have inherent resilience, recovering from more than half of the perturbed schedules even with no schedule adjustments. Resilience to the same off-nominal events improved with schedule adjustments; an increased proportion of perturbed schedules recovered within the length of operation run, and the average duration of the schedule’s perturbed state decreased. Compared to the manual schedule adjustments condition, a greater number of schedule adjustments occurred for the same off-nominal events in the automated condition. However, perturbed schedules were recovered more frequently and perturbations were less severe in the automated condition. Subjective and objective workload in the manual and the automated schedule adjustment conditions were similar to the no schedule adjustment condition.

Resilience↗

An Assessment of Civil Tiltrotor Concept of Operations in the Next Generation Air Transportation System

Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).

Chung, William W.↗

Readiness Evaluation for Sustained Operations

Readiness evaluation for sustained operations is a continuous function that progresses from overseeing establishment of five key programmatic elements during design and construction phases to monitoring the output of those elements performing during commissioning and operations. Continuously assessing readiness for sustained operations becomes an important business function for the U.S. Department of Energy’s Office of River Protection as competition for federal funds increases with increasing waste treatment operations throughout the Office of Environmental Management complex. The five key programmatic elements are as follows: Risk management – Risks and opportunities should prioritize continuous improvement initiatives and be informed by the design and technical authorities and stakeholder monitors. Continuous improvement – All levels of the project organization should exhibit commitment to continuous improvement and learning. Continuity of design and technical authorities – The authorities are responsible for managing knowledge for its effective use in the other elements. Stakeholder monitoring – Active and deliberate monitoring of stakeholder relationships. Sustained operations integrated business planning – Integrated business planning in a federal environment competitive for congressional funding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Probability of Assessment for Central Alarm Station Operators

This project focused on developing and analyzing a method that could be employed by operational nuclear facilities to evaluate their CAS operators and determine a probability of assessment for each operator. This method is agnostic of alarm communication and display system (AC&D), sensors and cameras in place in the field, and any other technical security measures. This security-measure-agnostic method enables operational facilities to adopt it to determine the effectiveness of their alarm station operators.

42 ENGINEERING↗

The NASA Robotic Conjunction Assessment Process: Overview and Operational Experiences

Orbital debris poses a significant threat to spacecraft health and safety. Recent events such as China's anti-satellite test and the Breeze-M rocket explosion have led to an even greater awareness and concern in the satellite community. Therefore, the National Aeronautics and Space Administration (NASA) has established requirements that routine conjunction assessment screening shall be performed for all maneuverable spacecraft having perigees less than 2000 km or within 200 km of geosynchronous altitude. NASA s Goddard Space Flight Center (GSFC) has developed an operational collision risk assessment process to protect NASA s high-value unmanned (robotic) assets that has been in use since January 2005. This paper provides an overview of the NASA robotic conjunction assessment process, including descriptions of the new tools developed to analyze close approach data and of the risk mitigation strategies employed. In addition, statistical data describing the number of conjunctions experienced are presented. A debris avoidance maneuver performed by Aura in June of 2008 is described in detail to illustrate the process.

Newman, Lauri Kraft↗

Investigating Risks Due to Artemis EVA Tempo Via Probabilistic Risk Assessment

Spaceflight operations pose unique challenges to crew health, safety, and resource management. As space agencies and private companies continue to push the boundaries of human exploration, it is essential to understand the risks associated with Extravehicular Activities (EVAs) and develop strategies to mitigate them. The tempo at which EVAs are conducted – the total number and frequency of these activities – can have a profound impact on medical risks, resource consumption, and overall mission success. Probabilistic risk assessment (PRA) provides a powerful framework for evaluating complex systems and identifying potential hazards. Our work employs the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) [1] to simulate mission events, occurrence and treatment of medical conditions, and track the utilization of resources. Coupled with the Evidence Library [2], a medical evidence base for exploration-class missions developed by the Exploration Medical Capability within NASA’s Human Research Program, we can estimate these risks with increased fidelity and optimize medical kit contents to meet specific mission requirements. This presentation provides a detailed examination of how EVA tempo influences medical risk estimates for a lunar surface design reference mission. A comprehensive analysis is conducted to assess the additional mass and volume burden imposed on medical kits required to maintain adequate levels of risk mitigation. Furthermore, we estimate the distribution of the number of successful EVAs completed based on the level of task impairment imposed by medical events and flight rules related to specific medical events, such as decompression sickness.

Modeling↗

Assessing Dual Sensor Enhanced Flight Vision Systems to Enable Equivalent Visual Operations

Flight deck-based vision system technologies, such as Synthetic Vision (SV) and Enhanced Flight Vision Systems (EFVS), may serve as a revolutionary crew/vehicle interface enabling technologies to meet the challenges of the Next Generation Air Transportation System Equivalent Visual Operations (EVO) concept - that is, the ability to achieve the safety of current-day Visual Flight Rules (VFR) operations and maintain the operational tempos of VFR irrespective of the weather and visibility conditions. One significant challenge lies in the definition of required equipage on the aircraft and on the airport to enable the EVO concept objective. A motion-base simulator experiment was conducted to evaluate the operational feasibility, pilot workload and pilot acceptability of conducting straight-in instrument approaches with published vertical guidance to landing, touchdown, and rollout to a safe taxi speed in visibility as low as 300 ft runway visual range by use of onboard vision system technologies on a Head-Up Display (HUD) without need or reliance on natural vision. Twelve crews evaluated two methods of combining dual sensor (millimeter wave radar and forward looking infrared) EFVS imagery on pilot-flying and pilot-monitoring HUDs as they made approaches to runways with and without touchdown zone and centerline lights. In addition, the impact of adding SV to the dual sensor EFVS imagery on crew flight performance, workload, and situation awareness during extremely low visibility approach and landing operations was assessed. Results indicate that all EFVS concepts flown resulted in excellent approach path tracking and touchdown performance without any workload penalty. Adding SV imagery to EFVS concepts provided situation awareness improvements but no discernible improvements in flight path maintenance.

Kramer, Lynda J.↗

LDRD23-0184: Resilience and Hazard Risk Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI)

Recent examples provide a significant concern for the resilience of the U.S. electric grid and represent a need for enhanced decision-making to address an increasingly wide range of complex system interactions and potential consequences. In response, this LDRD project produced a proof-of-concept evaluation called the Resilience and Hazard Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI) methodology as an agile and flexible analytic framework capable of addressing multiple, diverse threats to desired electric grid performance. After empirically grounding needs for the future of U.S. electric grid resilience, this project employed the systems-theoretic process analysis (STPA) to develop a systems engineering risk model. The results of a completed feasibility study of a notional high voltage transmission system demonstrate an improved ability to incorporate both spatial (e.g., geographically distributed) and temporal (e.g., dynamic and time-dependent) elements of security risk to the gird. The success of this LDRD project provides the foundation for further evolution of the systems engineering risk model for the grid; derivation of quantitative approaches to evaluate risk and resilience performance; facilitation of agile experimenting and grid sensitivity to a range of vulnerabilities; and development of tools to assist decision-makers in enhancing U.S. electrical grid resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safe Exploration: Sensorimotor Assessments for Early Extravehicular Activities

BACKGROUND: Artemis missions will require a new level of crew autonomy around periods of gravitational transition, where sensorimotor disturbances are at their highest. There is a need to define performance thresholds for key sensorimotor assessments that indicate when performance in early extravehicular activities (EVAs) might be impacted or unsafe. This panel presentation will discuss the development of sensorimotor assessments for determining crew preparedness of early EVAs by utilizing a novel portable sensorimotor disorientation analog and other spaceflight analogs. OVERVIEW: To define performance thresholds, a proposed set of sensorimotor assessment tasks must be validated under various spaceflight analogs. A Sensorimotor Disorientation Analog (SDA) was developed that could induce varying levels of disorientation through combined vestibular (galvanic vestibular stimulation (GVS)) and proprioceptive (weighted chest, ankles, and wrists) disruptions. The SDA was first pilot tested using subjective feedback from previously flown astronauts to determine the levels of disorientation that mimic motor performance immediately (R+0) and +24 hours (R+1) postflight. A second study was performed using healthy non-astronaut ground subjects to validate the SDA levels by comparing to astronaut postflight data. The validated SDA was utilized in a third study to map performance in the proposed set of sensorimotor assessment tasks to operational tasks. The assessment tasks were defined based on lessons learned from Apollo and subject matter experts (e.g., flight surgeons) to include the following: 1) aid in progressive adaptation to the novel gravitational environment; 2) provide opportunities to develop strategies to recover from off-nominal body positions; and 3) mimic operational tasks such that crew can self-assess their potential ability to complete their missions. This presentation will conclude with a discussion on future validation studies of the proposed assessment tasks using other spaceflight analogs such as centrifugation and gravity offload systems. DISCUSSION: Exploration class missions will require crew to be able to self-assess and treat their sensorimotor dysfunction after gravity transitions, and in off-nominal situations they may be required to perform provocative, challenging tasks soon after landing. This panel presentation will discuss current and ongoing research strategies to address the sensorimotor risk on safe exploration during Artemis missions.

Sarah Moudy↗

Testing in Support of Space Fission System Development and Qualification

Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. Realistic non-nuclear testing is most useful for systems operating within known temperature, irradiation damage, and burnup capabilities.

Houts, Mike↗

Port of New York and New Jersey Drayage Electrification Analysis

The National Renewable Energy Laboratory (NREL) evaluated the potential for drayage electrification in the Port of New York and New Jersey (PoNYNJ), with a focus on operators: Harbor Freight Transport (HF), Safeway Trucking (SWT), and International Motor Freight Inc (IMF). This report summarizes the data collection and electrification evaluation of all three drayage operators, includes detailed operational data, and identifies the performance requirements for battery electric tractors (BETs) and corresponding infrastructure operated within the context of PoNYNJ drayage operation. This report also details a methodology to evaluate opportunities, strategies, and challenges associated with future expansions of BETs in meeting PANYNJ emissions goals. The Port Authority has established a goal of achieving Net Zero carbon emissions by 2050 across all facilities, including from tenant and stakeholder sources such as drayage trucks. NREL used real-world performance data collected on the three PoNYNJ drayage operations, along with modeling and analysis tools to compare BET to diesel trucks. From March to July 2021, NREL collected 1Hz vehicle and engine data from 46 drayage trucks at the three operators totaling nearly 121,000 miles of operation, providing enough information to assess vehicle operations for electrification potential. A Future Automotive Systems Technology Simulator (FASTSim) electric truck powertrain model was validated using PoNYNJ data and scenarios were run to evaluate drayage truck electrification requirements over the real-world cycles. The first scenario examined BET viability with minimal changes to existing operations. This assumes the trucks charge when stopped for two hours or longer, have a functional battery size of 375 kWh, and can charge at 270 kilowatts (kW) average which are the specification of the commercially available Freightliner eCascadia. The second scenario looked at what operational, charging infrastructure, and BET technology changes would be needed to fully electrify. Finally, detailed analysis was run on charging rate structure to understand operational costs to the fleets. The studied drayage trucks averaged 5.1 MPG, spent roughly 9% of their energy at idle, and drove an average of 140 miles per day with a maximum daily distance of 573 miles. The FASTSim model results indicate a comparable BET would use 417 kWh of energy per day on average accounting for cargo weight, which is close to the full usable capacity of the eCascadia currently available on the market. Based on the daily average operating data, partial fleet electrification is possible with current technology. However, some specific days of operation would require over 1,600 kWh of energy due to longer distances traveled by the trucks and more intense operation. Trucks used for long distance and intense operation cannot be readily electrified with current technology without operational changes. Full adoption of BETs could reduce CO 2 emissions from these fleets by roughly 75% today, eliminating 76 metric tons of CO 2 (MTCO 2 ) per vehicle each year, which equates to 24,100 MTCO 2 per year for all three operators. Commercially available direct current fast chargers (DCFC) have charge rates up to 350 kW. Based on the average daily modeled energy use for each operator, current industrial rate structures, and the assumption of 350 kW peak charging, full drayage electrification would increase electricity consumption. In addition, peak demand usage would increase with unmanaged charging along with cost of electricity having a direct impact on cost per mile for electric vehicles. The resulting cost per mile for BETs along with comparable cost per mile for conventional diesel trucks are also examined at $\$$4.00 per gallon of diesel. It will be important for PANYNJ and the drayage operators within the PoNYNJ to consider these load impacts to their existing electrical infrastructure and devise operational strategies that avoid coincident charging of vehicles to mitigate demand charges. Despite these electricity cost increases, savings from reductions in diesel consumption will help offset the costs of this increased electricity consumption. However, prices of both electricity and diesel are subject to change based on various factors meaning the realized savings will vary over time. This shows BETs could be cost-competitive on an energy cost per mile basis for all scenarios while diesel is above $\$$3.00/gal. Further, if diesel prices dropped to the 15-year low of $2.33/gal, it would still be cost competitive to operate the EVs with electricity costs of 16.3 ¢/kWh or less.

33 ADVANCED PROPULSION SYSTEMS↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

The Large Area Crop Inventory Experiment /LACIE/ - An assessment after one year of operation

A Large Area Crop Inventory Experiment (LACIE) has been undertaken jointly by the U.S. Department of Agriculture (USDA), the National Oceanic and Atmospheric Administration (NOAA) of the Department of Commerce and the National Aeronautics and Space Administration (NASA) to prove out an economically important application of remote sensing from space. The first phase of the Experiment, which focused upon determinations of wheat area in the U.S. Great Plains and upon the development and testing of yield models, is now nearing completion. The system implemented to handle and analyze the Landsat and meteorological data has generally worked well and met operational goals. A very preliminary assessment of results to date indicates that the accuracy goals of the experiment can be met.

Macdonald, R. B.↗